Laserfiche WebLink
0 <br /> Mortenson Office Trailer Narrative A 0 <br /> Mortenson plans to set up 3 units at 2_91:10-Ma0 St. 3 `'�0��,�j <br /> The first unit is a 4 plex that is 48 x 64. It will have 2 restrooms hooked to a fresh water and <br /> wastewater tanks.The access to the trailer will be a ramp to a deck.This trailer will be used for our <br /> staffs office.This unit is planned to be installed on Feb. 21'2022. T3 Z Z-bPdi't <br /> The Second unit is a 3 plex that is 36 x 64. It will have 2 restrooms hooked to a fresh water and <br /> wastewater tanks.The access to the trailer will be a ramp to a deck.This trailer will be used for a <br /> conference room.This unit is planned to be installed on April 4th 2022. ' Z ��--vH <br /> The 3rd unit is a double wide that is 24 x 64. It will have 1 restroom hooked to a fresh water and /53 G <br /> wastewater tanks.The access to the trailer will be a ramp to a deck.This trailer will be used for a <br /> conference room.This unit is planned to be installed on June 1st 2022. 3-).:2D 2__bLZ <br /> WE plan to submit for 3 separate permits. I <br /> Chris Peterson,Sr.Superintendent <br /> Seattle Operating Group <br /> 10230 NE Points Drive,Suite 300l����lAk3 J/\ utPt <br /> Kirkland, WA 98033 • <br /> Mortenson Let's Redefine Possible"' Uv v WM1 <br /> I <br /> mobile 425.350.6404 I t1/ a 111 V t C/1/ ; <br /> chris.peterson@mortenson.com <br /> www.mortenson.com/Seattle <br /> C)22A1) (2 <br /> Uv <br />