My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-29 <br />related to, such a Submittal. Contractor acknowledges and agrees that it may not rely <br />upon receiving the City’s response to a Submittal in less than 14 calendar days, unless <br />the City explicitly changes this section by a signed Change Order. <br />1-05.3(2) Requests for Information <br />(*****) <br />Requests for information or clarification from the Contractor to the City shall be treated <br />as a Submittal pursuant to 1-05.3(1) SUBMITTALS. <br />1-05.4 Conformity With and Deviations From Plans and Stakes <br />Delete all of 1-05.4 and substitute the following: <br />The Contractor shall be responsible for setting and maintaining all alignment stakes, <br />slope stakes, and grades necessary for the construction of the roadbed, surfacing, <br />paving, channelization, illumination, signing, bridges, and retaining walls, if such <br />construction is included in this Project. Except for the survey control data to be furnished <br />by the City, calculations, surveying, and measuring required for setting and maintaining <br />the necessary lines and grades shall be the Contractor's responsibility. The Contractor <br />shall provide the City with copies of such calculations and staking data when requested <br />by the Engineer. Copies of the City provided survey control data are available for the <br />Bidder's inspection at the office of the Project Engineer. <br />Any staking requirements for the Project that do not fit field conditions will be reviewed <br />and if necessary adjusted by the Engineer. Any necessary revisions to the staking <br />information will be provided to the Contractor for use in completing the Work. <br />Stakes, marks, and other reference points, including existing monumentation, set by the <br />City shall be carefully preserved by the Contractor. The Contractor will be charged for <br />the costs of replacing stakes, markers and monumentation that were not to be disturbed <br />but were destroyed or damaged by the Contractor's operations. This charge will be <br />deducted from monies due or to become due to the Contractor. <br />To facilitate the establishment of these lines and elevations, the City will provide the <br />Contractor with the following survey control: <br />ROADWAY, SURFACING AND PAVING <br />Establish elevation bench marks and center or base line alignment control points <br />for the mainline, one time only. Provide right of way stakes where applicable. <br />Provide rights-of-way, easements or right-of-entry. <br />Provide the Contractor with technical advice if requested. <br />Computed grades where needed. <br />Provide horizontal and vertical curve data. <br />One copy of transit notes showing reference to horizontal and vertical control <br />points. <br />OTHER STRUCTURES <br />Centerline or offset coordinates to centerline of the structure. <br />A sufficient number of benchmarks for levels to enable the Contractor to set <br />grades at reasonably short distances. <br />Monuments and control points as shown on the Plans.
The URL can be used to link to this page
Your browser does not support the video tag.