Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-28 <br />7-03 Structural Plate Pipe, Pipe Arch, Arch and Underpass <br />7-03.2 Materials-Catalog Cuts or Standard Plans <br />7-04 Storm Sewers <br />7-04.2 Materials-Catalog Cuts or Standard Plans <br />7-05 Manholes, Inlets, Catch Basins, and Drywells <br />7-05.2 Materials-Catalog Cuts or Standard Plans <br />7-09 Water Mains <br />7-09.2 Materials-Catalog Cuts or Standard Plans <br />7-12 Valves For Water Mains <br />7-12.2 Materials-Catalog Cuts or Standard Plans <br />7-14 Hydrants <br />7-14.2 Materials-Catalog Cuts or Standard Plans <br />7-15 Service Connections <br />7-15.2 Materials-Catalog Cuts or Standard Plans <br />7-17 Sanitary Sewers <br />7-17.2 Materials-Catalog Cuts or Standard Plans <br />DIVISION 8 MISCELLANEOUS CONSTRUCTION <br />8-11 Guardrail <br />8-11.2 Materials-Catalog Cuts or Standard Plans <br />8-12 Chain Link Fence and Wire Fence <br />8-12.2 Materials-Catalog Cuts or Standard Plans <br />8-13 Monument Cases <br />8-13.2 Materials-Standard Plans <br />8-27 Metal Hand Railings (New Section) <br />8-27.1(1) Ornamental Handrail-Shop Drawings <br />8-27.1(2) Pedestrian Handrail (Galvanized Steel and Aluminum)-Shop <br />Drawings <br />Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br />Contractor and approved by the Engineer. Where a Working Drawing is required by the <br />Specifications, related Work performed prior to completion of the Engineer's review of <br />the pertinent submission will be the sole expense and responsibility of the Contractor. <br />Supplement 1-05.3 by adding the following: <br />1-05.3(1) Submittals <br />(*****) <br />Where required by the Contract Documents, the Contractor shall submit information, <br />such as Working Drawings that will enable the City’s Representative to advise the City <br />whether the Contractor's proposed materials, Equipment or methods of work are in <br />general conformance to the design concept and in compliance with the Plans and <br />Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br />complying with Contract requirements. The City’s approval of a Submittal does not <br />constitute a waiver of the Contract requirements. The City will not be obligated to accept <br />or pay for Work performed by the Contractor that may be affected by materials, <br />Equipment, or methods of work not submitted in a timely manner so that final review can <br />be accomplished before the affected Work is complete. The City shall not be responsible <br />for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part <br />by Contractor’s failure to submit required information in sufficient time for review, <br />comment, and correction. Contractor’s failure to submit required information in sufficient <br />time for review, comment and correction shall be deemed a waiver of any and all <br />Contract Claims for adjustment of Contract Sum or Contract Time arising out of, or