My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-28 <br />7-03 Structural Plate Pipe, Pipe Arch, Arch and Underpass <br />7-03.2 Materials-Catalog Cuts or Standard Plans <br />7-04 Storm Sewers <br />7-04.2 Materials-Catalog Cuts or Standard Plans <br />7-05 Manholes, Inlets, Catch Basins, and Drywells <br />7-05.2 Materials-Catalog Cuts or Standard Plans <br />7-09 Water Mains <br />7-09.2 Materials-Catalog Cuts or Standard Plans <br />7-12 Valves For Water Mains <br />7-12.2 Materials-Catalog Cuts or Standard Plans <br />7-14 Hydrants <br />7-14.2 Materials-Catalog Cuts or Standard Plans <br />7-15 Service Connections <br />7-15.2 Materials-Catalog Cuts or Standard Plans <br />7-17 Sanitary Sewers <br />7-17.2 Materials-Catalog Cuts or Standard Plans <br />DIVISION 8 MISCELLANEOUS CONSTRUCTION <br />8-11 Guardrail <br />8-11.2 Materials-Catalog Cuts or Standard Plans <br />8-12 Chain Link Fence and Wire Fence <br />8-12.2 Materials-Catalog Cuts or Standard Plans <br />8-13 Monument Cases <br />8-13.2 Materials-Standard Plans <br />8-27 Metal Hand Railings (New Section) <br />8-27.1(1) Ornamental Handrail-Shop Drawings <br />8-27.1(2) Pedestrian Handrail (Galvanized Steel and Aluminum)-Shop <br />Drawings <br />Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br />Contractor and approved by the Engineer. Where a Working Drawing is required by the <br />Specifications, related Work performed prior to completion of the Engineer's review of <br />the pertinent submission will be the sole expense and responsibility of the Contractor. <br />Supplement 1-05.3 by adding the following: <br />1-05.3(1) Submittals <br />(*****) <br />Where required by the Contract Documents, the Contractor shall submit information, <br />such as Working Drawings that will enable the City’s Representative to advise the City <br />whether the Contractor's proposed materials, Equipment or methods of work are in <br />general conformance to the design concept and in compliance with the Plans and <br />Specifications. Approval or acceptance of a Submittal does not relieve Contractor from <br />complying with Contract requirements. The City’s approval of a Submittal does not <br />constitute a waiver of the Contract requirements. The City will not be obligated to accept <br />or pay for Work performed by the Contractor that may be affected by materials, <br />Equipment, or methods of work not submitted in a timely manner so that final review can <br />be accomplished before the affected Work is complete. The City shall not be responsible <br />for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part <br />by Contractor’s failure to submit required information in sufficient time for review, <br />comment, and correction. Contractor’s failure to submit required information in sufficient <br />time for review, comment and correction shall be deemed a waiver of any and all <br />Contract Claims for adjustment of Contract Sum or Contract Time arising out of, or
The URL can be used to link to this page
Your browser does not support the video tag.