My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-40 <br />1-05.19(2) Meetings with City <br />The Contractor shall have its duly authorized representative attend periodic informational <br />meetings with the City’s Representative and City staff, as reasonably required by the <br />City. <br />Contractor, City, and City’s Representative shall meet as often as determined by the <br />City’s Representative, but no less often than once each month. The purpose of the <br />meeting is to review Project status in relation to the construction schedule; review value <br />of Work completed during the previous month; and, if applicable, review Contractor's <br />plans to return Project status to that required by the schedule. If requested by the City or <br />City’s Representative, the Contractor shall submit a written progress report within five <br />days following this meeting, comprising: <br />The current construction schedule indicating percent complete, actual completion or start <br />dates since the previous review, the estimated remaining duration for each activity in <br />progress, Schedule of Values update, and narrative summary. <br />Reasons any activities are behind schedule and the corrective steps being taken. <br />1-05.19(3) Cooperation with Others <br />The Contractor agrees to permit entry to the work site by the City, its employees or other <br />contractors performing Work on behalf of the City or Mall. The Contractor shall afford to <br />the City, Mall, other contractors and their employees, reasonable facilities and <br />cooperation and arrange its work and dispose of its materials in such a manner as to not <br />interfere with the activities of the City or of others upon the site of Work. The Contractor <br />shall promptly make good Contractor-caused injury or damage to persons or property <br />that may be sustained by other contractors or employees of the City. The Contractor <br />shall join its Work to that of others and perform its Work in proper sequence in relation to <br />that of others. <br />If requested by the Contractor, the City will arrange meetings with other contractors <br />performing Work on behalf of the City to plan coordination of construction activities. The <br />Contractor shall inform itself of the planned activities of other contractors and will <br />coordinate its Work with the other contractors. <br />Contractor shall notify the City of problems, interference or any difficulty with other <br />contractors or workers engaged by the City. The Notice shall be sufficiently prompt and <br />specific so as to allow the City to mitigate or avoid increased costs, time of performance, <br />damages or injury. Contractor’s failure to provide such Notice in a timely way shall be <br />deemed a waiver and release of any and all Contract Claims relating to, arising out of, or <br />caused by, any alleged interference, difficulty or problem with another contractor or <br />worker engaged by the City. <br />1-06 CONTROL OF MATERIAL <br />Supplement Section 1-06 as follows: <br />References to materials shall also mean Contractor furnished Equipment, if any, as <br />specified in these Special Provisions. <br />1-06.1 Approval of Materials Prior to Use <br />Revise the first paragraph of 1-06.1 to read as follows:
The URL can be used to link to this page
Your browser does not support the video tag.