My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-41 <br />Prior to use, Contractor shall notify the Engineer of all proposed materials. Contractor <br />may use the Qualified Product List (QPL) and the Aggregate Source Approval (ASA) <br />Database. Contractor shall use the Request for Approval of Material (RAM) form. <br />Supplement 1-06.1 by adding the following: <br />Contractor shall provide product data, when specified, in accordance with 1-05.3(1) <br />SUBMITTALS of these Special Provisions for inspecting, testing, operating, or <br />maintaining Equipment and materials supplied as part of the Work. Unless otherwise <br />specified, such data shall be provided at the time the referenced material or Equipment <br />is delivered to the job site. Contractor shall provide data as specified and include, unless <br />otherwise specified, but not be limited to shop drawings, erection drawings, reinforcing <br />steel schedules, testing and adjusting instructions, operations manuals, maintenance <br />procedures, parts lists, and record drawings. Contractor shall provide data as part of the <br />Work under this Contract and its acceptability will be determined by the City in its sole <br />discretion. <br />Further supplement 1-06.1 by adding the following: <br />1-06.1(5) Requests for Substitution <br />(*****) <br />The City will not usually consider a substitution for material or Equipment specified <br />by brand name or manufacturer or sole-sourced. <br />Only the Contractor may offer materials or Equipment of equal or better quality and <br />performance as a substitution for those specified. The Contractor shall make <br />substitution offers in writing to the City’s Representative in accordance with 1-05.3(1) <br />SUBMITTALS of these Special Provisions. The substitution offer must include <br />sufficient data to enable the City’s Representative to assess the acceptability of the <br />material or Equipment for the particular application and requirements. The City and <br />City’s Representative are not required or obligated to consider or review a request <br />for substitution and may, in their sole discretion and option, consider or review such <br />requests. <br />If the offered substitution requires changes to or coordination with other portions of <br />the Work, include, if any, drawings, and details showing such changes. The <br />Contractor agrees to perform these changes as part of the substitution of material or <br />Equipment at no additional cost to the City. Approval of a substitution request will not <br />relieve the Contractor from responsibility for the efficiency, quality, and performance <br />of the substitute material or Equipment, in the same manner and degree as the <br />material and Equipment originally specified. Reflect cost differential associated with a <br />substitution in the offer. If the City approves the substitution, the Contract Documents <br />will be modified by a Change Order modifying the Contract Sum in the amount of the <br />cost differential. <br />1-06.2 Acceptance of Materials <br />1-06.2(2) Statistical Evaluation of Materials for Acceptance <br />1-06.2(2)B Financial Incentive <br />Delete 1-06.2(2)B <br />1-06.2(2)D Quality Level Analysis <br />Delete 1-06.2(2)D
The URL can be used to link to this page
Your browser does not support the video tag.