Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-44 <br />Œ Municipal Public Works Department <br />If the scope of Work in this Contract includes Work at the City of Everett Water Filtration <br />Plant or the Waste Water Pollution Control Facility, Contractor shall comply with the <br />requirements of the Washington Department of Labor & Industries for such work <br />including, but not limited to, Chapter 296-67 WAC. All costs associated or incurred in <br />complying with these regulations or any other regulations listed above are included in <br />the Contractor’s Proposal. <br />In cases of conflict between different safety regulations, the more stringent regulation <br />shall apply. <br />The Washington State Department of Labor and Industries shall be the sole and <br />paramount administrative agency responsible for the administration of the provisions of <br />the Washington Industrial Safety and Health Act of 1973 (WISHA). <br />The Contractor shall maintain at the project site office, or other well-known place at the <br />project site, all articles necessary for providing first aid to the injured. The Contractor <br />shall establish, publish, and make known to all employees, procedures for ensuring <br />immediate removal to a hospital, or doctor’s care, persons, including employees, who <br />may have been injured on the project site. Employees should not be permitted to work <br />on the project site before the Contractor has established and made known procedures <br />for removal of injured persons to a hospital or a doctor’s care. <br />The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of <br />the Contractor’s plant, appliances, and methods, and for any damage or injury resulting <br />from their failure, or improper maintenance, use, or operation. The Contractor shall be <br />solely and completely responsible for the conditions of the project site, including safety <br />for all persons and property in the performance of the Work. This requirement shall apply <br />continuously, and not be limited to normal working hours. The required or implied duty of <br />the Engineer to conduct construction review of the Contractor’s performance does not, <br />and shall not, be intended to include review and adequacy of the Contractor’s safety <br />measures in, on, or near the project site. <br />1-07.1(7) Noise <br />Work within 500 feet of residential properties between the hours of 10:00 p.m. and 7:00 <br />a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 a.m. on weekends <br />or holidays are subject to noise control requirements if the work generates decibel levels <br />of greater than 55 db(A). Contractor may apply for a Noise Variance a minimum of 30 <br />days prior to performing work and pay $100.00 application fee, using the following link to <br />obtain the latest information on noise variance requirements: <br />https://www.everettwa.gov/formcenter/human-resources-16/request-for-temporary- <br />construction-noise-167. The Contractor must not assume that a Noise Variance will be <br />granted. In no event will the Contractor be entitled to any adjustment of the Contract <br />Sum or Contract Time if a Noise Variance is denied. <br />Typical requirements include, and not limited to, broadband backup alarms on all <br />equipment requiring a backup alarm, anti-tail gate slamming devices, dump truck bed <br />liners, and sawcutting, vacuum excavation, pavement breaking and loading export haul <br />noise must be done between the hours of 7:00 a.m. and 10:00 p.m. during weekdays <br />and between 8:00 a.m. and 6:00 p.m. on weekends. <br />Appendix E contains the City of Everett’s Noise Ordinance for Bidder’s reference. <br />Approval to continue Work during these hours may be revoked at any time the <br />Contractor exceeds the City’s noise control regulations or complaints are received from