My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-43 <br />concrete returned to the supplier). Contractor shall provide report on DOT form 350- <br />075A Recycled Materials Reporting. <br />1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br />1-07.1 Laws to be Observed <br />1-07.1(1) General <br />Revise 1-07.1(1) by replacing the second sentence of the first paragraph with the <br />following: <br />The Contractor shall indemnify, defend, and save harmless the City (including its agents, <br />officers, and employees) against any claims that may arise because the Contractor (or <br />any employee of the Contractor or Subcontractor or material person) violated a legal <br />requirement. <br />1-07.1(2) Health and Safety <br />Supplement 1-07.1(2) by adding the following: <br />The Contractor shall be in compliance at all times with all COVID-19 Requirements <br />applicable to the Work.Contractor’s Bid includes all costs necessary for the duration <br />of the Work for compliance with Baseline COVID-19 Requirements.. <br />Supplement 1-07.1by adding the following: <br />1-07.1(6) Additional Requirements <br />The Contractor shall be in compliance with all applicable standards, orders, or <br />requirements issued under Section 306 of the Clean Air Act [42 U.S.C. 1857(h)], Section <br />508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and <br />Environmental Protection Agency Regulations (40 CFR Part 15). (Contracts, <br />subcontracts, and subgrants of amounts in excess of $100,000). <br />The Contractor shall comply with mandatory standards and policies relating to energy <br />efficiency that are contained in the state energy conservation plan issued in compliance <br />with the Energy Policy and Conservation Act (Pub. L. 94-163). <br />The City advises all general contractors and subcontractors that numerous Federal, <br />State, and Local regulations exist that could affect the procedures used in the <br />completion of this project. The City advises each prospective Contractor that they are <br />responsible to be aware of and comply with all applicable statutes and regulations. It is <br />recommended that each Contractor contact the local office of the following agencies for <br />a list of applicable regulations and requirements that might affect the implementation of <br />this project: <br /> Federal Environmental Protection Agency <br /> Washington Department of Health <br /> Washington Department of Ecology <br /> Washington Department of Fisheries <br /> Washington Department of Wildlife <br /> Washington Department of Labor & Industries <br /> Puget Sound Air Pollution Control Agency <br /> Municipal Building Department <br /> Municipal Planning Department
The URL can be used to link to this page
Your browser does not support the video tag.