Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-46 <br />Exception: The City will not add in sales tax for a payment the Contractor or a <br />Subcontractor makes on the purchase or rental of tools, machinery, equipment, or <br />consumable supplies not integrated into the project. Such sales taxes shall be <br />included in the unit bid item prices or in any other Contract amount. <br />1-07.2(3) Services <br />The Contractor shall not collect retail sales tax from the City on any contract wholly for <br />professional or other services (as defined in Washington State Department of Revenue <br />Rules 138 and 244). <br />1-07.3 Fire Prevention and Merchantable Timber Requirements <br />Delete 1-07.3 in its entirety. <br />1-07.5 Environmental Regulations <br />1-07.5(4) Air Quality <br />Delete all of 1-07.5(4) and substitute the following: <br />The Contractor shall comply with all rules of the Puget Sound Clean Air Agency <br />(PSCAA) (800-552-3565). These rules include PSCAA Regulation I. Excerpts of <br />Regulation I are included in the Appendix D as it relates to fugitive dust control. The <br />Contractor shall submit a dust control plan including dust control measures for its <br />activities related to this Contract that may cause dust. This plan shall be submitted to <br />the Engineer prior to commencing activity at the job site. <br />1-07.6 Permits and Licenses <br />Supplement 1-07.6 by adding the following: <br />A City of Everett business license is required for the Contractor and the Contractor’s <br />Subcontractors prior to commencing construction on this Contract. <br />Contractor shall obtain all necessary permits required by law and the City of Everett. All <br />general building, electrical, plumbing permits will be issued at no cost to the Contractor. <br />In addition, obtain all required permits for waste disposal sites. Waste disposal sites <br />shall be in the United States, unless otherwise expressly stated in the Contract <br />Documents or the City gives prior written approval. <br />This Project has more than one acre of total disturbed area within the project limits and <br />requires coverage under the Construction Stormwater General Permit (CSWGP). The <br />City will obtain coverage for the project in order to facilitate the project schedule. A copy <br />of the permit and coverage letter will be provided. The Contractor shall assume <br />responsibility for the requirements of the CSWGP by filing a Transfer of Coverage form <br />with Ecology, developing a Construction Stormwater Pollution Prevention Plan (SWPPP) <br />prior to beginning construction, and complying with the requirements of the permit. <br />Criteria and requirements for developing a SWPPP can be found in the Washington <br />State Department of Ecology 2019 Stormwater Management Manual for Western <br />Washington. A link to the Manual can be found on the City’s web site using the following <br />URL: <br />Stormwater Technical Resources | Everett, WA - Official Website <br />Contact Ecology to determine if other requirements apply to the Project. <br />NW Region DOE phone: 425-649-7000