My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-58 <br />1-07.18(5)H Builder’s Risk <br />If the Project includes construction of a structure, the Contractor shall procure and <br />maintain during the life of the Contract, or until acceptance of the project by the City, <br />whichever is longer, “All Risk” Builders Risk or Installation Floater Insurance at least <br />as broad as ISO form number CP0020 (Builders Risk Coverage Form) with ISO form <br />number CP0030 (Causes of Loss – Special Form) including coverage for collapse, <br />theft, off-site storage and property in transit. The coverage shall insure for direct <br />physical loss to property of the entire construction project, for 100% of the <br />replacement value thereof and include earthquake. The policy shall be endorsed to <br />cover the interests, as they may appear, of the City, Contractor and subcontractors <br />of all tiers with the City and sub-contractors listed as a Named Insured. In the event <br />of a loss to any or all of the work and/or materials therein and/or to be provided at <br />any time prior to the final close-out of the Contract and acceptance of the project by <br />the City, the Contractor shall promptly reconstruct, repair, replace or restore all work <br />and/or materials so destroyed. Nothing herein provided for shall in any way excuse <br />the Contractor or its surety from the obligation of furnishing all the required materials <br />and completing the work in full compliance with the terms of the Contract. <br />1-07.20 Patented Devices, Materials, and Processes <br />Delete the first paragraph of 1-07.20 and substitute the following: <br />The Contractor shall assume all costs arising from the use of patented devices, <br />materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br />defend, and save harmless the City, and its officers, employees and agents from all <br />actions of any nature for, or on account of the use of any patented devices, materials, or <br />processes. <br />1-07.23 Public Convenience and Safety <br />Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br />Nothing contained in this Contract is intended to create any third-party beneficiary rights <br />in favor of the public or any individual utilizing the facilities being constructed or <br />improved under this Contract. <br />1-07.23(1) Construction Under Traffic <br />Revise the third sentence of the second paragraph to read as follows: <br />Do NOT impair accessibility to existing or temporary pedestrian push buttons. City <br />may allow activating pedestrian recall timing or other accommodations during <br />construction. <br />Supplement 1-07.23(1) by adding the following: <br />If Engineer determines the permitted closure hours adversely affect traffic, the <br />Engineer may adjust the hours accordingly. The Engineer will notify the Contractor in <br />writing of any change in the closure hours. <br />No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 p.m. <br />on a day prior to a holiday or holiday weekend. A holiday weekend is defined as <br />having a holiday fall on Friday, Saturday, Sunday or Monday. <br />Contractor shall provide a uniformed off-duty Police Officer to control traffic in critical <br />situations as determined by the Engineer. The uniformed officer shall be paid under <br />contract item "Traffic Control – Off-Duty Police Officer.”
The URL can be used to link to this page
Your browser does not support the video tag.