My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-65 <br />withhold progress pay estimates if updated schedules are not timely submitted monthly. <br />These remedies are cumulative and not exclusive of other remedy. The City’s use of one <br />or more of these remedies does not constitute an election or prevent the City from <br />pursuing other remedies for this or other defaults. <br />No later than the pre-construction conference, Contractor shall submit a preliminary <br />schedule (“Preliminary Schedule”) for the entire Work to City’s Representative and City. <br />Contractor shall prepare such schedule in consultation with its Subcontractors. <br />1-08.3(2) Project Schedule Types <br />Delete 1-08.3(2), including its subsections, and substitute the following: <br />1-08.3(2) Project Schedule Requirements For Contracts Exceeding $500,000 <br />(*****) <br />1-08.3(2)A Scheduler <br />Contractor represents and warrants that it employs, or will engage prior to <br />preparation of the Preliminary Schedule, a qualified scheduler. A "qualified <br />scheduler" is a person who has at least five years of full time, construction project <br />scheduling experience, who is familiar, competent and professional in creating, <br />maintaining and updating time scaled and resource loaded critical path schedules. <br />Contractor shall submit to the City the name, address, and qualifications of the <br />qualified scheduler to the City for approval no later than the pre-construction <br />conference. <br />1-08.3(2)B Baseline Schedule <br />The progress schedule submitted to the City’s Representative and City after their <br />review of the Preliminary Schedule shall be the Baseline Schedule. The Baseline <br />Schedule shall be the baseline schedule against which all future schedules are <br />compared and updated, and job progress is measured. The Baseline Schedule shall <br />not be reset or changed without the written agreement of City’s Representative and <br />City. <br />1-08.3(2)C Updates <br />Contractor shall submit with each application for payment or progress pay estimate <br />an updated progress schedule, but no less often than monthly. If requested by City’s <br />Representative or the City, Contractor shall prepare and submit updated progress <br />schedules from time to time, which may be more frequent than monthly. <br />An updated progress schedule shall identify progress of the Project or Work to the <br />date of submission. It shall include, but not be limited to: (1) identification of all actual <br />start and completion dates occurring prior to the submission of the schedule; (2) <br />comparison of actual start and completion dates to the planned start and completion <br />dates shown on the Baseline Schedule; and (3) comparison of expected start and <br />completion dates for work to occur after submission updated progress schedule to <br />the planned start and completion dates shown on the Baseline Schedule. Work <br />remaining to be completed at the end of a period for an activity should show the <br />remaining duration required to complete that activity. The percent complete for that <br />activity should also be shown. If during the course of construction the Contractor <br />desires or feels it necessary to make changes in the schedule logic, these changes <br />should be identified, highlighted, and specifically and expressly brought to the <br />attention of the City’s Representative and City along with the schedule update.
The URL can be used to link to this page
Your browser does not support the video tag.