My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-83 <br />If Contractor disagrees with the adjustment of Contract Sum determined by the City’s <br />Representative, Contractor may submit a Contract Claim for the difference between the <br />amount determined by the City’s Representative and the amount sought by the <br />Contractor. <br />Contractor shall not be entitled to any anticipated profits on deleted, terminated, or <br />uncompleted Work. <br />1-09.6 Force Account <br />Supplement 1-09.6 by adding the following: <br />The City has estimated and included in the Proposal dollar amounts for all items to be <br />paid per Force Account. This is done only to provide a common Bid for Bidders. All such <br />dollar amounts are to become a part of Contractor's total bid. However, the City does not <br />warrant expressly or by implication that the actual amount of Work will correspond with <br />those estimates. Payment will be made on the basis of the amount of Work actually <br />authorized by Engineer. <br />1-09.7 Mobilization <br />Supplement 1-09.7 by adding the following: <br />1. Construction Identification Signs: Upon commencement of Work, the Contractor shall <br />furnish and erect two Project/Construction Identification Signs in accordance with <br />COE Standard Drawing No. 714, one at each end of each work area at Engineer <br />approved locations. <br />a. Contractor shall provide sign painting, lettering and detailing by a professional <br />sign maker with Engineer approval prior to placement on job site. <br />b. Contractor shall provide a Project Information Sign for each of the two <br />Project/Construction Identification Signs. Attach Project Information Sign to the <br />surface of the sign face in accordance with COE Standard Plan No. 714. The <br />Construction Identification Sign shall contain the following three lines of <br />information that the Engineer will provide: <br />PROJECT NAME: <br />PROJECT FUNDING: <br />PROJECT COST: <br />c. Contractor shall maintain signs and sign frames in a clearly legible condition <br />throughout the progress of the Work and shall completely remove signs upon <br />project completion. Deliver signs to the City's storage area for future City use. <br />d. No separate payment for Project/Construction Identification Signs will be made. <br />All costs associated with this item shall be merged with the unit contract price for <br />"Mobilization." <br />2. Engineer's Field Office: The Contractor shall provide an office for the use of the <br />Engineer that may be in conjunction or attached to the Contractor's field office. <br />Sanitary facilities shall be nearby. The location of the office shall be adjacent to the <br />project and at a location acceptable to the Contractor and the Engineer. The office <br />shall be equipped with a desk, layout table, chairs, file cabinet, and telephone and <br />suitable lighting, air conditioning and heating. A telephone shall be installed for the <br />sole use of the Engineer. It shall be a separate unit with a different telephone number <br />than the Contractor's phone. Mutually agreeable measures for the security of the <br />office shall be arranged between the Contractor and Engineer. The Engineer's office
The URL can be used to link to this page
Your browser does not support the video tag.