Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-103 <br />There shall be no separate classification of signs. All construction signs, whether used <br />throughout the construction, during a major phase of construction or removed daily shall <br />be paid under the item "Maintenance and Protection of Traffic Control.” Portable or <br />temporary mountings may require added weight for stability. If it is necessary to add <br />weight to the signs, only a bag of sand that will rupture on impact shall be used. The bag <br />of sand shall have a maximum weight of 40 pounds and shall be suspended no more <br />than 1-foot from the ground. <br />The Work to provide the construction signing shall be: <br />1. Furnishing all construction signs. <br />2. Furnishing, removing, and disposing of the posts or supports for the signs. <br />3. Initial installation and subsequent removal of all construction signs. <br />4. Furnishing labor and materials for maintaining the signs in a clean and <br />presentable condition; <br />5. All other incidentals necessary for providing the construction signs according to <br />the approved traffic control plan(s). <br />Signs, posts, or supports that are lost, stolen, destroyed, or which the Engineer deems <br />to be unacceptable, while their use is required on the project, shall be replaced by the <br />Contractor without additional compensation. <br />1-10.4 Measurement <br />Delete 1-10.4 and substitute the following: <br />1-10.4 Measurement <br />1-10.4(1) General <br />(*****) <br />When the Bid Proposal does not include an item for any necessary traffic control, all <br />costs for traffic control shall be included, by the Contractor, in the unit contract price for <br />the various other items of Work in the Bid Proposal. The Contractor shall estimate these <br />costs based on the contemplated work procedures. <br />When traffic control items are included in the Bid Proposal, payment is limited to the <br />following areas: <br />The entire project area under the Contract and for a distance to include the initial <br />warning signs for the beginning of the Project and the end of construction. Warning signs <br />for side roads on the approved traffic control plan are also included. If the project <br />consists of two or more sections, the limits will apply to each section individually. <br />A detour provided in the Plans or approved by the Engineer for by-passing all or any <br />portion of the construction, irrespective of whether or not the termini of the detour are <br />within the limits of the Contract. <br />The provisions of Section 1-04.6 will not apply to traffic control or traffic control items. <br />However, the item "Maintenance and Protection of Traffic Control" will be considered for <br />an equitable adjustment only when the total Contract price increases or decreases by <br />more than 25 percent. <br />The measurement and payment for the items included in the Bid Proposal for traffic <br />control costs incurred within the limits of 1 and 2 above will be made to the Contractor by <br />the City as described in these Special Provisions.