My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 2 <br />Everett Mall Bus Platform Earthwork December 2024 <br />WO No – MALLSTN/24462 SP-110 <br />a. For concrete rigid base, saw cut to a depth of 2/3 the thickness of the rigid <br />base. <br />b. For rigid base constructed with mortared decorative or special pavement <br />including, but not limited to, brick, cobblestone, or paver block, or a <br />combination of such materials saw cut to full depth of the rigid base along a <br />neat line with intent to salvage as many special pavement units as possible. <br />2-02.3(7) Salvage <br />(*****) <br />Carefully salvage and deliver to the Owner in good condition, all materials of recoverable <br />value taken from the discarded facilities, unless otherwise indicated. Materials and <br />things deemed of no value by the Engineer shall become the Contractor’s property to be <br />removed and properly disposed. <br />Remove excess concrete, debris and dirt from castings and other materials the Engineer <br />designates suitable for salvage and that are not to be re-used elsewhere on the Project. <br />Deliver salvage castings and materials to the location designated by the Engineer. <br />2-02.3(8) Waste Disposal <br />(*****) <br />Provide waste site for disposal of materials not required for construction. Arrange waste <br />disposal at no expense to the City. Waste disposal shall meet the requirements of 2- <br />03.3(7)C of the Standard Specifications. <br />2-02.3(9) Abandon Existing Water Valves In-place <br />(*****) <br />Prior to abandoning existing water valves in-place, coordinate with City to have City <br />forces close valve. After City forces verify valve is closed, remove valve box and <br />extension, if any, and backfill with Gravel Borrow as specified in 9-03.14(1). Compact <br />backfill to a minimum of 95 percent maximum density in accordance with 2-03.3(14)D. <br />2-02.4 Vacant <br />Revise 2-02.4 as follows: <br />2.02.4 Measurement <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section 1-09 <br />MEASUREMENT AND PAYMENT of the Standard Specifications. <br />For curb and gutter cement removal with concrete pavement, the curb and gutter will be <br />considered as pavement removal and the measurement for payment will be to the back of <br />the curb. <br />2-02.5 Payment <br />Delete all paragraphs in 2-02.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />If there is no bid item to cover pavement removals, then they shall be included with the <br />construction of the respective Work including, but not limited to, combined sewer pipe,
The URL can be used to link to this page
Your browser does not support the video tag.