CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 2 <br />Everett Mall Bus Platform Earthwork December 2024 <br />WO No – MALLSTN/24462 SP-110 <br />a. For concrete rigid base, saw cut to a depth of 2/3 the thickness of the rigid <br />base. <br />b. For rigid base constructed with mortared decorative or special pavement <br />including, but not limited to, brick, cobblestone, or paver block, or a <br />combination of such materials saw cut to full depth of the rigid base along a <br />neat line with intent to salvage as many special pavement units as possible. <br />2-02.3(7) Salvage <br />(*****) <br />Carefully salvage and deliver to the Owner in good condition, all materials of recoverable <br />value taken from the discarded facilities, unless otherwise indicated. Materials and <br />things deemed of no value by the Engineer shall become the Contractor’s property to be <br />removed and properly disposed. <br />Remove excess concrete, debris and dirt from castings and other materials the Engineer <br />designates suitable for salvage and that are not to be re-used elsewhere on the Project. <br />Deliver salvage castings and materials to the location designated by the Engineer. <br />2-02.3(8) Waste Disposal <br />(*****) <br />Provide waste site for disposal of materials not required for construction. Arrange waste <br />disposal at no expense to the City. Waste disposal shall meet the requirements of 2- <br />03.3(7)C of the Standard Specifications. <br />2-02.3(9) Abandon Existing Water Valves In-place <br />(*****) <br />Prior to abandoning existing water valves in-place, coordinate with City to have City <br />forces close valve. After City forces verify valve is closed, remove valve box and <br />extension, if any, and backfill with Gravel Borrow as specified in 9-03.14(1). Compact <br />backfill to a minimum of 95 percent maximum density in accordance with 2-03.3(14)D. <br />2-02.4 Vacant <br />Revise 2-02.4 as follows: <br />2.02.4 Measurement <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section 1-09 <br />MEASUREMENT AND PAYMENT of the Standard Specifications. <br />For curb and gutter cement removal with concrete pavement, the curb and gutter will be <br />considered as pavement removal and the measurement for payment will be to the back of <br />the curb. <br />2-02.5 Payment <br />Delete all paragraphs in 2-02.5 and substitute the following: <br />Payment for bid items of Work completed pursuant to the Contract Documents will be as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br />If there is no bid item to cover pavement removals, then they shall be included with the <br />construction of the respective Work including, but not limited to, combined sewer pipe,