My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 2 <br />Everett Mall Bus Platform Earthwork December 2024 <br />WO No – MALLSTN/24462 SP-111 <br />water main, water service line, manhole, side sewer pipe, storm drainpipe, catch basins, <br />and underground utility vaults. <br />Include curb and gutter and sidewalk removal with construction of the respective Work <br />including, but not limited to, combined sewer pipe, water main, water service line, <br />manhole, side sewer pipe, storm drainpipe, catch basins, and underground utility vaults <br />with no direct compensation made. <br />If there is no pay item for pipe abandonment, then it shall be included with the <br />construction of the respective Work including, but not limited to, sewer or storm <br />drainpipe, water main, manhole, catch basin or side sewer with no direct compensation <br />made. <br />If there is no pay item for existing valve abandonment, then it shall be included with the <br />construction of other items of Work with no direct compensation made. <br />2-03 ROADWAY EXCAVATION AND EMBANKMENT <br />2-03.1 Description <br />Supplement 2-03.1 by adding the following: <br />This Work applies to street pavement patching and street reconstruction after completion <br />of utility work. Grading for street reconstruction shall conform to COE Standard Drawing <br />No. 302, unless otherwise noted on the Plans. Grading for pavement patching shall <br />conform to COE Standard Drawing No. 326, unless otherwise noted on the Plans. <br />2-03.2 Vacant <br />Revise 2-03.2 as follows: <br />2.03.2 Materials <br />Materials shall meet the requirements of the following: <br />Foundation Material Class A or B 9-03.17 Standard Specifications <br />Gravel Borrow 9-03.14(1) Standard Specifications <br />2-03.3 Construction Requirements <br />Supplement 2-03.3 by adding the following: <br />Blasting is not allowed within the City limits of Everett. <br />Use suitable excavated material for roadway embankments. Dispose of surplus <br />excavated material or unsuitable material in accordance with 2-03.3(7). <br />Engineer will not approve payment for unauthorized excavation or embankment, or both, <br />beyond the limits indicated on the Plans. Return areas of unauthorized excavation or <br />embankment, or both, to their original conditions or better at the Contractor’s expense. <br />Fine grading in fill or backfill areas shall begin within the top six inches of subgrade. <br />Final grading shall produce a uniform surface within established tolerances and without <br />abrupt changes in grade. <br />Construction requirements for pavement patching authorized by Engineer outside of <br />Project limits shall be in accordance with Section 5-04 and City Standard Drawing No. <br />326 for existing asphalt concrete over prepared grade. <br />Provide temporary drainage to keep the subgrade free from standing water.
The URL can be used to link to this page
Your browser does not support the video tag.