My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 2 <br />Everett Mall Bus Platform Earthwork December 2024 <br />WO No – MALLSTN/24462 SP-115 <br />Place Foundation Material Class A or B in layers not more than six inches thick <br />and compact to minimum of 90-percent maximum density as determined by 2- <br />03.3(14)D. <br />Dispose of unsuitable material removed to make room for foundation material by <br />hauling to a waste site obtained and provided by the Contractor in accordance <br />with 2-03.3(7)C. <br />2-09.3(1)D Disposal of Excavated Material <br />Delete the second paragraph in 2-09.3(1)D and substitute the following: <br />All costs for disposing of excavated material, whether within the Project limits or <br />hauled to a disposal site, shall be incidental to the other Bid items in the <br />Proposal. The City will not pay for hauling. Disposal of excavated material shall <br />meet the requirements of 2-03.3(7)C. <br />2-09.3(1)E Backfilling <br />Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br />Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day <br />strength not to exceed 300-psi. Provide wet or flowable CDF with consistency <br />having approximate slump between three to ten inches. <br />Controlled Density Fill used for excavation backfill may be placed dry or wet. Use <br />wet, or flowable, CDF for filling abandoned pipes in-place. <br />Supplement 2-09.3(1)E by adding the following: <br />Where CDF is used in lieu of other materials such as foundation material, gravel <br />borrow, washed sand or crushed surfacing top course, the respective limits for <br />trench width or backfill dimensions shall be approved by the Inspector. <br />2-09.3(3)B Excavation Using Open Pits – Extra Excavation <br />Supplement 2-09.3(3)B, Submittals and Design Requirements, with the following: <br />The Contractor shall submit Type 3E Working Drawings with supporting <br />calculations showing the geometry and construction sequencing of the proposed <br />excavation slopes. <br />2-09.3(3)D Shoring and Cofferdams <br />Revise the fifth paragraph to read as follows: <br />Submittals and Design Requirements – The Contractor shall submit Type 3E <br />Working Drawings with supporting calculations showing the proposed methods <br />and construction details of structural shoring or cofferdams in accordance with <br />Sections 1-05.3 and 6-02.3(16). <br />2-09.4 Measurement <br />Delete all paragraphs in 2-09.4 and substitute the following: <br />Bid items of Work completed pursuant to the Contract Documents will be measured as <br />described in Division B – Bid Item Descriptions of these Special Provisions and Section <br />1-09 MEASUREMENT AND PAYMENT of the Standard Specifications.
The URL can be used to link to this page
Your browser does not support the video tag.