My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 5 <br />Everett Mall Bus Platform Surface Treatments and Pavements December 2024 <br />WO No – MALLSTN/24462 SP-120 <br />5-04.3(3) Equipment <br />5-04.3(3)A Mixing Plant <br />Provide plants used for the preparation of HMA conforming to the following <br />requirements: <br />1. Equipment for Preparation of Asphalt Binder – Equip tanks for the storage <br />of asphalt binder to heat and hold the material at the required temperatures. <br />Accomplish the heating by steam coils, electricity, or other approved means <br />so that no flame is in contact with the storage tank. Provide the circulating <br />system for the asphalt binder designed to ensure proper and continuous <br />circulation during the operating period. Provide a valve for the purpose of <br />sampling the asphalt binder placed in either the storage tank or in the supply <br />line to the mixer. <br />2. Thermometric Equipment – Provide an armored thermometer, capable of <br />detecting temperature ranges expected in the HMA mix, fixed in the asphalt <br />binder feed line at a location near the charging valve at the mixer unit and <br />location convenient and safe for access by Inspectors. Provide plant <br />equipped with an approved dial-scale thermometer, a mercury actuated <br />thermometer, an electric pyrometer, or another approved thermometric <br />instrument placed at the discharge chute of the drier to automatically register <br />or iQGLFDWHWKHWHPSHUDWXUHRIWKHKHDWHGDJJUHJDWHV3URYLGHௗGHYLFHLQIXOO <br />view of the plant operator. <br />3. Heating of Asphalt Binder – Provide heating so the temperature of the <br />asphalt binder does not exceed the maximum recommended by the asphalt <br />binder manufacturer nor be below the minimum temperature required to <br />maintain the asphalt binder in a homogeneous state. Provide method to heat <br />the asphalt binder in a manner that will avoid local variations in heating and <br />provide a continuous supply of asphalt binder to the mixer at a uniform <br />average temperature with no individual variations exceeding 25°F. Also, <br />when a WMA additive is included in the asphalt binder, the temperature of the <br />asphalt binder shall not exceed the maximum recommended by the <br />manufacturer of the WMA additive. <br />4. Sampling and Testing of Mineral Materials – Provide HMA plant equipped <br />with a mechanical sampler for the sampling of the mineral materials meeting <br />the requirements of Section 1-05.6 for the crushing and screening operation. <br />Provide for the setup and operation of the field testing facilities of the City as <br />provided for in Section 3-01.2(2). <br />5. Sampling HMA – Provide for sampling HMA by one of the following <br />methods: <br />a. A mechanical sampling device attached to the HMA plant. <br />b. Platforms or devices to enable sampling from the hauling vehicle without <br />entering the hauling vehicle. <br />5-04.3(3)B Hauling Equipment <br />Provide trucks used for hauling HMA having tight, clean, smooth metal beds and a <br />cover of canvas or other suitable material of sufficient size to protect the mixture from <br />adverse weather. Securely attach cover whenever the weather conditions during the <br />work shift include, or are forecast to include, precipitation or an air temperature less
The URL can be used to link to this page
Your browser does not support the video tag.