My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 5 <br />Everett Mall Bus Platform Surface Treatments and Pavements December 2024 <br />WO No – MALLSTN/24462 SP-121 <br />than 45°F or when time from loading to unloading exceeds 30 minutes to protect the <br />HMA. <br />Provide an environmentally benign means to prevent the HMA mixture from adhering <br />to the hauling equipment. Drain excess release agent prior to filling hauling <br />equipment with HMA. Do NOT use petroleum derivatives or other coating material <br />that contaminate or alter the characteristics of the HMA. For live bed trucks, the <br />conveyer shall be in operation during the process of applying the release agent. <br />5-04.3(3)C Pavers <br />Provide HMA pavers that are self-contained, power-SURSHOOHGXQLWVZLWKDQௗLQWHUQDOO\ <br />heated vibratory screed and shall be capable of spreading and finishing courses of <br />HMA plant mix material in lane widths required by the paving section shown <br />LQௗWKHௗ3ODQV. <br />Provide HMA paver in good condition and have the most current equipment available <br />from the manufacturer for the prevention of segregation of the HMA mixture installed <br />in good condition and in working order. Provide equipment certification listing the <br />make, model, and year of the paver and note retrofitting of any equipment. <br />Operate the screed in accordance with the manufacturer’s recommendations and so <br />it effectively produces a finished surface of the required evenness and texture <br />ZLWKRXWWHDULQJVKRYLQJVHJUHJDWLQJRUJRXJLQJWKHPL[WXUH3URYLGHDௗFRS\RIWKH <br />manufacturer’s recommendations upon City’s request. Extensions producing the <br />same results, including ride, density, and surface texture as obtained by the primary <br />screed will be allowed. Do NOT use extensions without augers and an internally <br />heated vibratory screeGLQWKH7UDYHOHGௗ:D\ <br />When specified in the Contract, reference lines for vertical control will be required. <br />Place lines on both outer edges of the Traveled Way of each Roadway. Horizontal <br />control utilizing the reference line will be permitted. Control the grade and slope for <br />intermediate lanes automatically from reference lines or by means of a mat <br />referencing device and a slope control device. When the finish of the grade <br />prepared for paving is superior to the established tolerances and when, in the <br />opinion of the Engineer, further improvement to the line, grade, cross-section, and <br />smoothness can best be achieved without the use of the reference line, a mat <br />referencing device may be substituted for the reference line. Substitution of the <br />device will be subject to the continued approval of the Engineer. A joint matcher may <br />be used subject to the approval of the Engineer. The reference line may be removed <br />after the completion of the first course of HMA when approved by the Engineer. <br />Whenever the Engineer determines that any of these methods are failing to provide <br />the necessary vertical control, the reference lines will be reinstalled by the <br />Contractor. <br />Furnish and install all pins, brackets, tensioning devices, wire, and accessories <br />necessary for satisfactory operation of the automatic control equipment. <br />If the paving machine in use is not providing the required finish, the Engineer may <br />suspend Work as allowed by Section 1-08.6. Thoroughly remove any cleaning or <br />solvent type liquids spilled on the pavement before paving proceeds. <br />5-04.3(3)D Material Transfer Device or Material Transfer Vehicle <br />Provide a Material Transfer Device/Vehicle (MTD/V) with the Engineer’s approval, <br />unless otherwise required by the Contract.
The URL can be used to link to this page
Your browser does not support the video tag.