My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT – BID ITEM DESCRIPTIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform BID ITEM DESCRIPTIONS December 2024 <br />WO No – MALLSTN/24462 B-4 <br />Provisions and as shown on the Plans. The unit price per lineal foot for the final sawcutting <br />of concrete curb, gutter and sidewalk includes, but is not limited to, the sawcutting <br />necessary for the final joint between existing concrete sidewalk or curb and permanent <br />concrete repair. <br />Include cost of cleanup by vacuum collection and disposal of the cutting’s slurry with this <br />bid item as there will be no separate payment for cleanup. <br />Bid Item 13 - Removing Cement Concrete Extruded Curb <br />Measurement and Payment: Linear Foot (LF) <br />The measurement and payment for the Removing Cement Concrete Extruded Curb shall <br />be for the removal of and disposal of existing Cement Concrete Extruded Curb per linear <br />foot in accordance with Specification 2-02 of the Standard Specifications. <br />Bid Item 14 - Removing Asphalt Concrete Pavement <br />Measurement and Payment: Square Yard (SY) <br />The measurement and payment for the Removing Asphalt Concrete Pavement shall be for <br />the removal of and disposal of existing Asphalt Concrete Pavement with a thickness of up <br />to six inches per Square Yard in accordance with Specification 2-02 of the Standard <br />Specifications. <br />Bid Item 15 - Roadway Excavation Incl. Haul <br />Measurement and Payment: Cubic Yard (CY) <br />The measurement and payment for Roadway Excavation Incl. Haul shall be for removing <br />excavated materials, hauling off site and disposing of per cubic yard in accordance with <br />Specification 2-03 of the Standard Specifications. <br />Bid Item 16 - Gravel Borrow <br />Measurement and Payment: (TON) <br />Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br />accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of <br />dimensions defined in the Work, descriptions for other bid items, shown on the Plans, or <br />COE Standard Drawings, or as otherwise approved by the Engineer. <br />Measurement for gravel borrow shall be limited to maximum trench widths defined in the <br />work descriptions for other bid items. <br />The unit price per ton, based on certified weight tickets, for gravel borrow shall be full <br />compensation for all labor, material, tools and equipment necessary to furnish imported <br />gravel borrow for trench backfill where Engineer has determined native soils are not <br />suitable for backfill, and other Work as required, from a Contractor-supplied source in <br />accordance with 2-03.3(14)J of the Standard Specifications and these Special Provisions. <br />The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, <br />placing, grading and compacting the material in place. <br />The unit price for this bid item includes all costs for removing, loading and disposing of <br />displaced unsuitable material, including haul.
The URL can be used to link to this page
Your browser does not support the video tag.