My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT – BID ITEM DESCRIPTIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform BID ITEM DESCRIPTIONS December 2024 <br />WO No – MALLSTN/24462 B-5 <br />Bid Item 17 - Site Grading <br />Measurement and Payment: Lump Sum (LS) <br />No specific unit of measurement will be made for Site Grading, which consists of rough <br />grading, smoothing and compacting the limits of the site to receive specified roadway, <br />sidewalk and bus platform building materials. <br />Bid Item 18 - Crushed Surfacing Base Course <br />Measurement and Payment: TON <br />Measurement for Crushed Surfacing Base Course will be by the ton as recorded on <br />certified weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to <br />dimensions defined in the Work, descriptions for other bid items, shown on the Plans, <br />details or COE Standard Drawings or as otherwise approved by the Engineer. In addition to <br />surfacing, this product will be paid by the ton for sewer and storm pipe bedding. Crushed <br />Surfacing Base Course material placed exceeding “neatline” quantities without advance <br />authorization by the Inspector will not be paid for. <br />The unit price per ton shall be full compensation for all labor, compaction, material, tools, <br />and equipment necessary to furnish, haul, stockpile, place, grade, and compact imported <br />crushed surfacing base course for the Work as required, from a Contractor-supplied source <br />in accordance with the Standard Specifications and these Special Provisions. <br />The unit price for crushed surfacing base course also includes all costs for controlling <br />moisture content and all costs for dewatering. <br />Also included in this bid item shall be the cost of all equipment required to remove existing <br />soils to attain proper elevations, compaction of native subgrade soils, as well as to <br />uniformly spread and compact the crushed surfacing material. The unit price for this bid <br />item includes all costs for removing, loading and disposing of displaced unsuitable material, <br />including haul. <br />Included in this bid item the cost of sprinkling during dry periods prior to placement of the <br />crushed surfacing and while spreading and compacting the material. <br />Payment for crushed surfacing base course will be by the ton of material placed and <br />approved by the Inspector. <br />Bid Item 19 - Crushed Surfacing Top Course <br />Measurement and Payment: TON <br />Measurement for Crushed Surfacing Top Course will be by the ton as recorded on certified <br />weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT and limited to <br />dimensions defined in the Work, descriptions for other bid items, shown on the Plans, <br />details or COE Standard Drawings or as otherwise approved by the Engineer. Crushed <br />Surfacing Top Course material placed exceeding “neatline” quantities without advance <br />authorization by the Inspector will not be paid for. <br />The unit price per ton shall be full compensation for all labor, compaction, material, tools, <br />and equipment necessary to furnish, haul, stockpile, place, grade, and compact imported <br />crushed surfacing top course for the Work as required, from a Contractor supplied source in <br />accordance with the Standard Specifications and these Special Provisions. <br />The unit price for Crushed Surfacing Top Course also includes all costs for controlling <br />moisture content.
The URL can be used to link to this page
Your browser does not support the video tag.