My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT – BID ITEM DESCRIPTIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform BID ITEM DESCRIPTIONS December 2024 <br />WO No – MALLSTN/24462 B-7 <br />the building fully functional and ready for occupancy in accordance with the plan set and <br />contract specifications. <br />Bid Item 25 - Corporation Stop w/ Service Saddle, ¾-inch <br />Measurement and Payment: Each (EA) <br />The unit contract price for Corporation Stop w/ Service Saddle, ¾-inch shall be full <br />compensation for supplying and installing Corporation Stop w/ Service Saddle, ¾ inch. <br />Bid Item 26 - Assist COE in Connecting to Existing Water Main <br />Measurement and Payment: Each (EA) <br />The unit contract price to Assist COE in Connecting to Existing Water Main shall constitute <br />full compensation for all labor, materials, tools and equipment necessary for connection to <br />the existing system, in accordance with 7-09.3(19)A including, yet not limited to; all costs <br />for traffic control, excavation, shoring, dewatering, haul and disposal of excavated <br />materials, furnishing, installing and compacting bedding and backfill materials; labor and <br />equipment required for the complete installation of the connection as specified. <br />Unit contract price shall include all coordination efforts with the City and assistance as City <br />forces make the actual connection. Connection of a water service line to the water main <br />and connection of new water service line to existing water service line will not be <br />considered a connection to the existing system. <br />Bid Item 27 - Double Check Valve Assembly ¾-inch. <br />Measurement and Payment: Each (EA) <br />The unit contract price for Double Check Valve Assembly ¾-inch will be full compensation <br />for supplying and installing Double Check Valve Assembly ¾-inch and connecting per the <br />City standard detail, Plans and specifications. <br />Bid Item 28 - Water Service Connection, ¾-inch <br />Measurement and Payment: Each (EA) <br />The unit contract price for Water Service Connection, ¾-inch, shall constitute full <br />compensation for all labor, materials, tools and equipment necessary to connect new <br />¾-inch PE service lines off new 2-inch PE and reconnecting with the existing service line in <br />accordance with Detail 4, Drawing D1. Work includes, yet not limited to, tee, trench <br />excavation, backfill and compaction; street pavement, concrete curb, concrete curb and <br />gutter, concrete driveway and concrete sidewalk removal; clearing and grubbing; testing; <br />lawn restoration including seeding or sodding; dewatering; and removal or abandonment of <br />existing service connection. <br />Bid Item 29 - Side Sewer – 4-inch Diam. PVC <br />Measurement and Payment: Linear Foot (LF) <br />The unit price per linear foot Side Sewer – 4-inch Diam. PVC shall be full compensation for <br />all labor, material, tools and equipment necessary to satisfactorily complete the work as <br />defined in Section 7-17 and 7-18 of these Special Provisions and as shown on the Plans. <br />Included in this bid item is locating the existing sewer, the side sewer as shown on the <br />Contract Plans, connection to the main pipe and proposed building, fittings per COE <br />Standard Drawings. Included in this bid item is the work to locate side sewers near the <br />property line, including depth of utility, prior to installing tees at the main.
The URL can be used to link to this page
Your browser does not support the video tag.