Laserfiche WebLink
CITY OF EVERETT – BID ITEM DESCRIPTIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform BID ITEM DESCRIPTIONS December 2024 <br />WO No – MALLSTN/24462 B-7 <br />the building fully functional and ready for occupancy in accordance with the plan set and <br />contract specifications. <br />Bid Item 25 - Corporation Stop w/ Service Saddle, ¾-inch <br />Measurement and Payment: Each (EA) <br />The unit contract price for Corporation Stop w/ Service Saddle, ¾-inch shall be full <br />compensation for supplying and installing Corporation Stop w/ Service Saddle, ¾ inch. <br />Bid Item 26 - Assist COE in Connecting to Existing Water Main <br />Measurement and Payment: Each (EA) <br />The unit contract price to Assist COE in Connecting to Existing Water Main shall constitute <br />full compensation for all labor, materials, tools and equipment necessary for connection to <br />the existing system, in accordance with 7-09.3(19)A including, yet not limited to; all costs <br />for traffic control, excavation, shoring, dewatering, haul and disposal of excavated <br />materials, furnishing, installing and compacting bedding and backfill materials; labor and <br />equipment required for the complete installation of the connection as specified. <br />Unit contract price shall include all coordination efforts with the City and assistance as City <br />forces make the actual connection. Connection of a water service line to the water main <br />and connection of new water service line to existing water service line will not be <br />considered a connection to the existing system. <br />Bid Item 27 - Double Check Valve Assembly ¾-inch. <br />Measurement and Payment: Each (EA) <br />The unit contract price for Double Check Valve Assembly ¾-inch will be full compensation <br />for supplying and installing Double Check Valve Assembly ¾-inch and connecting per the <br />City standard detail, Plans and specifications. <br />Bid Item 28 - Water Service Connection, ¾-inch <br />Measurement and Payment: Each (EA) <br />The unit contract price for Water Service Connection, ¾-inch, shall constitute full <br />compensation for all labor, materials, tools and equipment necessary to connect new <br />¾-inch PE service lines off new 2-inch PE and reconnecting with the existing service line in <br />accordance with Detail 4, Drawing D1. Work includes, yet not limited to, tee, trench <br />excavation, backfill and compaction; street pavement, concrete curb, concrete curb and <br />gutter, concrete driveway and concrete sidewalk removal; clearing and grubbing; testing; <br />lawn restoration including seeding or sodding; dewatering; and removal or abandonment of <br />existing service connection. <br />Bid Item 29 - Side Sewer – 4-inch Diam. PVC <br />Measurement and Payment: Linear Foot (LF) <br />The unit price per linear foot Side Sewer – 4-inch Diam. PVC shall be full compensation for <br />all labor, material, tools and equipment necessary to satisfactorily complete the work as <br />defined in Section 7-17 and 7-18 of these Special Provisions and as shown on the Plans. <br />Included in this bid item is locating the existing sewer, the side sewer as shown on the <br />Contract Plans, connection to the main pipe and proposed building, fittings per COE <br />Standard Drawings. Included in this bid item is the work to locate side sewers near the <br />property line, including depth of utility, prior to installing tees at the main.