Laserfiche WebLink
CITY OF EVERETT – BID ITEM DESCRIPTIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform BID ITEM DESCRIPTIONS December 2024 <br />WO No – MALLSTN/24462 B-6 <br />Also included in this bid item shall be the cost of all equipment required to remove existing <br />soils to attain proper elevations, compaction of native subgrade soils, as well as to <br />uniformly spread and compact the crushed surfacing material. <br />The unit price for this bid item includes all costs for removing, loading and disposing of <br />displaced unsuitable material, including haul. <br />Included in this bid item is the cost of sprinkling during dry periods prior to placement of the <br />crushed surfacing and while spreading and compacting the material. <br />Payment for crushed surfacing top course will be by the ton of material placed and <br />approved by the Inspector. <br />Bid Item 20 - HMA CL. ½ inch PG 58H-22 <br />Measurement and Payment: TON <br />The measurement and payment for HMA CL. ½ inch PG 58H-22 will be by the ton. HMA <br />place and compacted to Plans specified depth per Section 5-04 of the Standard <br />Specifications. <br />Bid Item 21 - HMA CL. ½ inch PG 64H-22 for Pavement Repair <br />Measurement and Payment: TON <br />The measurement and payment for HMA CL. ½ inch PG 64H-22 for Pavement Repair will <br />be by the ton. HMA place and compacted in trench repair areas to Plans specified depth <br />per Section 5-04 of the Standard Specifications. <br />Bid Item 22 - Cement Concrete Pavement (12-inch Thick) <br />Measurement and Payment: Square Yard (SY) <br />The measurement and payment for Cement Concrete Pavement (12-inches Thick) shall be <br />measured by the finished square yard for providing, placing, finishing and curing Cement <br />Concrete Pavement per the Plans, details and Sections 5-05 of the Standard <br />Specifications. This work also includes procuring and placing dowel bars, rebar and dowel <br />bar baskets and any necessary form work including stripping of forms. <br />Bid Item 23 - Transit Shelter <br />Measurement and Payment: Each (EA) <br />The measurement and payment for Transit Shelter shall be for procuring, transporting, <br />pouring six inch concrete foundation pad as notes in the Plans and assembling and <br />installing Transit Shelter per each per technical specifications. <br />Bid Item 24 - Restroom Building Complete <br />Measurement and Payment: Lump Sum (LS) <br />There will be no specific unit of measurement for constructing a fully functional Restroom <br />Building Complete. The contractor will receive a lump sum payment for constructing a <br />complete and fully functioning Restroom Building which includes foundation, utility <br />connections, building, roofing, interior and exterior finishes, two fully furnished restrooms, <br />furnished breakroom, heating, air conditioning, interior and exterior light fixtures, hardware <br />and locks, utility room with separately secured security/computer rack system, electrical, <br />plumbing, ventilations, flooring and other necessary components and furnishings to make