My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT – BID ITEM DESCRIPTIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform BID ITEM DESCRIPTIONS December 2024 <br />WO No – MALLSTN/24462 B-12 <br />Bid Item 46 - Cement Concrete Seat Wall <br />Measurement and Payment: Linear Foot (LF) <br />The unit contract price per linear foot Cement Concrete Seat Wall will be made for <br />supplying cement concrete, rebar, forming, constructing, providing textured finish Cement <br />Concrete Seat Wall in accordance with the Plans and Contract Specifications. <br />Bid Item 47 - Cement Concrete Sidewalk – 4-inch Thickness <br />Measurement and Payment: Square Yard (SY) <br />The measurements and payment for Cement Concrete Sidewalk – 4-inch Thickness shall <br />be measured by the square yard of finished cement concrete sidewalk and fully <br />compensated for forming, supplying cement concrete, finishing, adding joints and joint filler <br />and stripping forms in accordance Plans, COE Standard Drawings, Standard Specifications <br />and these Special Provisions. Refer to Section 8-14 of Contract Specifications. For sections <br />of the bus platform that require additional thickness of cement concrete, that additional <br />thickness cost will be compensated under their respect bid items such as bid items Bike <br />Rack and Transit Shelter. <br />Bid Item 48 - Cement Concrete Curb & Gutter, Type A-1 <br />Measurement and Payment: Linear Foot (LF) <br />The unit contract price per linear foot for Cement Concrete Curb & Gutter, Type A-1 shall be <br />full compensation for all materials, tools, labor and equipment necessary to complete the <br />Work in accordance with the Plans, COE Standard Drawings, Standard Specifications and <br />these Special Provisions, including forming, supplying cement concrete, finishing and <br />stripping forms. <br />Bid Item 49 - Cement Concrete Pedestrian Curb <br />Measurement and Payment: Linear Foot (LF) <br />The unit contract price per linear foot for Cement Concrete Pedestrian Curb shall be full <br />compensation for all materials, tools, labor and equipment necessary to complete the Work <br />in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br />Special Provisions, including forming, supplying cement concrete, finishing and stripping <br />forms. <br />Bid Item 50 - Cement Concrete Curb, Type E-1 <br />Measurement and Payment: Linear Foot (LF) <br />The unit contract price per linear foot for Cement Concrete Curb, Type E-1 shall be full <br />compensation for all materials, tools, labor and equipment necessary to complete the Work <br />in accordance with the Plans, COE Standard Drawings, Standard Specifications and these <br />Special Provisions, including forming, supplying cement concrete, finishing and stripping <br />forms. <br />Bid Item 51 - Integral Cement Concrete Curb <br />Measurement and Payment: Linear Foot (LF) <br />The unit contract price per linear foot for Integral Cement Concrete Curb shall be full <br />compensation for all materials, tools, labor and equipment necessary to complete the Work <br />in accordance with the Plans, COE Standard Drawings, Standard Specifications and these
The URL can be used to link to this page
Your browser does not support the video tag.