Laserfiche WebLink
CITY OF EVERETT – BID ITEM DESCRIPTIONS <br /> <br /> <br /> <br /> <br />Everett Mall Bus Platform BID ITEM DESCRIPTIONS December 2024 <br />WO No – MALLSTN/24462 B-13 <br />Special Provisions, including reinforcement rebar, epoxy, forming, supplying cement <br />concrete, finishing and stripping forms. <br />Bid Item 52 - Cement Concrete Curb Ramp <br />Measurement and Payment: Each (EA) <br />The unit contract price per each for Cement Concrete Curb Ramp shall be full <br />compensation for all materials, tools, labor and equipment necessary to complete the Work <br />in accordance with the Plans, WSDOT Standard Plans, Standard Specifications, and these <br />Special Provisions, including sawcutting, removal, loading, hauling and disposal, and <br />including Detectable Warning Surface. <br />Bid Item 53 - Permanent Signing <br />Measurement and Payment: Lump Sum (LS) <br />The unit contract price per lump sum will be full pay for supplying signs, posts, and <br />constructing foundations for all project related project signing identified in the plan set. This <br />also includes installing signs per COE and WSDOT standard plans and providing sign post <br />sleeves and other necessary hardware. <br />Bid Item 54 - Detectable Truncated Dome Warning Strip <br />Measurement and Payment: Square Foot (SF) <br />The unit contract price per square foot for Detectable Truncated Dome Warning Strip shall <br />be full compensation for all materials, tools, labor and equipment necessary to complete <br />the Work in accordance with the Plans, COE Standard Drawings, Standard Specifications <br />and these Special Provisions, This pay items is intended for the placement of Detectable <br />Truncated Dome Warning Strips at the five bus bays along the bus platform. Detectable <br />Truncated Dome Warning Strips are incidental when placed at ADA curb ramp locations. <br />Bid Item 55 - Transit Bay Flag Posts & Foundation <br />Measurement and Payment: Each (EA) <br />The unit contract price per each for Transit Bay Flag Posts and Foundation shall be full <br />compensation for all materials, tools, labor and equipment necessary to complete the Work <br />in accordance with the Plans, WSDOT and COE Standard Drawings, Standard <br />Specifications and these Special Provisions, including constructing a cement concrete <br />foundation and supplying and installing steel post and connection sleeve. <br />Bid Item 56 - Transit Shelter Bench <br />Measurement and Payment: Each (EA) <br />The unit contract price per each for Transit Shelter Bench shall be full compensation for all <br />materials, tools, labor and equipment necessary to complete the Work in accordance with <br />the Plans, Standard Specifications and these Special Provisions, including supplying, <br />assembling, and installing transit shelter bench and misc. parts. <br />Bid Item 57 - Kiosk Foundation & Installation <br />Measurement and Payment: Lump Sum (LS) <br />The unit contract price will be lump sum, and no measurement of payment will be made for <br />supplying cement concrete, rebar, forming and constructing Kiosk Foundation & Installation <br />in accordance with the Plans and Contract Specifications. This work also includes conduit