My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-14 <br />1-02.15 Pre-Award Information <br />Revise 1-02.15 to read as follows: <br />Before awarding any contract, the City may require one or more of these items or <br />actions of the apparent lowest responsible Bidder: <br />1. A complete statement of the origin, composition, and manufacture of any or all <br />materials to be used, <br />2. Samples of these materials for quality and fitness tests, <br />3. A progress schedule, in a form the City requires, showing the order of and time <br />required for the various phases of the Work, <br />4. A breakdown of costs assigned to any bid item, <br />5. Attendance at a conference with the Engineer or representatives of the Engineer, <br />6. Obtain, and furnish a copy of, a business license to do business in the City of <br />Everett. <br />7. A copy of State of Washington Contractor’s Registration, or <br />8. Any other information or action taken that is deemed necessary to ensure that <br />the Bidder is the lowest responsible bidder. <br />1-03 AWARD AND EXECUTION OF CONTRACT <br />1-03.1 Consideration of Bids <br />Revise the first paragraph to read: <br />After opening and reading Proposals, the City will check them for correctness of <br />extensions of the prices per unit and the total price. If a discrepancy exists between the <br />price per unit and the extended amount of any bid item, the price per unit will control. If a <br />minimum bid amount has been established for any item and the Bidder’s unit or lump <br />sum price is less than the minimum specified amount, the City will unilaterally revise the <br />unit or lump sum price to the minimum specified amount and recalculate the extension. <br />The total of extensions, corrected where necessary, including sales taxes where <br />applicable and such additives and/or alternates as selected by the City, will be used by <br />the City for Award purposes and to fix the awarded Contract Sum and the amount of the <br />Contract Bond(s). <br />Revise the third and fourth paragraphs of 1-03.1 to read as follows: <br />Within 5 days after the opening of Proposals (or such longer time as the City may grant <br />in writing), a Bidder who wishes to claim error shall submit a notarized affidavit signed by <br />the Bidder, accompanied by original work sheets used in the preparation of the <br />Proposal, requesting relief from the responsibilities of Award. <br />The affidavit shall describe the specific error(s) and certify that the work sheets are the <br />originals used in the preparation of the Proposal. The Engineer will review the certified <br />work sheets to determine the validity of the claimed error and make recommendation to <br />the City. If the City concurs in the claim of error, the Bidder will be relieved of <br />responsibility, and the bid deposit of the Bidder will be returned. Thereafter, at the <br />discretion of the City, all Bids may be rejected or Award made to next lowest and <br />responsive Bidder.
The URL can be used to link to this page
Your browser does not support the video tag.