My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-20 <br />immediately in writing that Contractor disagrees with the Change Order and does not <br />intend to be bound by its terms. <br />The Contractor waives and is estopped from denying its agreement with any unilateral <br />Change Order for which the Contractor does not immediately give Notice to the City as <br />provided in 1-04.5 NOTICE BY CONTRACTOR in these Special Provisions and <br />submitting a Contract Claim as provided in 1-09.11(2) CONTRACT CLAIMS in these <br />Special Provisions. A unilateral Change Order that is not timely protested as provided in <br />this section shall be full payment and final settlement of all asserted and unasserted <br />Contract Claims for Contract Time and all costs of any kind, including costs of Delays, <br />inefficiencies and impacts, related to, arising out of, or resulting from, any Work <br />described in the Change Order. <br />The Contractor shall obtain written consent of the Surety or Sureties if the City’s <br />Representative requests such consent. <br />1-04.4(4) Value Engineering and Cost Sharing <br />(*****) <br />The Contractor may submit proposals for changing the Plans, Specifications, or other <br />requirements of the Contract Documents and the City, in its sole discretion, may accept <br />or reject such proposals. If accepted by the City and if the proposal decreases the direct, <br />actual costs of constructing the Work, the Contract Sum shall be reduced by fifty percent <br />(50%) of the direct, actual construction cost saved. Because the City has the sole <br />discretion whether to consider, accept or reject the Contractor’s proposal and the <br />Contractor has no right to require the City to consider or accept such proposals, the <br />City’s decision is not reviewable by any court. This subsection applies only to change <br />proposals initiated solely by the Contractor, or its Subcontractors and suppliers, and <br />does not apply to change proposals requested or initiated by the City or the City’s <br />Representative. The City is not obligated or required to consider any Contractor initiated <br />change proposals and may, in its sole discretion, refuse to do so. Under no <br />circumstances shall the Contractor be entitled to additional compensation arising out of, <br />or related to, the City’s refusal to consider or approve a Contractor initiated change <br />proposal. The Contractor shall do none of the following without the express written <br />agreement of the City: fail to perform any Work; commence Work on proposed change; <br />reduce its resources assigned to performance of the Work in order to prepare a change <br />proposal or in anticipation of approval of a change proposal; adjust or change the project <br />schedule or take action or fail to take action that would affect the Completion Date of the <br />Work; take action or fail to take action arising out of the Contractor’s change proposal <br />that would result in the Contractor seeking an adjustment upward of the Contract Sum. <br />1-04.5 Procedure, Protest, and Dispute by the Contractor <br />Delete all of 1-04.5 and substitute the following: <br />1-04.5 Notice by Contractor <br />(*****) <br />1-04.5(1) When Notice Must Be Given <br />Whenever: <br />1. The Contractor disagrees with any requirement, direction, interpretation or <br />determination by the City or City’s Representative;
The URL can be used to link to this page
Your browser does not support the video tag.