CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-19 <br />1-04.4 Changes <br />1-04.4(1) City’s Right to Direct Changes to the Work <br />(*****) <br />The City reserves the right to change the Work at any time. Such changes shall not <br />invalidate the Contract nor release the Surety, and the Contractor agrees to perform the <br />Work as changed. Among others, these changes and alterations may include: <br />1. Deleting or omitting any part of the Work, Equipment or material to be provided <br />under this Contract, <br />2. Increasing or decreasing quantities, <br />3. Altering Specifications, designs, or both, <br />4. Altering the way the Work is to be done, <br />5. Adding new Work or Extra Work, <br />6. Altering facilities, Equipment, materials, services, or sites, provided by the City, <br />and <br />7. Ordering the Contractor to accelerate or Delay the Work. <br />If the Contractor and City do not agree upon scope of Work changed or adjustment to <br />the Contract Sum and Contract Time, the City may, at its sole option, unilaterally direct <br />the Contractor to implement City directed change by notice. The City shall not pay or be <br />responsible or liable for changes implemented by the Contractor without explicit notice <br />from the City to proceed. <br />1-04.4(2) Extra Work <br />(*****) <br />At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, <br />(3) direct the Contractor to perform the Extra Work at existing unit Bid price, (4) direct <br />the Contractor to perform the Extra Work at a mutually agreed upon price, or (5) direct <br />the Contractor to perform the Extra Work on a Force Account basis. <br />1-04.4(3) Change Orders <br />(*****) <br />Changes to the Work may result in an increase or decrease in Contract Sum, as <br />provided in 1-09.4 Equitable Adjustment. Requests for an increase in Contract Time <br />shall be made as provided in 1-08.3 PROGRESS SCHEDULE as applicable. Substantial <br />changes in Contract Time, Contract Sum or Work will often be negotiated and agreed <br />between the Contractor and City before the City directs the Contractor to proceed with <br />the change. <br />If the Contractor and City agree on the scope of Work and any changes to Contract Sum <br />and Contract Time, the Contractor and City shall execute an agreed Change Order. <br />However, if the Contractor and City do not agree, the City may, in its sole discretion, <br />issue a unilateral Change Order in the form attached to the Contract Documents <br />changing the scope of Work and making any adjustments to the Contract Sum pursuant <br />to 1-09.4 EQUITABLE ADJUSTMENT and Contract Time pursuant to 1-08.8 <br />EXTENSIONS OF TIME in such amount and for such time as the City believes <br />appropriate. Contractor agrees to use the agreed Change Order form attached to the <br />Contract Documents. The Contractor accepts all requirements, terms and conditions of a <br />Change Order by: signing it; writing a separate acceptance; or by failing to notify the City