My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colacurcio Brothers, Inc. 2/26/2025
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Colacurcio Brothers, Inc. 2/26/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2025 4:09:29 PM
Creation date
3/12/2025 3:44:09 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Colacurcio Brothers, Inc.
Approval Date
2/26/2025
Council Approval Date
3/12/2025
End Date
9/9/2025
Department
Transit
Department Project Manager
Brad Chenoweth
Subject / Project Title
Everett Mall Bus Platform
Tracking Number
0004733
Total Compensation
$1,992,715.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> <br /> <br /> <br /> <br /> Division 1 <br />Everett Mall Bus Platform General Requirements December 2024 <br />WO No – MALLSTN/24462 SP-26 <br />To detail and illustrate the Work, the City’s Representative may furnish to the Contractor <br />additional drawings and explanations consistent with the original Plans. The Contractor shall <br />perform the Work according to these additional drawings and explanations. <br />The City’s Representative may appoint assistants and inspectors to assist in determining <br />that the Work and materials meet the Contract requirements. Assistants and inspectors have <br />the authority to reject defective material and suspend Work that is being done improperly, <br />subject to the final decisions of the City’s Representative or, when appropriate, the City. <br />Assistants and inspectors are not authorized to accept Work, to accept materials, to issue <br />instructions, or to give advice that is contrary to the Contract. Work done or material <br />furnished that does not meet the Contract requirements shall be at the Contractor’s risk and <br />shall not be a basis for a Contract Claim even if the inspectors or assistants purport to <br />change the Contract. <br />Assistants and inspectors may advise the Contractor of any faulty work or materials or <br />infringements of the terms of the Contract; however, failure of the City’s Representative or <br />the assistants or inspectors to advise the Contractor does not constitute acceptance or <br />approval. <br />1-05.3 Working Drawings <br />Revise the second paragraph to read as follows: <br />1. Type 1 – Submitted for City information. Submittal must be received by the City a <br />minimum of 7 working days before Work represented by the submittal begins. <br />2. Type 2 – Submitted for City review and comment. Unless otherwise stated in the <br />Contract, the Engineer will require up to 15 working days from the date the Working <br />Drawing is received until it is returned to the Contractor. The Contractor shall not <br />proceed with the Work represented by the Working Drawing until comments from the <br />Engineer have been addressed. <br />3. Type 2E – Same as a Type 2 Working Drawing with Engineering as described <br />below. <br />4. Type 3 – Submitted for City review and approval. Unless otherwise stated in the <br />Contract, the Engineer will require up to 20 working days from the date the Working <br />Drawing is received until it is returned to the Contractor. The Contractor shall obtain <br />the Engineer’s written approval before proceeding with the Work represented by the <br />Working Drawing. <br />5. Type 3E – Same as a Type 3 Working Drawing with Engineering as described <br />below. <br />Supplement 1-05.3 as follows: <br />The Contract Documents include Plans that show such details as are reasonably <br />necessary to give a comprehensive understanding of the Work. The Contractor shall <br />submit alterations affecting the requirements and information in the Plans in writing to <br />the Engineer for approval prior to performing such Work. <br />The Engineer may supplement the Plans with additional drawings and explanations, <br />consistent with the purpose and intent of the original Plans, to detail and illustrate the <br />Work. The Contractor shall perform the Work according to these supplemental drawings <br />and explanations. <br />In addition to supplemental drawings furnished by the Engineer, the Contract Documents <br />may also be supplemented by Type 1, Type 2 or 2E, and Type 3 or 3E Working
The URL can be used to link to this page
Your browser does not support the video tag.