Laserfiche WebLink
25. Details for the construction of the new walls should be included. The details should specify connections <br /> for the top and bottom framing plates to the existing structure. See IRC Sections R106.1.1 and R301.1. <br /> 26. The proposed design may include modifications to the existing wall bracing that do not comply with the <br /> requirement of IRC Section R602.10. The drawings should be revised. See IRC Section R106.1.3. <br /> 27. A general fastener schedule should be provided per IRC Table R602.3(1). Providing a reference to this <br /> table in the drawings does not satisfy this requirement. In addition, the make and model of proprietary <br /> hardware should be specified where used for connections. <br /> 28. The construction drawings should specify coating cuts, notches, and holes in preservative-treated wood <br /> with a treatment complying with AWPA M4. See Section R317.1.1. <br /> 29. Framing and foundation plans, and details,for the construction of the new ramp should be included in the <br /> construction drawings. The details should include construction of the guards and landing. See IRC Section <br /> R507. <br /> Review of your project will be performed in the order received once the required documentation has been <br /> submitted. Please let me know if you have questions. <br /> - Drew Martin, P.E.,S.E. <br /> Associate Engineer—Commercial Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT Phone Hours: M/W/T: 8 am - 12 pm & 1 pm—3 pm;Tu: 1:00pm-3:00pm <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> 4 <br />