My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5117 27TH AVE W 2025-05-29
>
Address Records
>
27TH AVE W
>
5117
>
5117 27TH AVE W 2025-05-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 3:00:26 PM
Creation date
3/13/2025 2:28:32 PM
Metadata
Fields
Template:
Address Document
Street Name
27TH AVE W
Street Number
5117
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 of 29 <br /> Thursday, September 30, 2021it F- , 1 <br /> SCOPE OF WORi , `O""°A"°" ,o <br /> 0,1 <br /> Crew will install 11 3" Helical Piles, 3 3"Stable-Loc piles, as well as 10 Composite pads and lift home to maximum practical <br /> recovery. Crew will drive piles to a maximum 25'after there will be a$20 a foot charge per pile. Sales tax is subject to change at <br /> end of project. Crew will be drilling helical piles 1-2 along the East foundation wall of home. Homeowner will need to have <br /> landscaping removed in area's where helical piles will be installed. Crew will also be exposing and placing carbon fiber strapping <br /> along cracks in foundation. Crew will be drilling helical piles#3-11 along the North foundation wall of home. Landscaping will <br /> need to removed along areas where piles will be installed along the North wall as well. Crew will be installing the rest of helical <br /> piles 3-11 along the north wall of foundation, crew will lay plastic out to cover all excavated soils. Crew will also lay plywood down <br /> to walk dingo across grass. <br /> L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and that a <br /> maximum pile spacing of 7'-0"o.c.is achieved. Piles to be installed in accordance with SSK-01, SSK-02,&SSK-03. <br /> NOTES: <br /> 1. It is acceptable to install piles at the spacing shown with±0'-6"tolerance to allow for unexpected obstructions encountered during <br /> pile installation provided that no two adjacent spans exceed the spacing limitation of 6'-0"o.c. <br /> 2. End piles are to be placed as close to corners as possible and shall not exceed a maximum corner distance specified below. <br /> • <br /> 4 LOCATE PILE <br /> WITHIN 1'-0" MAX <br /> Garage I OF CORNER <br /> rack 1 g, <br /> i ::_ : ,O:8 <br /> - 0,8 <br /> -ttlf -1 I/q -I Ir8 -7, _"2 u i'- .1 8 lit; <br /> t__ 1 Chimney Foundation /1 <br /> ussr i <br /> /1c[ <br /> Crnc <br /> (2) PILES @ 34 .i 1'8 -.A rj 8 <br /> ®-3:3 —__-lib _=_ — __ -1:2 -1:_ <br /> 2 �1`;r <br /> 7'-0"O.C. MAX 3 LOCATE PILE WITHIN " <br /> Crack CF C•Cr=3"Helical Pilo <br /> 2 v8 21/, 23/8 -21 F 1'-0" MAX OF CORNER '3"Slabil Luc Pile <br /> LOCATE PILE - <br /> 4, 4.,. 1,2 -2 C.F -1 5/8 1:2 n ®-Composite Putt <br /> WITHIN 3'-0" MAX 3 (4)�'ILES� @ e 7 8 9 110 <br /> OF CORNER ''7'-0"O.C. MAXI ( if' <br /> (5) PILES @ 7'-0"O.C. MAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.