Laserfiche WebLink
11 of 29 <br /> c <br /> Thursday, September 30, 2021 : r-- <br /> JOB PHOT FOUNL1A710N SPECIAUST <br /> to ti <br /> _ '. <br /> i <br /> I� t 5 <br /> a <br /> yj t 1P <br /> « # " ., A, <br /> y 'k .1t <br /> Crew will be drilling helical piles 1-2 along the East Crew will be drilling helical piles#3-11 along the North <br /> foundation wall of home. Homeowner will need to foundation wall of home. Landscaping will need to <br /> have landscaping removed in area's where helical removed along areas where piles will be installed along <br /> piles will be installed. Crew will also be exposing and the North wall as well. <br /> placing carbon fiber strapping along cracks in <br /> foundation. <br /> -. <br /> ate_ P',- <br /> r <br /> • <br /> 11 , ; <br /> rM,. <br /> Crew will be installing the rest of helical piles 3-11 Crew will be installing stable-loc plies 1-3 from interior <br /> along the north wall of foundation, crew will lay of crawlspace along the South foundation wall of home <br /> plastic out to cover all excavated soils. Crew will also at front entry way, crew will be removing and replacing <br /> lay plywood down to walk dingo across grass. existing posts and pads to place 10 20" composite pads <br /> with a adjustable 4x4 brackets in designated area's. <br /> Photographs provided by R&R. Note that analysis assumptions such as building geometry, tributary <br /> areas, and loading were determined through examination of these photographs and industry <br /> knowledge of standard construction practices. <br /> -L120 <br />