My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2520 MADISON ST DISH WIRELESS 2025-08-08
>
Address Records
>
MADISON ST
>
2520
>
DISH WIRELESS
>
2520 MADISON ST DISH WIRELESS 2025-08-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2025 2:10:48 PM
Creation date
3/14/2025 1:52:09 PM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
2520
Tenant Name
DISH WIRELESS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mount Desktop — Post Modification Inspection (PMI) Report Requirements <br /> Documents & Photos Required from Contractor New Mount Passing MA <br /> Purpose—to provide TES the proper documentation in order to complete the required Mount Desktop <br /> review of the Post Modification Inspection Report. <br /> • Contractor is responsible for making certain the photos provided as noted below provide <br /> confirmation that the modification was completed in accordance with the modification <br /> drawings. <br /> • Contractor shall relay any data that can impact the performance of the mount, this includes <br /> safety issues. <br /> Base Requirements: <br /> • Any special photos outside of the standard requirements will be indicated on the passing MA <br /> • Verification that loading is as communicated in the Mount Analysis. NOTE If loading is different <br /> than what is conveyed in the modification drawing contact TES immediately. <br /> • Verification that the New Mount Installed is as specified in the MA <br /> • Each photo should be time and date stamped <br /> • Photos should be high resolution and submitted in a Zip File and should be organized in the file <br /> structure as depicted in Schedule A attached. <br /> • Contractor shall ensure that the safety climb wire rope is supported and not adversely impacted <br /> by the install of the modification components. This may involve the install of wire rope guides, <br /> or other items to protect the wire rope. <br /> • The photos in the file structure should be uploaded to https://pmi.vzwsmart.com as depicted <br /> on the drawings <br /> Photo Requirements: <br /> • Base and "During Installation Photos" <br /> o Base pictures include <br /> • Photo of Gate Signs showing the tower owner, site name, and number <br /> • Photo of carrier shelter showing the carrier site name and number if available <br /> • Photos of the galvanizing compound and/or paint used (if applicable), clearly <br /> showing the label and name <br /> o "During Installation Photos if provided - must be placed only in this folder <br /> • Photos taken at ground level <br /> o Overall tower structure before and after installation of the modifications <br /> o Photos of the appropriate mount before and after installation of the new mount; <br /> • Photos taken at Mount Elevation <br /> o Photos showing each individual sector before and also after installation of equipment. <br /> • These photos should also certify that the placement and geometry of the <br /> equipment on the mount is as depicted on the sketch and table in the mount <br /> analysis <br /> o Photos showing the newly installed mount that is as specified in the Mount Analysis <br /> o Photos showing the safety climb wire rope above and below the mount prior to <br /> modification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.