Laserfiche WebLink
Mount Desktop — Post Modification Inspection (PMI) Report Requirements <br /> Documents & Photos Required from Contractor New Mount Passing MA <br /> Purpose—to provide TES the proper documentation in order to complete the required Mount Desktop <br /> review of the Post Modification Inspection Report. <br /> • Contractor is responsible for making certain the photos provided as noted below provide <br /> confirmation that the modification was completed in accordance with the modification <br /> drawings. <br /> • Contractor shall relay any data that can impact the performance of the mount, this includes <br /> safety issues. <br /> Base Requirements: <br /> • Any special photos outside of the standard requirements will be indicated on the passing MA <br /> • Verification that loading is as communicated in the Mount Analysis. NOTE If loading is different <br /> than what is conveyed in the modification drawing contact TES immediately. <br /> • Verification that the New Mount Installed is as specified in the MA <br /> • Each photo should be time and date stamped <br /> • Photos should be high resolution and submitted in a Zip File and should be organized in the file <br /> structure as depicted in Schedule A attached. <br /> • Contractor shall ensure that the safety climb wire rope is supported and not adversely impacted <br /> by the install of the modification components. This may involve the install of wire rope guides, <br /> or other items to protect the wire rope. <br /> • The photos in the file structure should be uploaded to https://pmi.vzwsmart.com as depicted <br /> on the drawings <br /> Photo Requirements: <br /> • Base and "During Installation Photos" <br /> o Base pictures include <br /> • Photo of Gate Signs showing the tower owner, site name, and number <br /> • Photo of carrier shelter showing the carrier site name and number if available <br /> • Photos of the galvanizing compound and/or paint used (if applicable), clearly <br /> showing the label and name <br /> o "During Installation Photos if provided - must be placed only in this folder <br /> • Photos taken at ground level <br /> o Overall tower structure before and after installation of the modifications <br /> o Photos of the appropriate mount before and after installation of the new mount; <br /> • Photos taken at Mount Elevation <br /> o Photos showing each individual sector before and also after installation of equipment. <br /> • These photos should also certify that the placement and geometry of the <br /> equipment on the mount is as depicted on the sketch and table in the mount <br /> analysis <br /> o Photos showing the newly installed mount that is as specified in the Mount Analysis <br /> o Photos showing the safety climb wire rope above and below the mount prior to <br /> modification. <br />