Laserfiche WebLink
o Photos showing the climbing facility and safety climb if present. <br /> o Photos showing the climbing facility and safety climb if present. <br /> Antenna & equipment placement and Geometry Confirmation: <br /> • The contractor must certify that the antenna& equipment placement and geometry is in <br /> accordance with the antenna placement diagrams as included in this mount analysis. <br /> ❑ The contractor certifies that the photos support and the equipment on the mount is as depicted on <br /> the antenna placement diagrams as included in this mount analysis. <br /> ❑ The contractor notes that the equipment on the mount is not in accordance with the antenna <br /> placement diagrams and has accordingly marked up the diagrams or provided a diagram <br /> outlining the differences. <br /> Certifying Individual: Company <br /> Name <br /> Signature <br /> New Mount Certification: <br /> • The contractor must certify that the New Mount installed is as specified <br /> ❑ The contractor certifies that the New Mount installed is as specified in the Passing Mount <br /> Analysis <br /> ❑ The contractor notes that the New Mount installed is not as specified and engineering approval <br /> was received for the New Mount Installed <br /> ❑ The contractor did not install the New Mount specified in the Passing Mount Analysis <br /> Certifying Individual: Company <br /> Name <br /> Signature <br />