Laserfiche WebLink
2 of 8 <br /> LONGITUDE <br /> ONE TWENTY° <br /> ENGINEERING&DESIGN <br /> 1. Crack developed after lift at pile#9 (directly under the crawlspace vent opening): <br /> • Please provide a minimum 8'-0" C6x8.2 channel to be centered on pile #9 below the <br /> crawlspace vent opening. C-channel to be anchored to existing concrete footing w/ 5/8" <br /> Titen HD screw anchors with minimum 4" embed into the concrete. Anchors shall be <br /> installed @ 12" o.c. with 6" or less from each end of steel member. (Channel may be <br /> installed at interior or exterior of foundation wall). In addition, please provide carbon fiber <br /> stitching with high strength anchoring epoxy to be applied perpendicular to the cracks @ <br /> 8" o.c. for full length of crack. Please ensure minimum 12" development past crack is <br /> achieved for each strip. <br /> A <br /> b if <br /> • <br />