THESE OUTLINE SPECIFICATIONS IN CONJUNCTION WITH THE SPRINT STANDARD CONSTRUCTION SPECIFICATIONS, INCLUDING CONTRACT DOCUMENTS AND THE CONSTRUCTION DRAWINGS
<br /> DESCRIBE THE WORK TO BE PERFORMED BY THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR MEETING THE REQUIREMENTS OF SPRINT'S "STANDARD CONSTRUCTION ` z
<br /> SPECIFICATIONS FOR WIRELESS SITES" IN REGARDS TO ALL WORK COMPLETED. print
<br /> 0
<br /> REMOTE ELECTRICAL TILT (RET) CABLES: OVER8LANDPRINT PARKPKSKWAY 66251 w
<br /> SECTION 01 100 - SCOPE OF WORK ALTER NATES:SECTI ON 01 400 - SUBMITTALS & TESTS 0
<br /> MISCELLANEOUS: 0
<br /> THE WORK: AT THE COMPANY'S REQUEST, ANY ALTERNATIVES TO THE MATERIALS OR METHODS INSTALL SPUTTERS, COMBINERS, FILTERS PER RE DATA SHEET, FURNISHED BY
<br /> SHALL COMPLY WITH APPLICABLE NATIONAL CODES AND STANDARDS, LATEST EDITION, SPECIFIED SHALL BE SUBMITTED TO SPRINTS CONSTRUCTION MANAGER FOR SPRINT. z
<br /> AND PORTIONS THEREOF. APPROVAL. SPRINT WILL REVIEW AND APPROVE ONLY THOSE REQUESTS MADE IN L w
<br /> WRITING. NO VERBAL APPROVALS WILL BE CONSIDERED, ~
<br /> PRECEDENCE: ANTENNA INSTALLATION:
<br /> THE CONTRACTOR SHALL ASSEMBLE ALL ANTENNAS ONSITE IN ACCORDANCE WITH
<br /> SHOULD CONFLICTS OCCUR BETWEEN THE STANDARD CONSTRUCTION SPECIFICATIONS W I R E L E S S
<br /> THE INSTRUCTIONS SUPPLIED BY THE MANUFACTURER. ANTENNA HEIGHT, AZIMUTH, V7
<br /> FOR WIRELESS SITES INCLUDING THE STANDARD CONSTRUCTION DETAILS FOR TESTS AND INSPECTIONS: AND FEED ORIENTATION INFORMATION SHALL BE A DESIGNATED ON THE 540 W. MADISON ST. m
<br /> WIRELESS SITES AND THE CONSTRUCTION DRAWINGS, INFORMATION ON THE SUITE 1600
<br /> CONSTRUCTION DRAWINGS SHALL TAKE PRECEDENCE.
<br /> CHICAGO IL 60661
<br /> CONSTRUCTION DRAWINGS. , Of
<br /> A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION TESTS, x
<br /> SITE FAMILIARITY: INSPECTIONS AND PROJECT DOCUMENTATION. A. THE CONTRACTOR SHALL POSITION THE ANTENNA ON TOWER PIPE MOUNTS SO FULLEI�TON W
<br /> CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH ALL THAT THE BOTTOM STRUT IS LEVEL. THE PIPE MOUNTS SHALL BE PLUMB TO =
<br /> CONTRACT DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS PRIOR TO PROCEEDING B. CONTRACTOR SHALL ACCOMPLISH TESTING INCLUDING BUT NOT LIMITED TO THE WITHIN
<br /> WITH CONSTRUCTION. FOLLOWING: 1 DEGREE.
<br /> 9600 W.BRYN MAWR AVE.,SUITE 200 0
<br /> B. ANTENNA MOUNTING REQUIREMENTS: PROVIDE ANTENNA MOUNTING HARDWARE ROSEMONT,ILLINOIS 60018 =
<br /> ON-SITE SUPERVISION: 1. COAX SWEEPS AND FIBER TESTS PER THE CURRENT VERSION OF SPRINT AS INDICATED ON THE DRAWINGS. TEL:847-292-0200 -
<br /> THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK AND SHALL BE TS-0200 ANTENNA LINE ACCEPTANCE STANDARDS. FAX:847-292-0206
<br /> RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND COA#3151
<br /> PROCEDURES IN ACCORDANCE WITH THE CONTRACT DOCUMENTS. 2. AGL, AZIMUTH AND DOWNTILT PROVIDE AN AUTOMATED REPORT UPLOADED TO HYBRID CABLE INSTALLATION: www.FullerconEngineering.com �
<br /> SITERRA USING A COMMERCIAL MADE-FOR THE PURPOSE ELECTRONIC A. THE CONTRACTOR SHALL ROUTE, TEST, AND INSTALL ALL CABLES AS INDICATED
<br /> DRAWINGS. SPECIFICATIONS AND DETAILS REQUIRED AT JOBSITE: ANTENNA ALIGNMENT TOOL (AAT). INSTALLED AZIMUTH, CENTERLINE AND ON THE CONSTRUCTION DRAWINGS AND IN ACCORDANCE WITH THE DESCRIPTION DATE BY REV m
<br /> �
<br /> THE CONSTRUCTION CONTRACTOR SHALL MAINTAIN A FULL SET OF THE DOWNTILT MUST CONFORM WITH RF CONFIGURATION DATA MANUFACTURER'S RECOMMENDATIONS. 90% REVIEW 7/17/15 BE A
<br /> 15 AS06 0
<br /> CONSTRUCTION DRAWINGS AT THE JOBSITE FROM MOBILIZATION THROUGH FINAL 8/ /
<br /> CONSTRUCTION COMPLETION. 3. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL CORRECTIONS TO B. THE INSTALLED RADIUS OF THE CABLES SHALL NOT BE LESS THAN THE
<br /> ANY WORK IDENTIFIED AS UNACCEPTABLE IN SITE INSPECTION ACTIVITIES MANUFACTURER'S SPECIFICATIONS FOR BENDING RADII.
<br /> A. DETAILS ARE INTENDED TO SHOW DESIGN INTENT. PROVIDE ALL MATERIALS AND AND/OR AS A RESULT OF TESTING. o
<br /> LABOR AS REQUIRED TO PROVIDE A COMPLETE AND FUNCTIONING SYSTEM. C. EXTREME CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE CABLES DURING
<br /> MODIFICATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR CONDITIONS, AND 4, ALL TESTING REQUIRED BY APPLICABLE INSTALLATION MOPS. HANDLING AND INSTALLATION.
<br /> SUCH MODIFICATIONS SHALL BE INCLUDED AS PART OF THE WORK. a
<br /> C. REQUIRED CLOSEOUT DOCUMENTATION INCLUDES, BUT IS NOT LIMITED TO THE 1. FASTENING MAIN HYBRID CABLES: ALL CABLES SHALL BE INSTALLED INSIDE MONOPOLE WITH CABLE z
<br /> B. CONTRACTOR SHALL NOTIFY SPRINT CONSTRUCTION MANAGER OF ANY VARIATIONS FOLLOWING; SUPPORT GRIPS AS REQUIRED BY THE MANUFACTURER.
<br /> PRIOR TO PROCEEDING WITH THE WORK.DIMENSIONS SHOWN ARE TO FINISH UT
<br /> SURFACES UNLESS NOTED OTHERWISE. MODIFICATIONS MAY BE REQUIRED TO SUIT 1. AZIMUTH, DOWNTILT, AGL FROM SUNSIGHT INSTRUMENTS - ANTENNALIGN 2. FASTENING INDIVIDUAL FIBER AND DC CABLES ABOVE BREAKOUT ENCLOSURE (MEDUSA), WITHIN o
<br /> JOB DIMENSIONS OR CONDITIONS, AND SUCH MODIFICATIONS SHALL BE INCLUDED ALIGNMENT TOOL (AAT) THE MMBS CABINET AND ANY INTERMEDIATE DISTRIBUTION BOXES:
<br /> AS PART OF THE WORK. A
<br /> w
<br /> 2. SWEEP AND FIBER TESTS a. FIBER: SUPPORT FIBER BUNDLES USING M" VELCRO STRAPS OF THE REQUIRED LENGTH ® 18" H �.
<br /> C. MARK THE FIELD SET OF DRAWINGS IN RED, DOCUMENTING ANY CHANGES FROM OC. STRAPS SHALL BE UV, OIL AND WATER RESISTANT AND SUITABLE FOR INDUSTRIAL r` o
<br /> THE CONSTRUCTION DOCUMENTS. 3. SCALABLE BARCODE PHOTOGRAPHS OF TOWER TOP AND INACCESSIBLE INSTALLATIONS AS MANUFACTURED BY TEXTOL OR APPROVED EQUAL. 1• �1
<br /> SERIALIZED EQUIPMENT
<br /> b. DC: SUPPORT DC BUNDLES WITH ZIP TIES OF THE ADEQUATE LENGTH. ZIP TIES TO BE UV
<br /> METHODS OF PROCEDURE (MOPS) FOR CONSTRUCTION: 4. ALL AVAILABLE JURISDICTIONAL PERMIT AND OCCUPANCY INFORMATION STABILIZED, BLACK NYLON, WITH TENSILE STRENGTH AT 12,000 PSI AS MANUFACTURED BY
<br /> CONTRACTOR SHALL PERFORM WORK AS DESCRIBED IN NELCO PRODUCTS OR EQUAL. m
<br /> 5. PDF SCAN OF REDLINES PRODUCED IN FIELD
<br /> A. COAX COLOR CODING SWEEPS AND FIBER TESTING TS-0200 AND EL-0568 3. FASTENING JUMPERS: SECURE JUMPERS TO THE SIDE ARMS OR HEAD FRAMES USING STAINLESS �irp 52527 o
<br /> 6. A PDF SCAN OF REDLINE MARK-UPS SUITABLE FOR USE IN ELECTRONIC STEEL TIE WRAPS OR STAINLESS STEEL BUTTERFLY CLIPS. O� �FCIST � }
<br /> B. CABLE LABELING EN-2012-00 AS-BUILT DRAWING PRODUCTION Y
<br /> 4. CABLE INSTALLATION: SS�ONALEN�` <
<br /> C. APPLICABLE INSTALLATION MOPS IDENTIFIED ELSEWHERE IN THE CONTRACT 7. LIEN WAIVERS
<br /> DOCUMENTS a. INSPECT CABLE PRIOR TO USE FOR SHIPPING DAMAGE, NOTIFY THE CONSTRUCTION MANAGER. Q
<br /> 8. FINAL PAYMENT APPLICATION I
<br /> D. SPRINT GROUNDING SPECIFICATION NE-312-201 b. CABLE ROUTING: CABLE INSTALLATION SHALL BE PLANNED TO ENSURE THAT THE LINES WILL SITE NAME z
<br /> 9. REQUIRED FINAL CONSTRUCTION PHOTOS BE PROPERLY ROUTED IN THE CABLE ENVELOP AS INDICATED ON THE DRAWINGS. AVOID
<br /> E. SPRINT INTEGRATED CONSTRUCTION STANDARDS VERSION 4.0 TWISTING AND CROSSOVERS. cn
<br /> 10. CONSTRUCTION AND COMMISSIONING CHECKLIST COMPLETE WITH NO DEFICIENT EVERETT o
<br /> SECTION 01 200 - COMPANY FURNISHED MATERIAL AND ITEMS c. HOIST CABLE USING PROPER HOISTING GRIPS. DO NOT EXCEED MANUFACTURES RECOMMENDED
<br /> EQUIPMENT MAXIMUM BEND RADIUS. BAKERVIEW APTS
<br /> 11. APPLICABLE POST NTP TASKS INCLUDING DOCUMENT UPLOADS COMPLETED IN w
<br /> SITERRA (SPRINTS DOCUMENT REPOSITORY OF RECORD). 5. GROUNDING OF TRANSMISSION LINES: ALL TRANSMISSION LINES SHALL BE GROUNDED AS INDICATED m
<br /> COMPANY FURNISHED MATERIAL AND EQUIPMENT IS IDENTIFIED ON THE RF DATA ON DRAWINGS. SI E NJMLER 0
<br /> SHEET IN THE CONSTRUCTION DRAWINGS. 12. CLOSEOUT PHOTOGRAPHS AND CLOSEOUT CHECKLIST: SPRINT WILL PROVIDE 6. HYBRID CABLE COLOR CODING: ALL COLOR CODING SHALL BE AS REQUIRED IN THE CURRENT SE82XCO80
<br /> m
<br /> SEPARATE GUIDANCE VERSION OF SPRINT TS-0200. o
<br /> CONTRACTOR IS RESPONSIBLE FOR SPRINT PROVIDED MATERIAL AND EQUIPMENT TO AUGMENT I D. v7
<br /> ENSURE IT IS PROTECTED AND HANDLED PROPERLY THROUGHOUT THE CONSTRUCTION SECTION 11 700 - ANTENNA ASSEMBLY, REMOTE 7. HYBRID CABLE LABELING: INDIVIDUAL HYBRID AND DC BUNDLES SHALL BE LABELED w
<br /> DURATION. RADIO UNITS AND CABLE INSTALLATION ALPHA-NUMERICALLY ACCORDING TO SPRINT CELL SITE ENGINEERING NOTICE - EN 2012-001, WA-SN0208E14.1
<br /> SUMMARY: REV 1 a,
<br /> CONTRACTOR RESPONSIBLE FOR RECEIPT OF SPRINT FURNISHED EQUIPMENT AT CELL WEATHERPROOFING EXTERIOR CONNECTORS AND HYBRID CABLE GROUND KITS: SITE ADDRESS Q
<br /> SITE OR CONTRACTORS LOCATION. CONTRACTOR COMPLETE SHIPPING AND THIS SECTION SPECIFIES INSTALLATION OF ANTENNAS, RRU'S, AND CABLE A. ALL FIBER & COAX CONNECTORS AND GROUND KITS SHALL BE
<br /> RECEIPT DOCUMENTATION IN ACCORDANCE WITH COMPANY PRACTICE. EQUIPMENT, INSTALLATION, AND TESTING OF COAXIAL FIBER CABLE. WEATHERPROOFED, Q
<br /> SECTION 01 300 - CELL SITE CONSTRUCTION 2605 15TH ST Q
<br /> ANTENNAS AND RRU'S: B. WEATHERPROOFED USING ONE OF THE FOLLOWING METHODS. ALL EVERETT, WA 98201
<br /> THE NUMBER AND TYPE OF ANTENNAS AND RRU'S TO BE INSTALLED IS DETAILED INSTALLATIONS MUST BE DONE IN ACCORDANCE WITH THE MANUFACTURER'S w
<br /> NOTICE TO PROCEED: ON THE CONSTRUCTION DRAWINGS. RECOMMENDATIONS AND INDUSTRY BEST PRACTICES.
<br /> NO WORK SHALL COMMENCE PRIOR TO COMPANY'S WRITTEN NOTICE TO PROCEED SI I:FT NAM: z
<br /> AND THE ISSUANCE OF WORK ORDER. HYBRID CABLE: 1. COLD SHRINK: ENCOMPASS CONNECTOR IN COLD SHRINK TUBING AND PROVIDE A DOUBLE WRAP o
<br /> HYBRID CABLE WILL BE DC/FIBER AND FURNISHED FOR INSTALLATION AT EACH OF 2" ELECTRICAL TAPE EXTENDING 2" BEYOND TUBING. PROVIDE 3M COLD SHRINK CXS SERIES SPRINT
<br /> SITE CLEANLINESS: SITE. CABLE SHALL BE INSTALLED PER THE CONSTRUCTION DRAWINGS AND THE OR EQUAL. W
<br /> CONTRACTOR SHALL KEEP THE SITE FREE FROM ACCUMULATING WASTE MATERIAL, APPLICABLE MANUFACTURER'S REQUIREMENTS. SPECIFICATIONS Q
<br /> DEBRIS, AND TRASH. AT THE COMPLETION OF THE WORK, CONTRACTOR SHALL 2. SELF-AMALGAMATING TAPE: CLEAN SURFACES. APPLY A DOUBLE WRAP OF SELF-AMALGAMATING
<br /> REMOVE FROM THE SITE ALL REMAINING RUBBISH, IMPLEMENTS, TEMPORARY JUMPERS AND CONNECTORS: TAPE 2" BEYOND CONNECTOR. APPLY A SECOND WRAP OF SELF-AMALGAMATING TAPE IN OPPOSITE z
<br /> FACILITIES, AND SURPLUS MATERIALS. FURNISH AND INSTALL 1/2" COAX JUMPER CABLES BETWEEN THE RRU'S AND DIRECTION. APPLY DOUBLE WRAP OF 2" WIDE ELECTRICAL TAPE EXTENDING 2" BEYOND THE SI I:FT NI,MBER 5
<br /> ANTENNAS. JUMPERS SHALL BE TYPE LDF 4, FLC 12-50, CR 540, OR FXL 540. SELF-AMALGAMATING TAPE.
<br /> SUPER-FLEX CABLES ARE NOT ACCEPTABLE. JUMPERS BETWEEN THE RRU'S AND 0
<br /> ANTENNAS OR TOWER TOP AMPLIFIERS SHALL CONSIST OF 1/2 INCH FOAM 3. 3M SLIM LOCK CLOSURE 716: SUBSTITUTIONS WILL NOT BE ALLOWED. S P 1 LJ
<br /> DIELECTRIC, OUTDOOR RATED COAXIAL CABLE, MIN LENGTH FOR JUMPER SHALL 4. OPEN FLAME ON JOB SITE IS NOT ACCEPTABLE w
<br /> BE 10"-0". _
<br />
|