Laserfiche WebLink
Rom <br /> is <br /> CITY OF EVERETT <br /> EVERETT OFFICE USE ONLY <br /> wASH.GTON Permit Services Transmittal g„,,,,,,,„0 <br /> PERMIT/PROJECT/#: F.�. J c i--0I`-! FEB 0 7 2024 <br /> SITE ADDRESS: iE.C5 1=cA5,VV cc' C,vi k/,evs fp C1. 2Ls CITY OF EVERETT <br /> PROJECT NAME: ( u,,,t;,c.),o1 >2(..k Permit Services <br /> FROM: �y C;.1 hl';10-H- COMPANY: 0 Chronology—Permit Counter Transmittal <br /> 0 Plan Review Routing <br /> PHONE#: LI•7 147C1 )%7 7 c EMAIL: i6Ori<2.4 w�t,d'-Ce., cro,I.Cl i-"\ Location: ❑File ❑Reviewer Office <br /> Date Logged: By: <br /> Route to:(Check all that apply) Name of Reviewer Type of Review <br /> ❑ Planning Reviewer Name: El Re-Review <br /> ❑ Public Works Reviewer Name: E Revisions After Approval <br /> Building Reviewer Name:n'�•C,yv\,,.1 M c.,1K Revisions After Issuance <br /> Fire Reviewer Name: Other <br /> ❑ Other Reviewer Name: Other <br /> Provide quantities for all items submitted <br /> PLANS REPORTS/CALCULATIONS OTHER DOCUMENTS <br /> Qty Qty Qty <br /> Architectural/Building Plans _ Geotechnical Report 1 Correction Letter Responses <br /> 2. Structural Plans _ Drainage Report _ Draft Easement <br /> _ Civil Plans _ SWPPP Report _ Recorded Easement <br /> _ Site Plan _ Wetland Report _ Height Survey <br /> _ Landscape Plan _ Critical Area Report _ Base Elevation Survey <br /> _ Survey _ Traffic Study/TDM Report _ Critical Area Covenant <br /> 2. Elevations L. Structural Calculations _ Stormwater Covenant <br /> Floor Plans _ Height Calculations _ Covenant-Other <br /> _ Special Inspection Report _ Plumbing Calculations Performance Guarantee <br /> _ As-Builts _ Other _ Warranty Bond <br /> Plat Maps _ Other _ Other <br /> Original City Redlines Returned _ Other _ Other <br /> _ Other _ Other _ Other <br /> Other _ Other _ Other <br /> Items submitted are: <br /> ®Complete Plan Set Replacement ❑Additional Documents <br /> (Slip-sheeting not permitted) (To be added to file) <br /> Comments to Reviewer: FOR CHANGES IN SCOPE: <br /> Revised Description of Work: <br /> Revised Valuation: <br /> Signed: j/ �� � Date: 2/6/29 <br />