Laserfiche WebLink
LIGHTING NOTES LIGHTING SCHEDULE LEGEND <br /> ENERGY CODE: 2015 WA STATE ENERGY CODE 2021 WA State Energy Code 10 <br /> Element ID QTY MFR. DESCRIPTION PRODUCT LINE/SERIES ITEM NO. WATTS FINISHICOLOR NOTES DEMO TRACK LIGHTING. ww u <br /> COMPLIANCE PATH: .15 <br /> A 3 LITHONIA SUSPENDED CPX LED PANEL TBD -- WHITE FINISH 2'3500K BULB REPLACEMENT TBDEXISTING TRACK LIGHTING <br /> ° . <br /> INTERIOR LIGHTING: 1.33 WIf(z LIGHTING ALLOWANCE(RETAIL) PANEL SERIES 3500K i a <br /> wW <br /> B 7 LITHONIA CANOPY&LOW- TBD 0 DBLXD 19"D X 3.75"H x y <br /> BAY LUMINAIRE VTLXSERIES BLACK FINISH 3500K RELOCATE SURFACE MTD <br /> FIXTURE PER SCHEDULE <br /> C 19 LITHONIA SUSPENDED 4' GRAD LINEAR SERIES TBD -- C202 81/4"WX41 <br /> LINEAR LIGHT BLACK FINISH 3500K <br /> NEW G <br /> D 1 LITHONIA SUSPENDED 8' GRAD LINEAR SERIES TBD -- <br /> C202 81/4"WX8'L ❑ PER S HEDUET FIXTURE <br /> LINEAR LIGHT BLACK FINISH 3500K <br /> E 4 LITHONIA SUSPENDED CPX LED PANEL _ _- WHITE FINISH 2'W X 2'L 0 NEW SURFACE MTD EXTERIOR <br /> PANEL SERIES 3500K XN FIXTURE PER SCHEDULE 0 <br /> EDGE LIT LED EDGE LIT BLACK SURFACE MOUNT EXISTING SURFACE MTD L_ O 00 <br /> N <br /> EXI7A 2 LITHONIA EXIT SIGN SERIES ELXTEU2 3 ALUMINUM W/BACKUP X(E) EXT.FIXTURE.REFURBISH <br /> 36 <br /> FINISH BATTERY PER SCHEDULE a. <br /> 7 <br /> SUSPENDED INTERIOR U N <br /> FIXTURE PER SCHEDULE <br /> SURFACE MTD INTERIOR O x� FIXTURE PER SCHEDULE IW <br /> • <br /> (� <br /> LIGHTING CONTROLS SCHEDULE RECESSED CAN FIXTURE <br /> �\ PER SCHEDULE co <br /> \ ROOM NO. ROOM NAME OCCUPANCY SENSORS DAYLIGHT SENSORS YY��(( EXISTING RECESSED CAN <br /> er,(GROUNDFLOOR p FIXTURE PER SCHEDULE <br /> AUTO ON 50%-OCCUPANCY SENSOR PER <br /> \ 110A INVENTORY ROOM C405.2.1.2 <br /> EXIT SIGN T <br /> AUTO ON 50%-OCCUPANCY SENSOR PER CONTINOUS DIMMING;PRIMARY&SECONDARY ZONES CONTROLLED > E <br /> 110B EXECUTIVE OFFICE C405.2.1.1 SEPERATELY;DIFFERENT CARDINAL DIRECTIONS CONTROLLED TOGETHEF LLJ 0) OJ <br /> W <br /> ROOF MOUNTED LLB <br /> 110C OPEN OFFICE AUTO ON 20%-OCCUPANCY SENSORS PER CONTINOUS DIMMING;PRIMARY&SECONDARY ZONES CONTROLLED FLOODLIGHT PER a" E LT) <br /> C405.2.1.3-CEILING MOUNT SEPERATELY;DIFFERENT CARDINAL DIRECTIONS CONTROLLED TOGETHEF SCHEDULE 0 <br /> O <br /> AUTO ON 50%-OCCUPANCY SENSOR PER CONTINOUS DIMMING;PRIMARY&SECONDARY ZONES CONTROLLED EXISTING POWER tT <br /> 110D CONFERENCE ROOM C405.2.1.1-WALL MOUNT SEPERATELY;DIFFERENT CARDINAL DIRECTIONS CONTROLLED TOGETHEF <br /> POWER <br /> 5 110E PRIVATE OFFICE AUTO ON 50%-OCCUPANCY SENSOR PER <br /> 4 C405.2.1.1-WALL MOUNT STANDARD SWITCH <br /> \ 110E PRIVATE OFFICE AUTO ON 50%-OCCUPANCY SENSOR PER <br /> C405.2.1.1-WALL MOUNT 3-WAY SWITCH r/1 <br /> 110G KITCHEN <br /> AUTO ON 50%-OCCUPANCY SENSOR PER v C405.2.1.1 NOTES: 2021 WSEC C4 <br /> 110H CLS. 1.ELECTRICAL WORK SH <br /> AUTO ON50%-OCCUPANCY SENSOR PER CONTINOUS DIMMING;PRIMARY&SECONDARY ZONES CONTROLLED REQUIREMENTS OUTUN LIN 018W EC. HE <br /> 1101 STORAGE ROOM C405.2.1.1 SEPERATELY;DIFFERENT CARDINAL DIRECTIONS CONTROLLED TOGETHEF W `� <br /> 2.LIGHT SWITCH LOCATIONS R ESTIMATED 'G <br /> LOCATIONS AND SHALL BE VERIFIED WITH OWNER PRIOR TO c O <br /> ELECTRICAL WORK. cV <br /> \ 3.ALL LUMINAIRES SHOWN ARE NEW,EXCEPT THOSE NOTED <br /> AS(E). o <br /> 4.HVAC WORK,INCLUDING CONTROLS,TO BE MODIFIED AS .A <br /> NECESSARY UNDER DEFERRED SUBMITTAL BY DESIGN-BUILD <br /> g \ CONTRACTOR.MODIFICATIONS&EQUIPMENT LOCATIONS m LL M <br /> 8 9 SHOWN ARE FOR REFERENCE ONLY. <br /> W M <br /> g O 5.EXISTING SPRINKLER SYSTEM SHALL BE MODIFIED AS co <br /> 0 \\ \ NECESSARY TO ACCOMMODATE NEW SPACES. \ N <br /> is I <br /> \ 6.CEILING GRID TO REMAIN;REPAIR/REPLACE AS NECESSARY. w l Z <br /> 7.REPLACE CEILING TILES TYPICAL THROUGHOUT WITH w 0 <br /> VVAVA� A�\V ARMSTRONG ULTIMA LAY-IN24"X48'OR SIM.NRC=0.75,CAC �ry <br /> 40 3 Z <br /> 8.DEMO ALL OBSOLETE WIRING DUCTWORK,ETC. <br /> W I <br /> \ NEW ACOUSTIC SOUND BAFFLING V <br /> EMERGENCY LIGHTING SHALL COMPLY WITH IBC SECTION H < <br /> \\VA VAp A <br /> PROVIDE EMERGENCY LIGHTING E Z <br /> ACHIEVEAMUM ILLUMINATION <br /> LEVEL <br /> O1 FOOT CANDLE <br /> AT THE WALKING SURFACE.EMERGENCY LIGHTING SHALL NOT Q > <br /> 10.MODIFY <br /> .-;A,A \\v VA v A A BE ON OCCUPANCY OR DAYLIGHT CONTROLS. O � <br /> v A \ <br /> \ \ \ \\ \ Q <br /> U v vV�A VA V A VA�`V�VA OCCUPANCY SENSORS <br /> SHALL <br /> PROVIDED <br /> PLAN.NEW S <br /> F- <br /> OCCUPANCY SENSORS SHALL BE PROVIDED � Q <br /> Lt1 to <br /> THROUGHOUT. I` ` W <br /> E E ` Y <br /> \ A.LEVITON WALL SWITCH OCCUPANCY <br /> SENSORS IN WHITE SHALL E PROVIDED IN <br /> ALL NEW OFFICES,CONFERENCE ROOMS, � <br /> '� �V v v ` p VA\ \VA� KITCHEN,AND INVENTORY ROOM. <br /> B.LEVITON CEILING MOUNTED OCCUPANCY <br /> 9 `��A�, �� VA `\ AA V��O� �ySENSORS v \AV�V�A�v \ PROVIDED INSTALL B INSTALL MULTIPLE SENSORS AS <br /> REQUIRED 70 PROVIDE COVERAGE <br /> THROUGHOUT <br /> 11 ALLARRES PANCY 100%OFF WHEN T 0 BE SPACECONFIGURED TO UPTURN <br /> E E LUMINAIRES 100%OFF WHEN THE SPACE IS UNOCCUPIED. <br /> 12 SIDELIGHT W/NO MORE THAN 2 GENERAL LIGHTINGFIXTURES <br /> ` \ <br /> RESPONSIVE NOT REQUIRED 70 HAVE DAYLIGHT a <br /> RESPONSIVE CONTROLS PER C40524 <br /> NOTES: 13 LUMINAIRES IN PRIMARY&SECONDARY SIDELIGHT <br /> 1.GALVANIZED SPIRAL XVAC DUCTING TO BE INSTALLED IN DAYLIGHT ZONES MAY BE CONTROLLED TOGETHER IN SPACES <br /> \ \` WI NO MORE THAN 3 GENERAL LIGHTING FIXTURES IN <br /> PLACE OF FLEX DUCTING DAYLIGHTZ ONES. <br /> \ \ <br /> 14.LUMINAIRES IN SIDELIGHT ZONES FACING DIFFERENT <br /> CARDINAL ORIENTATIONS MAYBE CONTROLLED TOGETHER <br /> \\\., UP T02 LIGHT FIXTURES IN EACH SPACE MAY BE <br /> \ NEW ACOUSTIC SOUND BAFFLING: CONTROLLED WI LIGHTING IN A DAYLIGHT ZONE W/DIFFERENT <br /> "�`\ �' \V\-• ORIENTATION_C405.2.4.1.6 EXCEPTION. <br /> DEMO (E) FIXTURES&(E) ELECTRICAL, �y SUSPENDED 5.INTERIOR LIGHTING ALLOWANCES:OFFICES=0.64 W/FT2 <br /> ;� \ -------- ACOUFELTITRUSS <br /> TYP. (E)GYP CEILING TO REMAIN `\' WQ2I DRIFTWOOD 6.CORRIDORS SHALL HAVE CONTROL DEVICES TO REDUCE <br /> �;,`\ LIGHTING POWER BY NOT LESS THAN 50%WITHIN 20 MINUTES <br /> OF ALL OCCUPANTS LEAVING THE AREA,AND COMPLY WITH <br /> ((/"••� '- - /� _ SECTION C405.2.2 TO TURN LIGHTING OFF WHEN THE <br /> DAYLIGHT ZONES BUILDING IS VACANT.DEVICES SHALL RESTORE LIGHTING TO <br /> FULL POWER WHEN OCCUPANTS ENTER THE CORRIDOR.SEC <br /> ---------- C405.2.1.2 <br /> PRIMARY DAYLIGHT 17.OPEN OFFICE AREAS SHALL HAVE GENERAL LIGHTING <br /> CONTROLLED SEPARATELY IN UI ZONES WITH <br /> AREAS NOT GREATER THAN 600 SF WIITTHIN THE OFFICELOOR <br /> SPACE.DEVICES SHALLAUTOMATICALLY TURN OFF GENERAL <br /> LIGHTING IN ALL CONTROL ZONES WITHIN 20 MINUTES AFTER <br /> ALL OCCUPANTS HAVE LEFT THE OPEN PLAN OFFICE SPACE. <br /> SECONDARY DAYLIGHT DEVICES SHALL REDUCE LIGHTING IN EACH ZONE BY NOT <br /> LESS THAN 80%WITHIN 20 MINUTES OF ALL OCCUPANTS <br /> LEAVING THT CONTROL ZONE(CONTROL FUNCTIONS THAT 8/21/24 <br /> SWITCH CONTROL ZONE LIGHTS COMPLETELY OFF WHEN THE <br /> ZONE IS UNOCCUPIED MEET THIS REQUIREMENT).DAYLIGHT <br /> RESPONSIVE CONTROLS ACTIVE OPEN PLAN OFFICE SPACE <br /> GENERAL LIGHTING OR CONTROL ZONE GENERAL LIGHTING NEW REFLECTED CEILING <br /> ONLY WHEN OCCUPANCY FOR THE SAME AREA IS DETECTED. PLAN <br /> SEC C405.2.1.3 <br /> FIRST FLOOR SUITE 110 PROPOSED REFLECTED CEILING PLAN A2 .2 <br /> A2.2 1/4" = 1,_G o �' 4' a' <br />