My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2814 RUCKER AVE 2025-04-07
>
Address Records
>
RUCKER AVE
>
2814
>
2814 RUCKER AVE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:26:25 AM
Creation date
3/24/2025 10:40:14 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
2814
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 20, 2024 <br /> To: City of Everett, Permit Services <br /> Attn: Scott Schreffler, RA <br /> Re: Marcel 1 It <br /> Building Review Letter <br /> Plan Check No.: B2408-025 <br /> Dear Mr. Schreffler, <br /> Please find below our itemized responses in black to the 1It Building Review Letter dated <br /> September 10, 2024. <br /> General <br /> 1. The applicable codes used in this review include, and are not limited to, the 2021 <br /> International Existing Building Code (IEBC), International Building Code (IBC), <br /> Washington State Energy Code (WSEC), International Fire Code (IFC) and <br /> Washington Accessibility Code (ANSO 117.1-2017). <br /> Applicable codes noted under Project Information on sheet A100. <br /> 2. The scope of work includes demolition work that is not represented on the drawings. <br /> Please show all wall, doors, ceilings, security gates, etc. that are in the scope of the <br /> demolition. <br /> There is no demolition work needed for this scope of work. Therefore, no <br /> demolition is noted or plan provided. <br /> 3. The scope of work can be classified as an Alteration-Levell if no installations of <br /> fixtures, etc. is higher than 5'-9". Please confirm. See IEBC 602.1 and 603.1. <br /> 4 wall sconces will be installed at 7'-7"along the north wall behind the <br /> banquette seating. These are shown on sheets A100 and A101. Otherwise, <br /> there are no other fixtures installed in this scope of work above 5'-9". <br /> 4. All new work is required to meet current code. See IEBC 503.1. <br /> Noted on sheet A100 under Project Information. <br /> 5. The building includes 2 apartments on the second floor which were permitted as <br /> construction type V-1 hour in 1982.The floor/ceiling assembly between the first and <br /> second floor shall remain as a 1-hour separation. Please describe and show all work <br /> that will be done on the ceiling/floor above. <br /> The extents of the scope of work done to the ceiling/floor assembly is a finish <br /> coat of paint on the ceiling. No other modifications or alterations are made to <br /> the assembly. Note added to floor plan on sheet A100. <br /> 6. Existing buildings undergoing alterations and a change of occupancy are subject to <br /> the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.