Laserfiche WebLink
w <br /> m <br /> D z <br /> z o <br /> z <br /> w w <br /> w <br /> m <br /> N <br /> N <br /> y m <br /> PROPOSED RENDERING ° # d3 <br /> %3 LU N w <br /> TOM CADDOCK <br /> � � N <br /> E ry <br /> 0 z LU <br /> } <br /> Co <br /> z <br /> 0 <br /> w p <br /> Z <br /> LL ii <br /> W <br /> J <br /> H a <br /> H Cn <br /> SCOPE OF 1N0RK: o <br /> U <br /> Ne are installing 136 5QFT of Elite Pressure Treated deck <br /> �X <br /> cover. The Homeowner will demo the current deck. <br /> '6_ <br /> This deck will be detached from the structure. <br /> U O <br /> Ne will be framing the entire deck as well as the steps. <br /> 0 w <br /> o <br /> CnW <br /> total of 136 5QFT. <br /> o . <br /> lNe are installing an E.P.T. railing (surface mounted) 2b LFT L <br /> Yale are instaling T1 -11 siding on the side of the deck and zcr_ z <br /> steps. 100 5QFT. W ° o <br /> W � 3 <br /> Yale are installing a storage door on side of the deck in the L UJ z <br /> T1 -11 siding. 3' x 3' �/ X 3 <br /> f % w z <br /> Ne are installing a metal roof overhang to cover the deck. W w Cn <br /> z <br /> exact type of metal TBO. Total 5QFT 150. 0 <br /> W = � <br />