Laserfiche WebLink
2 13 14 5 6 <br /> Duain 5 ems Multiple Zone HVAC Systems,High Efficiency VAV-Required for systems uUlizing C403.6 DOAS Exception 2 must cdampi with all 16 pro <br /> Indicate on plans that all dlctw pink k constructed and sealed per MC yq.g1 C403.7. InEcste system is configured for 100%air economizer operation and compiles with an relates Service Water visionsHeating Permit <br /> Yes G032,8,1 Duct construction HA bm 1 Air economizer r requirements per 0403.3(w shout..on-m a-r exceptions) 2015 Washititon Stale Energy Coate Conplan re Forme for Commercial Bu iftVs including R28 R3 over 3 skha and al RI Ravked January 201T <br /> G032.8.3 For OSA duclw ork also indicate on plans Nat tluclw ork meets air leakage requirements per econanze <br /> Cl5 and vaportartlet requirements ate IBC M3.01 C4033, Rovde CDC controls for all components of system identify all DOC system input I output Project Title: Hopeworks Station 2 Wk 12/8/2017 <br /> roc qukemen per NA Direct digital controls(OOC) <br /> Oucl MECH bm2 control <br /> Points:indicate capabity for bending and graphical display The follow ing formation s necessary to checks met application for compliance w ith the mchanckl system and M requirements of the <br /> Yea G032.8.3 Pressure Merely location of low,medium and high pressure ductw ark on pins ^gin Y Per PP rrp Ys equipment gtareman <br /> classrficatione PLANE For systems w ith rtininum OSA>2.500 clot.indicate outdoor airflow monitoring station Nat Washington Slate Energy Code,Commercial Provk'nns. . <br /> high pressure duct leakage Indicate high pressure duct leakage testing requirements on plans;provide test results to MA C403.7, Outdoor airfbw measures OSA make under all bad conditions;indbale control sequence Nat increases or Appicabk Location in Building Department <br /> Yea G03.2.8.3.3 YKEMAN <br /> last jurisdiction w hen completed M1.01 item3 ...mrreMarM reduction reduces system OSA cfm based on VAV terminal feedback of verdleli°n et(icency(per Coate Section Coate Provsion Information Required-Must be in permit documents me C403A.4.3 shout exceptions)or XV(per C403.2.6.2) (yes o nit) Coumenis sties <br /> Fors ppty d WMd.Nn kl aced n climate <br /> zone;oned space c ptions taken <br /> akndeak Rvalue MECHPLAN C403.7, Srypyairflow For system th mOS4>2600cfm ind' te supply sallow monitoring station Equipment-Sizin Performance andT <br /> of ins lei d caw k plans;ideniify t zone Me exceptions taken RANG NA SVM equipment t¢ tl Rovide equipment schetlule o lams-nil iafn t d capacity,indcate efficient ND.01. <br /> Fors supply d ctw ork be.eat conditioned space,IdeMdy f design supply temperature a< MKH bm4 measuremen ARCHITECTURE DESIGN <br /> capable of-a ins suppy d I' d to VAV terminal.under all bad candd,n Yes G04 2 qupmen type an quipmen p g type an y <br /> G032.8.1 p ptlom Verf nd b k FEVAV s kmk 5 c0,00 sf,or one eMre tbor eflbiency compare <br /> w ith required federal standard FV.02 <br /> Yes Dxlnsulation 55°For>105°FandindeakRvalueofisulaknonmisdotworkon lams nokezce R-nas ymeznurn.m.sery y rig ya <br /> G032.8.2 taken Cgain 5' Zane swell and maximum For individual SWH equipment servirg an antra building w ith z 1,00C,000 Btulh capacity. <br /> bm 5 a servetl e'expected <br /> t k greater.^addition if a system serves a zone <br /> i sf ioncontrolincludes areas that one indicate thermal effckency z 90%',or exception taken <br /> For OSA dohv ork,shafts and plenum.ndicate Rvalue of nsuktbn on Ness ekmans on M371 are expected to be occupied non-sm,Xeneoesly,indicate zone isolation controls per G0.2.4.4 -- <br /> ­dylmmar.net 1716 West Marine View Drive <br /> plans per Table G102.1.3 Wr ad <br /> w ails:ok exception taken PLANS High input-rated SVd-I For 1c,dings w ith aggregate capacity of all SHVJ equipment z 1,000,000 BIWh(exclude< <br /> Interior lexterior zone NA G04.2.1 100,000 Btuh equipment from threshold calculationl,ielcam average capacity w sighted <br /> Piping S ems G033, Verily Nat VAV termnal.,swig interior cooling driven batls are swat per resign supply air system iherml efficiency 2 90%;or exce filar taken <br /> E Hl1 design supply <br /> air Y _ P E <br /> indcate des n to eratue ran a of fluid co a ed'm and ihckness of nsulalion'n bm 6 temperature that k 5°F higher than VAV krminak serving exterior zones <br /> Yes G0.2.9 Rpng rsulaton g � g m y ppng ( temperature H epplY-^g Exception 1 for sae solar or see recovered energy,private calculations and <br /> inches)on hydronic p ping pl xceptbn taken Po.01 Identify terminals w III min lbw set onts>50%of their ee 1 n souce of annual service water hoping energy use estimate <br /> Rpng insulalon exposetl to ntlicate method of proleclion or Ape insulation from damage(degradation on hydronic piping G03.7, Mxartum air terminal inlet Y air primary air p gran • <br /> Yes G0329.1 '"finer plans Po.01 Mom 7 velocity equipmM sic had We or NECKED form;indicate as terminal nit velocity does of exceetl 9lq Yes G04.4 Fiat traps Indicate Aping connected to equ pment lave heat traps on suppy and discharge Pool <br /> fpm Insulation under electric For ekclrc w afar heaters bcaktl n unconditioned spaces or on concrete floors,indicate R- <br /> Economizers Ml1 C003.7' Sequence of operation Indic Me DOC system sequences of operation are designed and con gured per ASHRAE GPC Yes C404,5 water heater 10 nlectrion antler equipment Po.01 <br /> Identify in equipment schedules on plam or In fiEOLED forma all eye.-mgmr`g Rem B 36 <br /> air controls G03.7, Maximum allow able system Verify fan system bhp s 590%or the bhp limit per Option 2 equation in Table G03.2.11.1(1), PI In S ems <br /> NA Indicate Niclness of piping insulation on plans per Table G0329 vrrfy'nsulanon s <br /> NA G0.3 Ak economizer requretl chose.MECan.Me-idef Indicating- system utilizing a, schools <br /> plan. ,incbdirq Ran brake horsepow er private MLCRFANSYes and S form mall ter each system provided-from the w star heater to the final fixture in a me,from the mkt/outlet piping al <br /> Noseweh water stale ecoomzer'n ilea of ail econarn¢er Mcateon plans eligible Indicate all Beres and parallel terminal tens have ekctronicaly connutakd motors.irdkak Yes G04.6 Insulation of piping w star heater to beat ban,(up to 8 feat)and on piping that shoat traced note exceptions <br /> xceptbn(a)taken and measures to comply w N exception(,) NA 0,103.7, Fan-pow eyed lermnal unit DDCcontrol system a confgwed W vary air lermnal tan speed as a function of Me bad; taken Pool <br /> UK G0131 Integrated econonm¢er Indicate air and w aten-side ecoornzers are configured for panel cooling operation even item 10 motor and control nd,,te fan speed dunng periods of low heating,low coding,or ventilation city is 566%of <br /> ol <br /> operalcn-ail and w afar w N e additional mechanical cooling k required to meet the bad peak design or flow or provide supporting documentation for applied exception Income method of corrpli nice on plans for all piping runs connecting service hot,afar Po <br /> E-muncer heating system Verify control method of M/AC system w an ecoonrzers does of increase building halting Application of single duct Yes G04.3 Efficient SWH supply piping source to hot water fixture(maximum pipe length or maximum pipe volume method per Table <br /> IN C/03.3.2 G03.7, Inds ate VAV krmmnaltypes on plans;verfyones.wered leminelands city serve perimeter RAN <br /> impact-ail and water energy usage during normal operation NA and fan-pox ered terminal s CA09.3.1).provide cakulalions for all piping runs documenting the total length and 1 or volume <br /> Ism 11 zone win envelope loads;verify al other zones are served by single duel terrmnel uMis ORHWIf4G5 <br /> 14A 0403.3.3.1 Ai econorteter capacity ntlicate modulating OSA and return air damper are configured W provide up to 100%OSA ands <br /> for doling Service Water Heating System Controls <br /> Indicate ODC controls are configured to automatically reset the primary supply a' f ipeiM <br /> Verity mechancal owing coMrols rote'nterbckndwah air ecoorrsercantrok so 0.outside G103.7, Fan-powered terminal unit For dnculob.n.wstemwih dedicated return piping, d ate comb°s are configured to <br /> NA ofalfan pow,milt deadbludistoed mnimam required tonit t ventilation during <br /> fM all damper remains in 100%open position w hen mechanical coding s also required to we tam 12 prkrery air reset eulomafcaly start parry based on demand for hot t and shut-off pump w hen Mare k no <br /> G03.3.1 occupkd hakg or deadband,based upon the VAV or handling unit OSA ventlalion fraction <br /> Integrated as ecoomaer the coofmg bail,anti the leaving ale temperature I.<45°F demand and w hen the desketl w star termperature'e met <br /> G033.3.2 G04.7.1 Feared-w air circulating <br /> MR For system w sh cooling capacity z 65,000 Egon,verity Nat control of econar¢er dampers For space.>150 stwith occupant density z25 people 11000 if,indcate space is servetl by NA C4048 system For cicWbon system with cod water supply piping serving as the return,indicate controls <br /> not based only on motes air temperature;or exception taken C403.7, High occupancy space a dedicated is neral unit w ith D(.V condo, <br /> that resets terminal unit ver ion eetpoant.also ys eme a configured W automatically skit pup,based on demand for hot w star and shut-off pump • <br /> Air econorre"high unit a item 13 controls indicate occupancy sensor control that automatically reduces mdnimim ventilation to zero and w No there's no demand,or w hen temperature of water entering the cold w star supply pipe <br /> NA G033.3.3 indcate high brit shut-off control method and required high lint per Tebk G0.3.3.3 NA <br /> s z 1G°F ❑controls sets back room heath and cooling set points z5°F ❑ O <br /> 9 ^9 oP Y op° ❑�O <br /> For eligible system whre water-aide ecoonnizer may be provided in feu of ail aconomRer. Fo server,ekctronc equipment.tebc or solar spaces w Ah coolirg bads>5 W/sf, For hear bate system provided to maintain temperature of service hot weir in Aping, OO <br /> MA G033.4.1 Wafer m,no,er capacity indicate system ce capable of 100%design cooing capacity st 50Tdb/45F wb OSA C403.7, indc Me spaces are served by ndependere HVAC ambemthalane separate from FP/AV Yes C104,7.2 Meet trace system controls indicate controls are configured W da-energize system w hen there a no demand for hot <br /> NA Dedicated FNAC system O WO <br /> waterand,hnNedeairedwaterk rewrekmet Pom � f AS <br /> krryeratures item 14 system <br /> serving rest of building:indbale detlbekd FNAC system have art economizer ^p• 00 �O Nij, 00 <br /> NA 04033 42 Wailer econower maximum hticam pressure drop across precoolig cols and Mat exchangers in water econorm ar controls or energy recovery per C403,3 Exception 9 Controls for hot w ater For system with separate water healer and storage tank.indicate controls are configured to <br /> Yes CA04.7.3 <br /> pressure drop syskm do of exceed pressure drop firril Indicate w nether system are served by a high efficiency heading water plant,or a high storage Im operation time of pury after end of healing cycle to<5 mutes <br /> Po.0 � � Z <br /> DY air handbag equipment For DX air handlers wan ecoomaen and cooing capacity z 65,000 3iWh,refer to HVAC efficiency chilled water plant For SMi,pool/spa and pressure boosting purry motors 275 hp,indcate method of vanabs <br /> NA C40.3.1 control S st.....is for requirements <br /> e urements f c high efficiency heat tar plant.Indicate all VAV krmnak have h dronic lbw c wlrol(VSD or equivalent method that requires z 30%desgn wamage at 50%design <br /> O <br /> y q arryyig ve g y heating p y G03.2.13 VerebklbweoMrol- <br /> to equpmaN economizer Pon DX air handlers w ith ecoomzer end cooing capacity z 54000 3iWh.provide a fault hea0ag cols served by heating w stem system weh either gas-fired boikr(s)w ith thermal NA G042 7 pumps fbid flow)',nok exception taken �00$PFG/sTo6'0OOO <br /> NA C40324 7 fault dow.io,and dewclam and!diagnostics(FDD)syskm to=nsor economizer system operation and report C403 7, effcency z 90%,ai-ta-W air heat pumps,or heat recover chillers berefy base of pump speed comroI(differential or stage pressure setpeint,pressure,zone /L� <br /> HA Central plant efficiency __recovery 00�S `s\ 0 <br /> diagnostic. feU. item 15 f corrylyig vas high efficiency chilled w scar plan:Indicate al VAV ail handlers have coofnB bad demnd,etc) O S��A�F-\v O <br /> cock served by chillers w ith raid PIN efficiency that exceed,WSBC listed IRV by at least OOOOrI❑❑°O <br /> Systems RequiringEner Recover Pools and Permanent -Equipment and Controls(Sections we under G09.11 <br /> system gn sign supply as c g 25%per Table G703.2.3(7)(now w Mer-cooked IRV s mix.at d we are mn):indicate Florida 1 schedule on s indicating t and capacity far and I heat <br /> Fors tam weh des QSA>S,00000n or des fm and OSA exceeding Pod heating <br /> t equipment plan ling type pacay Poo ng PROJECT IDENTIFICATION: D <br /> D amelest chill or compressor-n Aland k s 20%of toil plats capacity,a provide thermal g equPmen <br /> the values-n Tables C4035.1(1)or(2)ideate exhaust it H2 method;or exception taken NA G04.101 q porn',idcaca efficiency <br /> corrplea with required federal atantlartl.for heat pump water <br /> storage (ors20%of WWI plats capacity eflcsneY hintersndicate COPz4 <br /> m` supporting°d ys ago, (DD)eye.. gar Energy recovery(ER)- �f rndbu rtt�les krtswAha lade OSA>5,000 cfm or le intlicate DOCs lem'ncludesafanMtletecton and diagnostic.Foni ed to Variable lbw control- <br /> C403.5.1 ventilation I exhaust y mu p yn gprega gn g7grege G03.7, FauM tletecibn and pens provi reporting o quire pamm H4 C403.2.13 Refer W Service Willer Fleet lamCormok <br /> NA iand AV tionand in <br /> V min of d krs(oraIIVAVairhandlers "'°ol" HOPEWORKS <br /> deaipn slgpy as cfm and%OSA exceeding the values h Tablas G03.5.111)or(2),isd"cock item 16 tlegnostcs W^Ps <br /> syskm Exhaust ale H2 method,o xceptbn taken w din supporting calculations, and'JAV air terrtnal ands in the FPVAV system C406.10.1 Indicate automatic on/off control based on scheduling and readily xcessbk on I off me Reh <br /> N11 Pool hexer on/oft coMrok P penstrong:- note exceptions taken <br /> Indicate ER rated a/feciveness that inc OSA enihalpy by z 50%based an dab HVAC ul mart Ener Use MeteringG04.10.2 healer that operates independent of thermostat <br /> between OSA and return ail enNapes t design nddbns For new bu kings>50111 sir and building adlM1,,>25000 sf verdy energy use mite'in, NA F 1 pool.and n-ground permanent spas and' k p retardant cover on plans STATION 2 <br /> For build- eh total lab exhaust-5 000 cfm indcate method of ener ed to Yes GOS3.1 HvAG equpmnl energy of rose t used to be s ice heatin tl roping,tlehum fca[on and ven[laton G701.10.3 Pool covers pock and-ry nd s healed b>90 F indcate cover shell-nclude Insulation z R- <br /> Laboratory exhaust ^Bg w gy recovery us us,miter n qupmn prov pa g an g For A grou pas <br /> MR G032.7.2 pre-condition labor,Wry mice up a i ERe f,,Wem,,(mn 25°F)a,h,rn,W,meNnd per , w ill be provided per C409'ndc ate eau port Opole for except on ND 01 12 <br /> system(energy recovery)exception(VAV exhaust,semi-condibned macaup,or CERM-1cuktion) For al pools and in-ground spas heated to>91 Indicate on plan,that sides and bottom are <br /> For tuWi ith Is o's ithwater surface area 200 sf,ndicate exhaust air E2 Documentation ands tams Specific Requirement Tn that <br /> Ct mcanicse NA G09.103 Pool assembly insulation provided FOR <br /> rigs w poi pas w bed w ith Insulation 2 R 12 <br /> C704.10A Rook and permanent spa, method and use of waste heat heat venilmon air,pool w star or service hot w ater;or hdbate that al mechanical eye equipment, conbokncf.whcher VVSFL requires <br /> (Pre 1 Eergy consurpfan of <br /> canbol funcmns and I or configuralbn to perform specHb tuorbre are requretl to be M5}1 NA G04.12 Indicate portable s lea w ith Assonetion of Pool and Rdessionak APSR14 <br /> MA (undo exhaustayskm exception taken cone. RAW. portable spec Pa pa SP• HopeWorkS <br /> 0404,11) (energy recovery) Indicate ER system has the rated effaetweress and s configured to ldm udeexhowtak Scope of mechanical EO°rce <br /> temperature et�e design z36°F Yes G0.2 For buiidings wthz 240.000 Bluth talaloutput cooing capacity or z300,000&Wh roilo:ut EnergyRecovery ERS ems-Service Water He In and Pools ems <br /> q by system commissioning hazing capacity,indcate that al mechanical system regardless of andavirjual.epaeity are For told din ode o M s ith water surface a-,200 sf,indicate <br /> For buildings w th onab steam heating syste Indicate condensate w star H2 G04.10.4 pgsw p permane pesw <br /> Energy recovery- requretl to be cammissroned;or provide building hearing I wing capacity calculation Rook and permanent spas exhwast air ER method and use of waste heat(preheat venlation ail,pool water or servce <br /> Iw1 G0.s.2 Por tuidi Nat ace off-aite ated steamw here condensate is not returned to tlw (Section <br /> steamcondeneale system rigs genet demonstrating aigibiky for exception NIA urger exhaust system holweler):or exception taken <br /> source,indicate crust aohdimi w aten ER Indicate in plans and specifications hat tit per C408 is required to•1 applicable mechanical hi (energy recovery) Indicate H2 system has the rated effectiveness and is configured W decrease the exhaust ail <br /> For buildings w an fond service,mat or dell departments that have z 500.000 Bruins of remote syskm; BANS 0404,11) temperature at design condabna by z 36°F AT <br /> refrigeration capacity for coers I freezers,indicate condenser ER and use of captured 0103.2.10 Inc"general summary w ith x a minimum of Item i thou 4 of the Ct plan Per C408.1.2 For buildings w in food service,meal or deli departments that have z 500,000 BtWh of re=k <br /> e nergy(service w stair heating,space heating,or dehuraddam on reheating) G08.1.1 C'ssaonkg Including:narrative description of activities,responsibilities of the Cx team schedule of refrigeration capacity fforcoolers/heezere,astlbate W M condenser ER be used pre-hex 3315 Broadway <br /> MR C403.5.3 Energy recovery- Yes 0013.1.2 requirements in iectivitss including verification of project close rout documentation per C103.6,and ondffot of ED Energy recovery- servbewa er <br /> cooler I freezer condensers For buildings w ith z 40'000 of <br /> conditioned floor area and w th z 1,000,000 StWh of rem k Ind 0403.5.3 Everett, WA <br /> GOB.1.4.2 construction documents merest plan(M required); ORAv4NG5 caokr I freezer condeneere For kuidirgs weh 240,00 sf condioned floor area and weh i 1,000,000 BtWh of remak <br /> refrigeration capacity,for cookts I freezers,intlicate condenser E2 and use of captured C103.6 Include in general summery that a 0 project report or Compliance Qeckkl(Figure refrigeration capacity for coolers/freezers,indicate M condenser Eiwill be used to pre-heart <br /> energy for service,ate,heating and also for space heating,or dehumddcation rehealang C406.1.4.2)shall be compiled by the Certified tit Professional and provided W the ow nor EC servce w at., <br /> prior W the that mechanical inspection. DRAWINGS For bidding,w an 24-hour operation and>1.500.000 Ell of heat rejection capacity and <br /> For tuadingawlh 24houm operation and weh>1.5o0000 BtWh of heat rejection capacity Indicate in plans Nat or red fluid flow rates shad be tested and balanced wthin the Energy recovery- design SWM load>250,000&Wh,ideate condenser ER to pre-hex service w air,or <br /> Energy recovery- and <br /> design servce hot water bad>250,000 Etum.indcate condenser Egto pre-heal Air system and hydronic NA C103.fl4 CONFORMED SET <br /> NA G0.7.S.q Yes G08.22 tolerancesacarried in the specifications,' indcate system shall be balanced n a manner to MEQi condenser system exception lake.Provide calculations kg the a=sta of recovered heal that is Nixed <br /> condeneer syskm serveew star,or exception taken.Rovde.akula0ons showing the a=uM of recovered system balancing first -name Nroming bases N adjusted to meet design flow ndit RAtS (60%of peak heat jet bad p hoot service w star to 85°F). <br /> halthat ku need(60%al peek heel rejection bad or pre heal service water to 85°F). All arslem balancing Indicate devicesthat provide the capability to balance al supply air oWkta,zone terminals and bECH For systeme'oorp,ming 1, waler ER indicate sy.t..de.gn...Roes with CSA B55.2 5/14/2018 <br /> H dronic 5 tam Controls Yes C4013.2.2.1 tlmces ale handling equipment requiring system balaohg RAIS NA C40410 Drrtan water hex recovery or <br /> GSA 55.1 for Group R).indicate potable w aterside pressure loss at design flow is<10 <br /> For hydronc system pulp=tots z 7S IV,indicate method of variable flow control(VSD or Pail <br /> lent method that re 2 30%des nit t 50%des fluid flow Fytlronc system balancing Indicate devices that provide the system <br /> capability balancing <br /> isolate,balance and measure lbw across al <br /> equivalent quires design w a ge a design );note NA G02.2.2 yq'rung sys 'n9 including heating an 'msg co pins <br /> KA G032.13 Variable lbw control deuces h dnnic equipment' tam balanc ludin heat d cool Is and Servnte Water Heating EnorkV Use Metering <br /> G0342.7 hydronc syskm pumps exception taken SWH energy usage n For Group R2 Mfamly,bull g eh control SMI system provide melerarp of ndlwater Po.O, <br /> dently w hater hydrant cols have CDC controls and associated miner of pump speed Yes G04.9 a This Brewing is: <br /> Functional performance Identify in plans and specifications the intended operation of al equpmM and controls during dwell ailing units energy usag p d sling unit-indicate materirg and dock reporting method Po.@ <br /> C For control but pro pressure zone hydronc demand,etc) Yes G08.2.3 1.The ACopyrrchitects <br /> Dykemen,Inc. C <br /> For boilers but ice buidi hero' IesMg crileh al motley of operation,iobtlirp interfacing beau eon new and existing-Io-lamer system For new buildings-50,000 at and bailing natdeiona-25,000 sF,w m total SWM equipment provide nB caq,mom coMrok that provide heating water Yes CA09.32 SWH equpment energy use capacity z 50 kW(z 170,600 Bturh).verfry energy use mitering of all SWH equipment will be PO 01. 2.Theeen pems Instrument of other <br /> use or hap Service. <br /> temperature setback based on outdoor terrgerakrc melerng 3.For use on this project only.Obtain Architect's <br /> For rasing and chilled water system z 300,00 Btulh,kdcate system are configured W Project[lose Out Document ion provided per G09 FL.O written permission for any other use or reprOdUCIiOn. <br /> y rase pp y w terrper upon exception project indbale in plans that project close out tlocumMarbn and framing of buiiding operations <br /> automticall Isu I scar xure based demand;or exc ntakon. DocumeMa[ion and t Additional EffWe Pxk O tlon,Retluced Ener Use In Service Water Heating-Must tom I with both provisions to be ell able <br /> C/OJ.2.5 Fydronc system sebacit personnel s required for all mechanical conmponenis,equpment and system governed by To tom dh i ddOonaleHckmc t PROJECT <br /> NA f system pump=ton hp 2 3 hp,also indcate controls ammed.ly reduce flow by 2 50%. Yes C103.6 ckse out submittal p y w y package op an,verfy that z 90%of lye conditioned tbor <br /> Of03.4.2.4 and pan bps controls l - Ne code'indcate close out dorm n d cal ulationclude:record documank,O&M manuals, a of the b id - r=re of lye occu identif ed n the section OR <br /> For chill d t y tam(z to V 00 r eta pump mater hp 23 hp)gees serve sly xer-cooled requkements applicable YVSFL corryfance form antl cekulalions NA fA06.7.1 Bigibk building type B paoss - <br /> unta�y air conditioners.indicate VSDo stages pumps in chiktl water system and has Rovide w hole building energy analyse per Cg07 that demonstrates the SWH bad in the <br /> rejection bop Nat reduce pump flow so that one control valve is nearly w ids°pen,w W building Ic z 10%of total building energy bads 201E-025 <br /> minus a mni=m differential pressure exception taken To campy w ith additional effbko y package option,provide documentation that verrfks <br /> to G0A.2 Boiler sequencing Indicate automatic canbok Nat sequence operation of muMpe bailers z 60%of bull ig annual SWH energy is provided by high efficiency sources(heal pump <br /> For cooing equpment w n hot gas bypass,provide either multiple step unloading or G06 7 2 w ater heater w ith ODPZ 3,w rite heal recovery,solar w after-heaing system); <br /> NA G0.4.fi Flo[gas bypass imiation NA Load fraction For kuidirgs weh 24hour operation and w N>1,500,000 Bnuh of heal rejection capacity • <br /> confi,ous capacity nmadulation;Indicate by <br /> capacity per Table C403.4.6 G03.5.4 and des hat water load>250,000 Btuh(per,C403.5.4);provide documencation <br /> Two- hen cover intlicate changeover Oeatlband 15° .Kati /coon roils schedul and changeover design service <br /> MA 0 03422 pipet g g (min F)heading p ig a ngeover that verrf'ss 2100%of building anmal SWH energy s provided by wmdenser energy MARK DATE DESCRIPTION <br /> system temperature range(bon 30°F) very or other high efficiency,curt <br /> Wit 09034.2.6 oiler/bolkn plant pump Indicate controls are confgured to automatically reduce overall plant flow,and shut-off flow reco <br /> Isolation thmovgh-dividual chillers and boilers w hen nor in use Documentation and ecmic5 stem Requirement to Su ortin Commiselommur <br /> For cooing Ww,ers w ith fan=Wro z 7S IF,i dcate VSD and method to adjust fan speed <br /> Indicate that all SWH equipment and controls for w Inch the N5EC requires control functions <br /> 0403.213.1.1 (adjusted based on leaving fluid te.peraWre or condensertepereraWre/pressue of heat EC <br /> Fiat rejection equpmeM- Sipe of service w ekr and Ion configuration W perform specrfc functions are required W be comoasbned;+D7 <br /> MA C/0.4.3.1.1 rejeM'an device) system <br /> ORAWTIGS <br /> variable flow tomtit Yes G0.4 heat rem For triad here the largest SWH s tem has 1200,000 Blum real output capacity,G0.4.3.1.2 v For mmitipb-cell heat rejedion equipmeMwAh NSD,indicate contrite that ronall(one an mmssaning ngcw gas YB p <br /> Indicate that all SWH sy,sme regardless of individual capacity are required to be EC <br /> Float rejection equipment- I nson com ersioned. DRAWINGS <br /> IW CW034.3.3 cooling tow er flow Indicate be run i uit conling tow era w ith maliple pumps or VSD.oritrd are designed so all Indicate Nail all pool and permanent spa w afar healing system regardless of indwdual <br /> calk can be run In parole quire _Wrndow n Scopef I and capacity are required m nit comnssbned, <br /> o poi <br /> spa system <br /> IN C/03.4.2.3. Water bop heat parry- ntlicate capability of central equipment to provide rminimam20°Fw star supply temperature G08.4.1 3 per <br /> re Indicate that energy recovery equipment that heats pool w stem regandkss ofpacity isca1 =rent <br /> deadbend deamand be.eon hex rejection and heat addition modes;or exception taken mmssaning required to be conarassioned <br /> e <br /> Water bop heal pub-heal Indicate type of coing taxer(open-or cbsedcircuit)in equpment schedule;indcate klentfy all pool heating and energy recovery equipment and controls that Nit WSEC defarss <br /> NA G703.42.3.2.1 rejection equi merit,Zone 4 meth of used to and system hear loss w hen heal rejection s of needed as being capable of and 1 or configured to perform specific(unctions. <br /> Indicate'n plane and specifications that Ca per GOB s required for at applicable service EC <br /> Water bop hat puny-heal For cpen-or cbsed,rout cooing low ers,provide a heat exchanger that separates the w xer heating system; <br /> NA C403.42.3.2.2 DRAWINGS <br /> rejection equpmaM,Zone 5 coolirg low er and heat pump loop C404.13 Include genmal summery with at a mMmum of items 1 thru 4 of the tie plan per G08.12 <br /> G08.12 C ksb , <br /> YWter bop hat parry- For Fytlronc heat parry system w ith total system pow er>10 hp,ndcate 2-way isolation noWMq:naratve description of aclrvees,responsibsses of the tit team,schedule of <br /> NA G0.4.2.3.3 Yes G08.1.2 requirements in <br /> isolation valv. I vaults on each Not pump and variable flow syskm control G0.1 eetivlks ineMdirg verification of project close out documentation per C103.6,and eonlEct of EC <br /> .4.2 construction interestptan(drequired): olaYlWmxa$ <br /> B Dedicated Outdoor Air S tams DOAS-O tonal through 6 30 16 Prescriptive 7 1 201E C10.6 Include n general summery that a Ck project report or Conplkoe C1iso at(Fguro B <br /> For Widings w th office,retail,education,•waY and fire station spaces,identify these G08.1.4.2)shell be conplead by IN Certified C,Professional and provided b tin ow her EC • <br /> G0.6 Dedicated outdoor air spaces on plans:indicate that ventilation akin each occupied space is provided via a DCAS <br /> Yes prior to the final mechanical hspeclion. DRAWINGS <br /> 0403.6.3 sjsem syskm or document comptknce w ith G03.6.3 Inpracticality;or exception taken(buidings M37f <br /> complying with G02.4A4 or G06.6 may of Maze ex mptium) RAPS Functional performance kleMfy in plans and specdcatona the intended operation of all <br /> Yes G034.1 equpmnl and controls during PRINCIPAL IN CHARGE: <br /> Energy rec very ventilation For all DOAS system,Indicate exhaust air E2 method;or exception taken w ith support testing cneria all nmtles of operation,including Interfacing berm een new and ezktng-to-wmin system PROJECT MANAGER: <br /> Yes C/03.6.1 ,ith DMS calodations.Idcate OR rated effectiveness tlwt Increases OSA enhapy by z 50%based on PROJECT ARCHITECT: <br /> delta between OSA and return air entnapes a:design conditions_ MD.01 Project Close Out Document ion JOB CAPTAIN: <br /> Indicate t associated w ith me deliver f zone level heatin tl coif fans, Documentation and project �lndcrrw n plans that project close out douman ation and training of building oper honc <br /> equipment y° g a° ng( personnel is requiretl for at SV H co,ponents,equipment and system governed by this <br /> hydronic pump,primary ale dampers,eta)are configured to shut o0,and central equipment Yes C103,6 close out submittal <br /> Yes CO3.6.2 contkglcan DOAes clam ,h4graed to turn dow n,when there so cal <br /> for <br /> hazing or cooing in ion zone they serve requirements applicndcekcbsompltlocforman shalaobde:record documents,O&M manuals, <br /> controls w ith DOHS 6U.01 applicable VvS�compliance form and cakulations <br /> M applyi�Eception to heating/cooling fans used for ale mixing in Ix space during <br /> deamand periotls,include tan w ems per cfm n equipment schedule <br /> Increased prescrptave <br /> G026.1.0 fenestration <br /> vertical k,dkate that all occupied,condikned spaces are served by a DOAS per G0.6 <br /> Gp.6 fenealretbn area weh <br /> DOAS <br /> Additional Effci¢ Pad s 0 tan Dedicated Outside Air S tams DOHS <br /> Yes GC66 Sued ing provded w ith To cor plywXhadditbnaletfbiency package option,indicate thx 90%or room of al MI <br /> DOAS acapkd,conditioned spaces are served by a DOAS per G03.6 BANS <br /> Multiple Zone Airs stems <br /> Air system serving muscle Idenify supply air system serving mutipk zones and the zones they serve on pane; <br /> Yes GO144 zones indcate whether syskm a VAV and method of primary air control;or provide supporting hF]1 <br /> documentation for app ad exception W VAV PLANS <br /> Rovide equipment schedules on plans or MKKEO form that list all VAV eta cornNnek and <br /> types <br /> VAV system s wog Fan each air terminal-Inds.mximm airfbw,rates for primary supply air during zone peak <br /> t4A G01.4.4 multiple zones hearing and zone peak owing;m'uinalm sallow during reheating,mcdoing or making; <br /> nrininum airfbw,rem to maMah required ventilation.and the basis for these values.d MC or <br /> ASIl 62,1=ape zone equation is bass for mini=m flow rates,provide calculation on DRAWING <br /> plans <br /> Nk G034.4.1 Engle duct VAV terminal Indicate angle duct t manal units are c.nigurnd to reduce priory eupply air before <br /> units reheating or retooling <br /> Dust duct system-terminal For system w an separate warm ale ad cool air duck,indbxe terminal units are conrgued <br /> A MA G03.4.4.2 units to reduce the flow from.,a duct is mnnmm before rmixing w ith ale trom tne othe,duct ENERGY CODE A <br /> Indicate locations of duct static pressure sensors on plans;incbtle at Fast one sensor per <br /> major duct branch,verify controller setpoem pressure at Inch sensors 51.2 inch w.g. COMPLIANCE - D <br /> 0403.4.1.1 VAV system static For cyslem with zone laved DOC,-locate conook are configured W=nail zone counter <br /> Ca034.1.2 Pressure sensors- pistons and reset static pressure setpoht based on the zone requiring most pressure; <br /> sensors and ODC set points include control logic that automatically detects and generates an alarm M any zone <br /> bgb DRAWING <br /> MtXipk-zoo VAV system For system or on zone level[OCconrrok,inda:ate contr <br /> sysols are configured to auromtkally <br /> NA CA034.4.3 ventilation optimization reduce outdoor airflow in response to charges antemventilarbr efficiency,or exception <br /> ontrok taken <br /> Ind G034.4.4 VAV system supply air Indicate controls automatically reset supply air temperature in response W building loads or <br /> met outdo,air temperature.or exception taken E MIN , , <br /> 1 2 3 4 5 6 <br />