|
2 3 4 5 6
<br /> Economizer Ex • • • •
<br /> 2015 Washington Slate rergy Code Compliance Forme for Cgmmerciel Builditgs inclutlig R2 s Ra over 3 storks and all RI Nevisetl January 2017 2015 Wash-ton Sate titer Cbde Co Nance Porrre for Cormercal Buikin include R2 8 R3 over 3 storks ELM el RI •Revised January 2017
<br /> Project Title: Iitpew,orks Satan 2 Date 12/8/2017 Project Title: Ilopew orks Station 2 Date 12/8/2017
<br /> Allcoa s temsshalbaconf d" dea,rmommzera tiro dW,,,f For Building Dap,Lee For Building Dept.Use
<br /> •g ys figure prov pars n rattan
<br /> systemcap,,n,for new coretrudon and mechanical systemakemtimns.Various excepfom to
<br /> this requirement are available.deno Is tarts that an economizer excet-vill be applied DYKEMAN
<br /> quiemen ya ys p
<br /> I.
<br /> and additional information as noted below.
<br /> Economizer 88CONDMIZHt EXCEPTIONS-NEN CONSTRUCTION AND ADDTIONS Lighting
<br /> a HVAC Air Distribution System Schedule ARCHITECTURE + DESIGN
<br /> Exception Exit Coolingm,,mentservingspacesthatareprovidedwtha dedicaad System lD Equipment Usta11HVACsystemsthathaw the capabiftybpmvidehe ingard/ ,,dirgbfhespecestf y,,ts,
<br /> oufd°°rairayalem(DOAS)pa serve
<br /> d ed anal have year- Lwd ( 0s w/s
<br /> Summaryry ounddesign owing bade fromlighe arc equipment ksstmn 5 watts per Fan Pow er —dykam— 1716 West Marine View Drive
<br /> squarefool. Systenar System Totel calculation
<br /> Primary Supply Spa Control Description Nameplate HP Required
<br /> Fan ID (We 1) (Note 2) (Note 3) (Nate 4)
<br /> E OHP-1 CV LEVEL 1 HEAT PUMP SYSTEM IIHP-X-X) 3 No E
<br /> W2 Single zone uniaryorpackage systems v,in dshumidification that afkd System lD 0W-2 CV LEVEL I HEAT PUMP SYSTEM(IHP44) 3 No
<br /> •
<br /> otersyeterm—lithatake-mmazm would inereaseenergy OHP-ELEC-1 CV ELECIN PUMP SYSTEM(IHP-ELEC X) 0.5 No
<br /> ncumption. OHP-BMR-1 CV ELEVATOR MACHIEROOM HEAT PUMP SYSTEM I/P-EMR-1 0.3 No
<br /> R.I.I.Section co 1 )
<br /> C4033fa
<br /> descrlphons of W3 High efliciencysirgkzorreuniraryarpackagedsysrams Equipment System ID OHP-TEL CV TELECOM HEAT PUMP SYSTEM(RP-TEL-1) 0.3 No
<br /> cooling effkkncyshall be better than the ASEC required mni-in
<br /> provisions and efficiency by at Kest 64%in Omete Zone 4C and 59%in Clirete Zone 5B
<br /> exceptions.For per Table 0403.3.
<br /> alterations refer
<br /> to Section 4 E4ui
<br /> C503.4and EIP pmentrhatprokdes hyrImnycchniedsaterforchilkd6eamsan or System ID
<br /> Table C503 4. cidlledceiag syslarr ihat is served by a w star economizer system per
<br /> C403-3 4 in lieu of air economzer
<br /> EcP5 Wafer-souroeheatpumps withhealrecoery H4at pump efficiency shall System ID Nofe I-Came tentVolume(CV),Variable At Mume(VAV).Or HOspitaii CVsystem lhatqualifiesfor VAVb udgetper C403.211,1 Exception 1.
<br /> be 15%beter than VvSEC requited mninmm efficiency.Provide at Single zone VAV eyatems shall comply as CV
<br /> minimum 60%at economizer.Energy recovery b preheat OSA shal Note 2-Describesysfem type ardhst NI fans(orgroups offens)usoaefed win ihede)iveryand—"olca^dirionedair bythe system.Include
<br /> tw—le-450ffieffecdverese Addbonslsyslemrequirementsapply. ellsupply,mlurn/relief,exhaust endexheusthoods(>fhp).make wait dedkatedoucird—ir(DOAS),booster/s,andsen-fenparai
<br /> terminals.VAVparallelfen-poueredtwminalsandmo mize,r Wfamdonorneedwbeinci dedilthefansd nd operatearpeak
<br /> E: S Coolie ntsevI Grou Rocc Por ane lime is Cooling conob ons.
<br /> p an 20,00C rg p or ender Equipment Note3-EMerrhe t°telnameolstehp of,lifansw,mated Mthlhedeiwy,rdr oml,f,o ditiomd,,rbyth.,y t,,.
<br /> less man20,OOC BIWh cooing capacity equprrerinstalktl system ID Capacity ty smquire plawm pobera ( )
<br /> outdoors or in a Mach room adjacent to the outdoors.For cooling Location Note9-or this
<br /> form amoma,isn trecures because a Msystem has a co mi dfodemoe moo cant ah I /en llobence Yes, •
<br /> M installed in other locations the unit lied k less than (Bruin) or Mis Information,is not recurred because the system has acanbinedbfalnamep/atemota 1p mafis Shp w less(No) r
<br /> 54,000 Bluth.Efficiency shot be 15%better then VA3EC requites
<br /> MECH-FANSYS Forms 0,300001
<br /> (minim efficiency. Add Fan System 00 N7 0/?°o
<br /> A MECHorm)loSmeratermaddiromallor,Addleystems cambal nemadwithpttamin cell Shp Selected to=. O P` Volp7 Van/ablerefrg,,atftow(VRF),Atemswrhemrgyrecowry.Outtloor System Ioor D CCooling apacity Sysfem Fam)bgena&een adrkb'onalla-m.Addedlorms sambadelefedwahbunonin cell E32oltMedrletl"rtn. Fpml pOO���of y/ %. 0
<br /> unit shall be a reverserycb heat parry with variable speed
<br /> conpreasor(a)antl contlenea,(ants).Ouldour unit coding capactyshall (Btu/h) _ Z
<br /> be not less than 65,000 Sufi,Energy recovery to preheat outdoor air
<br /> shol have at Kest 5O%rated eftecti✓enese.Syatemshall be capable of O
<br /> providing simultaneous heating and coofrg by barrelling recovered
<br /> O' EC15TERF- O
<br /> mod.. m mao mre(s) oing b b ase otlarzore n tr
<br /> eating O O
<br /> Exp8 Coolinpequipnent serving GoMrdkWP/ant Grown EnvironmenIn System lD SEEK EBZS
<br /> O `s
<br /> Equy^em cooing effcremyshall be better than WSEr required II$i O FSS/�AL F-\v\00
<br /> �oa�nr�aoo
<br /> in by al least 20%.Nat eigble unbary and applul heal
<br /> D pumps. PROJECT • • p
<br /> Bep9 Coolm equiparrui energyrecovery Spaces served shallhave year- Duhtinge
<br /> oundde ugn cooling bags fromfghte and equipment greater than Byat.m ID Equipment
<br /> H O P E W O R KS
<br /> walls per square too,Energy recoaerysielemshal utilize recovered Lords(Wlsf)
<br /> energy for on,saespace heating or preheating of service hot w aler.
<br /> Provide calcAtonsto the code offckl that demonstrate the amount of STATION 2
<br /> vered energy used for on-site healing purposes isequivalenttolhe
<br /> must energy th""wild be saved by thecooing systemw 0ale
<br /> muer per M3.3.
<br /> Economizer • • FOR
<br /> 2015 Vyashigbn Sale rergy Code Corryf nice Forms for Commercel Buildings including F2&R3 over 3 storks and at R1 RaYsed January 201/
<br /> Project Title: TDate
<br /> 12/8/2017 Hopeworks
<br /> ECONOMIZER IXCEPTIONS-NeN CONSTRUCTION AND AWTIONS,CONTINUED
<br /> Economizer Exit 10 Cooling equipment/ordedicetedsew,electronic equlpmanl or Compliance Coaling
<br /> let- swtcheooms.Parbuiding limit forthwexceptions System ID Option Capacity
<br /> Exception 240,000 Bblh coaling capacity or l0%of required building air (Btu/h)
<br /> .SUII1111dry requ,ad overB OOO BtuT Additionaalr qu Rs�bass apply.
<br /> AT
<br /> Option a-Cooing equipment efficiency a had ice 15%better than 3315 Broadway
<br /> LeeerindeVvi required mnmxn effciency.. Everett, WA
<br /> Option b-Vaterside ecoricmber required.Cabling equipment
<br /> efficiency shall be 5%better man the V45EC required
<br /> m efficiency.
<br /> Option c-Waterside economizer requited.Attracting equpmem is
<br /> sublectto ASHARE Standard 127- Total Claimed Exempt Capacity:
<br /> Rausi Srcbon Total building ale economizer capacity(if claimed>240 kBtulh): CONFORMED SET
<br /> 0403.3far Alternate Efp 10 Capacity Limit:
<br /> descriptionso/
<br /> pronamnisr ECONOMIZER EXCEPTIONS-MEiNICAL SYSTEM ALTERATIONSORIEPLACEMENT SystamiD AILStrategy 5/14/2018
<br /> six-phourprovision and
<br /> .it..nme For C903.4 Re-approveddesign a/femative to"lit compliance wrhairecanheraor
<br /> s
<br /> toS....refer Expi requirement,Analerneuve for rechanical syslemaeerisonswnee exkbng
<br /> "Sec"°^ budding conste ins make full compliance'weherecone errequirement
<br /> C503,4ard mintioncal.Provide caculiaxseto thecade oificudmedemar-batethe
<br /> Table C503.4. proposedaft—tadesig—niftegyprov din mkrenergyrrevingstoma
<br /> annual energy thatw ould be saved by thecooNng systemw im ale economizer This drawing is:
<br /> C per C403,3. 1.Copyright 2017 Dykeman,Inc. C
<br /> 2.The Architect's Instrument of Professional Service.
<br /> ECONOMIZER EXCEPTIONS-SIMPLESYSTEMS Cooling 3.For use on this project only.Obtain Architect's
<br /> C503.4 Qualifiing—hequipmenr.Per and limit less than 33.000 Blufh.Per System ID Capacity written permission for any other use or reproduction.
<br /> Exp2 budding iml forthisexcept-is 72,000 Etulh coding capacity or 5%of (Btulh)
<br /> required budding air ec.-mcer capacity.w Nchever is greater.Coning
<br /> equip—M effi...yshalite 15%better than VvSEC required minimum PROJECT
<br /> efficiency.Not
<br /> eli bit:non-unitary equipment.unitary equipment irskletl
<br /> outdoors or in mach room adjacent to outdoors,equipment instaled during
<br /> new construction.sheeand-core construction,or mlial knand improvement.
<br /> 2016-025
<br /> Total Claimed Exempt Capacity:
<br /> Total bu llding air aconom lzer capacity(If claimed>72,000 Bluth): •
<br /> Ahe rnate C503.4 Exp 2 Capacity Limit:
<br /> C503A Equip mentthatprovideshydronicchniedwefer"'chilled water,tennlnal cooling MARK DATE DESCRIPTION
<br /> Btp3 units.Equipmern Part load cooling effickncy(RV)shalbe better Dian System ID Capacity
<br /> Vii eq.i.dminimum efficiency by at kast25%.Pat building rem for (Btu/h)
<br /> this exception as 480.000 BtWh cooling capacity or 20%of required
<br /> budding at capacity"hchever k greater.Chllsd water
<br /> terminal ands saving Group R occupancies are rot included in the
<br /> building capacity total.
<br /> Total Claimed Exempt Cap
<br /> Total building air economizer capacity(If claimed>480,000131
<br /> Alternate C503.4 Exp 3 Capacity Limit:
<br /> Table Compliance Optiats/oralferatbn orreplecemento/exisung System ID Equipment Compliance
<br /> me C503.4 chanical cadhgequipmamWTable C5034.Refertotabk Type Path
<br /> and all applicable table footnotes for ful requirements.Apples to
<br /> the fobw,iris mt•oft conditions:
<br /> Option a-Any new or replacement equipment
<br /> Option b-Replacement equipment of same type w lh Sarre or
<br /> rreSir cooing output capacity.
<br /> Optionc-RePIa<enrem equipaem of score type w lh arge
<br /> codirg output capacity.
<br /> Option d-New aqupment added to existing system or
<br /> repacemant equipment that is ddfereMthan ex'eting
<br /> being replaced.
<br /> B B
<br /> •
<br /> PRINCIPAL IN CHARGE:
<br /> PROJECTMANAGER:
<br /> PROJECT ARCHITECT:
<br /> JOB CAPTAIN:
<br /> DRAWING
<br /> A ENERGY CODE A
<br /> COMPLIANCE - E
<br /> DRAWING
<br /> 1
<br /> 1 2 3 4 5 6
<br />
|