Laserfiche WebLink
2 3 4 5 6 <br /> Economizer Ex • • • • <br /> 2015 Washington Slate rergy Code Compliance Forme for Cgmmerciel Builditgs inclutlig R2 s Ra over 3 storks and all RI Nevisetl January 2017 2015 Wash-ton Sate titer Cbde Co Nance Porrre for Cormercal Buikin include R2 8 R3 over 3 storks ELM el RI •Revised January 2017 <br /> Project Title: Iitpew,orks Satan 2 Date 12/8/2017 Project Title: Ilopew orks Station 2 Date 12/8/2017 <br /> Allcoa s temsshalbaconf d" dea,rmommzera tiro dW,,,f For Building Dap,Lee For Building Dept.Use <br /> •g ys figure prov pars n rattan <br /> systemcap,,n,for new coretrudon and mechanical systemakemtimns.Various excepfom to <br /> this requirement are available.deno Is tarts that an economizer excet-vill be applied DYKEMAN <br /> quiemen ya ys p <br /> I. <br /> and additional information as noted below. <br /> Economizer 88CONDMIZHt EXCEPTIONS-NEN CONSTRUCTION AND ADDTIONS Lighting <br /> a HVAC Air Distribution System Schedule ARCHITECTURE + DESIGN <br /> Exception Exit Coolingm,,mentservingspacesthatareprovidedwtha dedicaad System lD Equipment Usta11HVACsystemsthathaw the capabiftybpmvidehe ingard/ ,,dirgbfhespecestf y,,ts, <br /> oufd°°rairayalem(DOAS)pa serve <br /> d ed anal have year- Lwd ( 0s w/s <br /> Summaryry ounddesign owing bade fromlighe arc equipment ksstmn 5 watts per Fan Pow er —dykam— 1716 West Marine View Drive <br /> squarefool. Systenar System Totel calculation <br /> Primary Supply Spa Control Description Nameplate HP Required <br /> Fan ID (We 1) (Note 2) (Note 3) (Nate 4) <br /> E OHP-1 CV LEVEL 1 HEAT PUMP SYSTEM IIHP-X-X) 3 No E <br /> W2 Single zone uniaryorpackage systems v,in dshumidification that afkd System lD 0W-2 CV LEVEL I HEAT PUMP SYSTEM(IHP44) 3 No <br /> • <br /> otersyeterm—lithatake-mmazm would inereaseenergy OHP-ELEC-1 CV ELECIN PUMP SYSTEM(IHP-ELEC X) 0.5 No <br /> ncumption. OHP-BMR-1 CV ELEVATOR MACHIEROOM HEAT PUMP SYSTEM I/P-EMR-1 0.3 No <br /> R.I.I.Section co 1 ) <br /> C4033fa <br /> descrlphons of W3 High efliciencysirgkzorreuniraryarpackagedsysrams Equipment System ID OHP-TEL CV TELECOM HEAT PUMP SYSTEM(RP-TEL-1) 0.3 No <br /> cooling effkkncyshall be better than the ASEC required mni-in <br /> provisions and efficiency by at Kest 64%in Omete Zone 4C and 59%in Clirete Zone 5B <br /> exceptions.For per Table 0403.3. <br /> alterations refer <br /> to Section 4 E4ui <br /> C503.4and EIP pmentrhatprokdes hyrImnycchniedsaterforchilkd6eamsan or System ID <br /> Table C503 4. cidlledceiag syslarr ihat is served by a w star economizer system per <br /> C403-3 4 in lieu of air economzer <br /> EcP5 Wafer-souroeheatpumps withhealrecoery H4at pump efficiency shall System ID Nofe I-Came tentVolume(CV),Variable At Mume(VAV).Or HOspitaii CVsystem lhatqualifiesfor VAVb udgetper C403.211,1 Exception 1. <br /> be 15%beter than VvSEC requited mninmm efficiency.Provide at Single zone VAV eyatems shall comply as CV <br /> minimum 60%at economizer.Energy recovery b preheat OSA shal Note 2-Describesysfem type ardhst NI fans(orgroups offens)usoaefed win ihede)iveryand—"olca^dirionedair bythe system.Include <br /> tw—le-450ffieffecdverese Addbonslsyslemrequirementsapply. ellsupply,mlurn/relief,exhaust endexheusthoods(>fhp).make wait dedkatedoucird—ir(DOAS),booster/s,andsen-fenparai <br /> terminals.VAVparallelfen-poueredtwminalsandmo mize,r Wfamdonorneedwbeinci dedilthefansd nd operatearpeak <br /> E: S Coolie ntsevI Grou Rocc Por ane lime is Cooling conob ons. <br /> p an 20,00C rg p or ender Equipment Note3-EMerrhe t°telnameolstehp of,lifansw,mated Mthlhedeiwy,rdr oml,f,o ditiomd,,rbyth.,y t,,. <br /> less man20,OOC BIWh cooing capacity equprrerinstalktl system ID Capacity ty smquire plawm pobera ( ) <br /> outdoors or in a Mach room adjacent to the outdoors.For cooling Location Note9-or this <br /> form amoma,isn trecures because a Msystem has a co mi dfodemoe moo cant ah I /en llobence Yes, • <br /> M installed in other locations the unit lied k less than (Bruin) or Mis Information,is not recurred because the system has acanbinedbfalnamep/atemota 1p mafis Shp w less(No) r <br /> 54,000 Bluth.Efficiency shot be 15%better then VA3EC requites <br /> MECH-FANSYS Forms 0,300001 <br /> (minim efficiency. Add Fan System 00 N7 0/?°o <br /> A MECHorm)loSmeratermaddiromallor,Addleystems cambal nemadwithpttamin cell Shp Selected to=. O P` Volp7 Van/ablerefrg,,atftow(VRF),Atemswrhemrgyrecowry.Outtloor System Ioor D CCooling apacity Sysfem Fam)bgena&een adrkb'onalla-m.Addedlorms sambadelefedwahbunonin cell E32oltMedrletl"rtn. Fpml pOO���of y/ %. 0 <br /> unit shall be a reverserycb heat parry with variable speed <br /> conpreasor(a)antl contlenea,(ants).Ouldour unit coding capactyshall (Btu/h) _ Z <br /> be not less than 65,000 Sufi,Energy recovery to preheat outdoor air <br /> shol have at Kest 5O%rated eftecti✓enese.Syatemshall be capable of O <br /> providing simultaneous heating and coofrg by barrelling recovered <br /> O' EC15TERF- O <br /> mod.. m mao mre(s) oing b b ase otlarzore n tr <br /> eating O O <br /> Exp8 Coolinpequipnent serving GoMrdkWP/ant Grown EnvironmenIn System lD SEEK EBZS <br /> O `s <br /> Equy^em cooing effcremyshall be better than WSEr required II$i O FSS/�AL F-\v\00 <br /> �oa�nr�aoo <br /> in by al least 20%.Nat eigble unbary and applul heal <br /> D pumps. PROJECT • • p <br /> Bep9 Coolm equiparrui energyrecovery Spaces served shallhave year- Duhtinge <br /> oundde ugn cooling bags fromfghte and equipment greater than Byat.m ID Equipment <br /> H O P E W O R KS <br /> walls per square too,Energy recoaerysielemshal utilize recovered Lords(Wlsf) <br /> energy for on,saespace heating or preheating of service hot w aler. <br /> Provide calcAtonsto the code offckl that demonstrate the amount of STATION 2 <br /> vered energy used for on-site healing purposes isequivalenttolhe <br /> must energy th""wild be saved by thecooing systemw 0ale <br /> muer per M3.3. <br /> Economizer • • FOR <br /> 2015 Vyashigbn Sale rergy Code Corryf nice Forms for Commercel Buildings including F2&R3 over 3 storks and at R1 RaYsed January 201/ <br /> Project Title: TDate <br /> 12/8/2017 Hopeworks <br /> ECONOMIZER IXCEPTIONS-NeN CONSTRUCTION AND AWTIONS,CONTINUED <br /> Economizer Exit 10 Cooling equipment/ordedicetedsew,electronic equlpmanl or Compliance Coaling <br /> let- swtcheooms.Parbuiding limit forthwexceptions System ID Option Capacity <br /> Exception 240,000 Bblh coaling capacity or l0%of required building air (Btu/h) <br /> .SUII1111dry requ,ad overB OOO BtuT Additionaalr qu Rs�bass apply. <br /> AT <br /> Option a-Cooing equipment efficiency a had ice 15%better than 3315 Broadway <br /> LeeerindeVvi required mnmxn effciency.. Everett, WA <br /> Option b-Vaterside ecoricmber required.Cabling equipment <br /> efficiency shall be 5%better man the V45EC required <br /> m efficiency. <br /> Option c-Waterside economizer requited.Attracting equpmem is <br /> sublectto ASHARE Standard 127- Total Claimed Exempt Capacity: <br /> Rausi Srcbon Total building ale economizer capacity(if claimed>240 kBtulh): CONFORMED SET <br /> 0403.3far Alternate Efp 10 Capacity Limit: <br /> descriptionso/ <br /> pronamnisr ECONOMIZER EXCEPTIONS-MEiNICAL SYSTEM ALTERATIONSORIEPLACEMENT SystamiD AILStrategy 5/14/2018 <br /> six-phourprovision and <br /> .it..nme For C903.4 Re-approveddesign a/femative to"lit compliance wrhairecanheraor <br /> s <br /> toS....refer Expi requirement,Analerneuve for rechanical syslemaeerisonswnee exkbng <br /> "Sec"°^ budding conste ins make full compliance'weherecone errequirement <br /> C503,4ard mintioncal.Provide caculiaxseto thecade oificudmedemar-batethe <br /> Table C503.4. proposedaft—tadesig—niftegyprov din mkrenergyrrevingstoma <br /> annual energy thatw ould be saved by thecooNng systemw im ale economizer This drawing is: <br /> C per C403,3. 1.Copyright 2017 Dykeman,Inc. C <br /> 2.The Architect's Instrument of Professional Service. <br /> ECONOMIZER EXCEPTIONS-SIMPLESYSTEMS Cooling 3.For use on this project only.Obtain Architect's <br /> C503.4 Qualifiing—hequipmenr.Per and limit less than 33.000 Blufh.Per System ID Capacity written permission for any other use or reproduction. <br /> Exp2 budding iml forthisexcept-is 72,000 Etulh coding capacity or 5%of (Btulh) <br /> required budding air ec.-mcer capacity.w Nchever is greater.Coning <br /> equip—M effi...yshalite 15%better than VvSEC required minimum PROJECT <br /> efficiency.Not <br /> eli bit:non-unitary equipment.unitary equipment irskletl <br /> outdoors or in mach room adjacent to outdoors,equipment instaled during <br /> new construction.sheeand-core construction,or mlial knand improvement. <br /> 2016-025 <br /> Total Claimed Exempt Capacity: <br /> Total bu llding air aconom lzer capacity(If claimed>72,000 Bluth): • <br /> Ahe rnate C503.4 Exp 2 Capacity Limit: <br /> C503A Equip mentthatprovideshydronicchniedwefer"'chilled water,tennlnal cooling MARK DATE DESCRIPTION <br /> Btp3 units.Equipmern Part load cooling effickncy(RV)shalbe better Dian System ID Capacity <br /> Vii eq.i.dminimum efficiency by at kast25%.Pat building rem for (Btu/h) <br /> this exception as 480.000 BtWh cooling capacity or 20%of required <br /> budding at capacity"hchever k greater.Chllsd water <br /> terminal ands saving Group R occupancies are rot included in the <br /> building capacity total. <br /> Total Claimed Exempt Cap <br /> Total building air economizer capacity(If claimed>480,000131 <br /> Alternate C503.4 Exp 3 Capacity Limit: <br /> Table Compliance Optiats/oralferatbn orreplecemento/exisung System ID Equipment Compliance <br /> me C503.4 chanical cadhgequipmamWTable C5034.Refertotabk Type Path <br /> and all applicable table footnotes for ful requirements.Apples to <br /> the fobw,iris mt•oft conditions: <br /> Option a-Any new or replacement equipment <br /> Option b-Replacement equipment of same type w lh Sarre or <br /> rreSir cooing output capacity. <br /> Optionc-RePIa<enrem equipaem of score type w lh arge <br /> codirg output capacity. <br /> Option d-New aqupment added to existing system or <br /> repacemant equipment that is ddfereMthan ex'eting <br /> being replaced. <br /> B B <br /> • <br /> PRINCIPAL IN CHARGE: <br /> PROJECTMANAGER: <br /> PROJECT ARCHITECT: <br /> JOB CAPTAIN: <br /> DRAWING <br /> A ENERGY CODE A <br /> COMPLIANCE - E <br /> DRAWING <br /> 1 <br /> 1 2 3 4 5 6 <br />