My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3315 BROADWAY HOPEWORKS STATION 2 2026-01-02
>
Address Records
>
BROADWAY
>
3315
>
HOPEWORKS STATION 2
>
3315 BROADWAY HOPEWORKS STATION 2 2026-01-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2026 10:44:58 AM
Creation date
3/24/2025 11:22:06 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3315
Tenant Name
HOPEWORKS STATION 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 3 4 5 16 <br /> IRRIGATION NOTES: <br /> 1. ALL PROPOSED IRRIGATION AREAS WILL BE WATERED WITH A COMPLETE IN-GROUND AUTOMATIC <br /> IRRIGATION SYSTEM AS SHOWN. <br /> 2. THE CONTRACTOR SHALL VERIFY WATER PRESSURE PRIOR TO CONSTRUCTION.REPORT INSUFFICIENT <br /> MEASURED WATER PRESSURE TO THE ARCHITECT. <br /> 3. DO NOT WILLFULLY INSTALL THE IRRIGATION SYSTEM AS SHOWN ON THE DRAWINGS WHEN IT IS , <br /> OBVIOUS IN THE FIELD THAT OBSTRUCTIONS,GRADE DIFFERENCES,OR DIFFERENCES THE AREA <br /> YKEMAN <br /> DIMENSIONS EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE DESIGN.SUCH OBSTRUCTIONS <br /> OR DIFFERENCES SHOULD BE BROUGHT TO THE ATTENTION OF THE ENGINEER.IN THE EVENT THIS <br /> NOTIFICATION IS NOT PERFORMED,THE IRRIGATION CONTRACTOR SHALL ASSUME FULL ARCHITECTURE + DESIGN <br /> RESPONSIBILITY FOR ANY REVISIONS NECESSARY. <br /> 4. WHERE THE FIELD CONDITIONS REQUIRE ADJUSTMENTS,IRRIGATION SHALL BE ADDED OR DELETED IN <br /> ACCORDANCE WITH THE IRRIGATION LEGEND OR MANUFACTURER'S SPECIFICATIONS.PIPE SIZING <br /> SHALL BE ADJUSTED ACCORDINGLY,AND WATER VELOCITY SHALL NOT EXCEED 5 FEET PER SECOND. <br /> 5. THE IRRIGATION CONTRACTOR SHALL FLUSH AND ADJUST ALL LINES FOR OPTIMUM PERFORMANCE. <br /> 6. INSTALL BACKFLOW PREVENTION DEVICE AS REQUIRED BY LOCAL CODES AND HEALTH DEPARTMENT <br /> REQUIREMENTS. <br /> E 7. CONTRACTOR SHALL BE RESPONSIBLE FOR SLEEVES,CHASES AND PENETRATIONS UNDER PAVING, E <br /> THROUGH WALLS,ETC.,UNLESS OTHERWISE NOTED PRIOR TO PAVING AND FORMING. <br /> 8. THE IRRIGATION SYSTEM IS DESIGNED TO BE WINTERIZED THROUGH THE DRAIN VALVE AT THE POINTCONSULTANT: <br /> OF CONNECTION.COMPRESSED AIR CAN ALSO BE USED THROUGH THE QUICK COUPLER VALVE AT THE <br /> POINT OF CONNECTION TO BLOW-OUT THE SPRINKLER ZONE. <br /> ROADWAY 9. FOR DRIPLINE ZONES,USE 314-INCH PVC PIPE IN SLEEVES TO CONNECT PLANTING AREAS. <br /> CURB ROADWAY 10, COORDINATE ALL BUILDING PENETRATIONS WITH ARCHITECTURAL PLANS AND WATERPROOFING Z <br /> SECTION CONCRETE VALVE BOX WITH ¢ FINISH GRADE REQUIREMENTS. GGLO <br /> METAL LID 5 <br /> W U <br /> PLANTING STRIP m LL <br /> SIDEWALK1301 First Avenue,i t <br /> — <br /> III—I III <br /> LINE SIZE ISOLATION VALVE z III Seattle,WA 98101 Suite 301 <br /> mW � III <br /> IIII—III ROADWAY SLEEVE,SEE D2/L-541 w w - DETECT-A-TAPE SHALL BE 6" <br /> _ r BELOW TOP OF TRENCH GRADE http:/Avww.gglo.com <br /> o <br /> - - - <br /> IRRIGATION MAINLINE <br /> ALL BACKFILL SHALL BE MINERAL <br /> PLAN y <br /> o w _ DUCTILE IRON SLEEVE WITH MAIN ' <br /> ROADWAY OR LATERAL LINES&CONTROL <br /> o¢ WIRES IN CONDUIT&IN SLEEVE <br /> IIII—III IRRIGATION SLEEVE a O <br /> CURB <br /> •" PLANTING STRIP z NOTES: <br /> SLEEVE ID SIZE SHALL BE AT <br /> CONCRETEVALVE ____ __ LEAST2TIMES GREATER THAN <br /> III— BOX WITH METAL LID o - — OD SIZEOFTHEPIPES. <br /> ? SIDEWALK <br /> D DUCTILE IRON SLEEVING UNDER DUCTILE IRON ROADWAY D <br /> IRIGATION SLEEVE@)�AD�WAYg 2,._ .-0. HOPEWORKS <br /> PHASE 2 <br /> 10"VALVE BOX WITH LOCKING NOTES: LOOPED AND ZIP TIED 14 GA. FOR <br /> QUICK COUPLING VALVE LID 1. ASSEMBLY SIZE DETERMINED COMMON(WHITE),LEAD(BLACK) GRATED CAP <br /> CENTERED WITHIN BOX AND FINISH GRADE TO BE I", BY VALVE INLET SIZE. AND SPARE WIRES(ORANGE) FINISH GRADE Hopeworks & <br /> PLUMBED VERTICALLY OR SPECIFIED DEPTH OF 2. ALLTHREADED FITTINGSTO PLACE ALL SPLICES IN DBY SPLICE n <br /> PAVEMENT OR CURB - MULCH PLUS 1",BELOW RECEIVE TEFLON TAPE(3 KIT-PROVIDE A MIN.48"OF SLACK FINISH GRADE <br /> 3"MIN TOP OF SPRINKLER FLUSH WITH TOP OF VALVE BOX WRAPS MIN.). COILED WITHIN BOX III III— MULCH <br /> _ I I 3. ALL VALVES TO RECEIVE FLUSH WITH FINISH GRADE Housing Hope <br /> FINISH GRADE ` _ <br /> g MAX --\ CHRISTY'S 21/4"X23/4" -III III AT <br /> COMPACT NATIVE SOIL VALVE BOX WITH LOCKABLE LID III — - CAST IRON ROADWAY <br /> ELLS I.D.TAGS WITH BLACK 0.25 or 0.50 GPM BUBBLER BOX(W/WATER <br /> POP-UP SPRINKLER III . 0 14 GA.INSULATED LOCATOR LETTERS(BOTH SIDES)WITH COMPRESSION FITTING <br /> _ CONTROLLER STATION REMOTE CONTROL VALVE -III III — O PRINTED <br /> - - BARBED MARLFx INSERT ELL& 1"BRASS NIPPLE, WIRE(BLUE)FROM QUICK NUMBER,OR APPROVED WITH 18"COIL OF WIRE AND BRASS PIPE ON TOP,TYP) 3315 Broadway <br /> ° III STREET ELL LENGTH AS Q COUPLER LINE OR MAINLINE EQUAL. MALE REDUCER CHECK VALVE ADJUSTABLE EXTENSION <br /> —III— - EQUIRED WITH TERMINAL END IN DBY III III III— z O III <br /> _ POLY SWING PIPE,MAXMAX18" Q 4"-6"DEPTH DEPTH3l8"GRAVEL FINISH GRADE -III ROOT BAFFLE ASSEMBLY _ (AS REQUIRED TYP) Everett, WA <br /> -III III— —III— LENGTH BACKFILL OVER GEOTEXTILE — LINE SIZE GATE VALVE WI <br /> —III—III— III FABRIC FOR DRAINS ISOLATION VALVE WITH COPPER MECH.FLANGE FITTINGS <br /> O MALE REDUCER III III III— SWING JOINT SWEAT TO <br /> BARBED MARLFX INSERT ELL (2)PAVING BRICKS — -III THREADED �I - (2"&LARGER SIZE SHALL CONFORMED SET <br /> III—III—III _— STREET ELL Q III III SCH.80 NIPPLE ADAPTER HAVE A SQUARE TOP <br /> —III—III— —III- SCH.80PVC B0000 III— ACTUATOR TYP) 05/14/2018 <br /> 1'BRASS TxT 90 3'STEEL FARM FENCE POST III LATERAL TEE OR ELL <br /> III—III—III— III 0 WITH 3 FA SS CLAMPS,PLUMBED -i — DRAIN ROCK MIN.3"DEEP OVER -III o000�9��� III COPPER PIPE BRASS MAINLINE TO <br /> SCH.40 TEE VERTICALLY GEOTEXTILE FABRIC o0008� FROM METER DVCA/PRV <br /> 0 900�080p, ASSFMRIY <br /> 1"x3"BRASS NIPPLE — SCH.80 NIPPLE <br /> 45*A BRASS NIPPLE AT R ..... <br /> f l oo LATERAL PIPE <br /> _ 1�� 45°ANGLE IN RELATION SCH 40 PVC QUICK COUPLER LINE This Brewing is: <br /> C —III—III—III—III—III—III- TO QUICK COUPLER LINE OR MAINLINE WITH SxS 90 OR = BRICK OR CONC.BLOCK ROOT INTRUSION BARRIER 1.Copyright 2017 Dykeman,Inc. C <br /> LATERAL LINE SR <br /> TEE SCH.40 MAINLINE T OF 1-1/2' 2.The Architect's Instrument of Professional Service. <br /> WASHED ROCK\ / 3.For use on this project only.Obtain Architect's <br /> 1"BRASS TaT 90 SCH.40 TEE OR ELL.,TYP. NOTE:INSTALL FILTER OVER — — — — — — — — — written permission for any other use or reproduction. <br /> O 1"x3"BRASS NIPPLE III=III=III=III=III= —III= 8�®9vee FABRIC SLEEVE GEOTEXTILE <br /> SCH.40 ELL. FABRIC <br /> SCH 80 PVC SxT BUSHING PROJECT <br /> 2016033.00 <br /> POP-UP SPRINKLER QUICK COUPLER CONTROL VALVE ROOT WATERING SYSTEM CU VALVE IN PAVING MARK DATE DESCRIPTION <br /> C5 NTs RB 02/08/2018 Bid Set <br /> ADD 1 02/22/2018 Addendum#1 <br /> ADD 2 03/01/2018 Addendum#2 <br /> �z <br /> Uy <br /> B B <br /> 0 <br /> z • <br /> x o PRINCIPAL IN CHARGE:I M.SINDELL <br /> l SCH 40 PVC PIPE FROM FIRST FITTING TO CONTROL VALVES PROJECT MANAGER: I P.BENENATI <br /> PROJECT ARCHITECT: P.BENENATI <br /> CA <br /> SCH 80 PVC PIPE FROM FLOW SENSOR TO FIRST FITTING JOB CAPTAIN: I D.JEON <br /> FS FLOW SENSOR <br /> SCH 80 PVC PIPE FROM FIRST FRTING TO FLOW SENSOR <br /> CONCRETE VAULT WITH ADJUSTABLE PRESSURE REDUCING VALVE <br /> LOCKING METAL LID WITH UNIONS BRASS PIPE FROM DCVA TO FIRST FITTING <br /> DOUBLE CHECK BACKFLOW MASTER VALVE <br /> PREVENTER WITH BUILT IN UNIONS <br /> FINISH GRADE TO BE 1",OR SPECIFIED DEPTH QC QUICK COUPLING VALVE <br /> OF MULCH PLUS 1",BELOW TOP OF VAULT QUICK COUPLING VALVE w <br /> AND BOX " MV MASTER VALVE <br /> 1"BRASS CLOSE NIPPLE z <br /> CURBVALVE,SEE o <br /> C5/L-541 - _— �o PR PRESSURE REDUCING VALVE <br /> 2"zV BRASS BUSHING c>w <br /> 2" TxT"Z'BRASS TEE c CONCRETE VAULT <br /> OBRASS TxlT BRASS NIPPLE z w QCVA DOUBLE CHECK BACKFLOW PREVENTER <br /> O 90 ® (BOTH SIDES) <br /> xy <br /> 2"BRASS 90(BOTH SIDES)N o <br /> 2" GROUT OPENINGS,TYP. DRAWING TITLE: <br /> BRASS - 2"BRASS CLOSE NIPPLES <br /> PIPE <br /> __ _ _ LOOPED AND ZIP TIED 14 GA. <br /> INSULATED COMMON AND IRRIGATION A <br /> LEAD WIRES-PLACE ALL SPLICES IN <br /> A _ —III IIII III DBY SPLICE KIT-PROVIDE AMIN. DETAILS <br /> 6"DEPTH 518"CRUSHED AGGREGATE —III=III— III III III III III—III III— 48"OF COILED SLACK WITHIN VAULT <br /> COMPACTED TO 95%DENSITY OVER 1 CUBIC FOOT DRY SUMP LINED WITH FILTER FABRIC <br /> GEOTEXTILE FABRIC 40 MIL.PVC AND FILLED WITH 3/8"GRAVEL BACKFILL FOR DRAINS <br /> COMPACT NATIVE SOIL TAPE AT GROUTED AT BOTH ENDS OF VAULT UNDER WEEP HOLES,OR WATER SERVICE MAINLINE <br /> OPENINGS,TYP. PLUMB TO NEAREST DRAIN DRAWING <br /> Al DCVA/ PR/ MASTER VALVE ASSEMBLY IRRIGATION P.O.C. W/ MASTER VALVE IN VAULT DIAGRAM A5 11-111.1 <br /> 1 2 3 4 5 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.