Laserfiche WebLink
2 3 4 5 6 <br /> PLANT SCHEDULE <br /> TREES <br /> QTY. TAG BOTANICAL NAME COMMONNAME CAL. REMARKS , A <br /> 2 AGSB AMELANCHIER X GRANDIFLORA'AUTUMN BRILLANCE'SERVICEBERRY 1112' <br /> 8 CKMW CORNUS KOUSA VAR.CHINENSIS'MILKY WAY' CHINESE DOGWOOD 11/2' SINGLE STEM ARCHITECTURE + DESIGN <br /> 5 FORA FRAMNUS OXYCARPA'RAYWOOD ASH' RAYWOOD ASH 2112' TCLEAR <br /> 2 PPAP PYRUS PYRIFOLIA ASIAN PEAR 2" T CLEAR <br /> SHRUBS <br /> E QTY. TAG BOTANICAL NAME COMMON NAME SIZE MIN.HT REMARKS E <br /> CONSULTANT: <br /> 6 CSAF CORNUS STOLONIFERATARROW ARCTIC FIRE RED TWIG DOGWOOD 3GAL 1'-0" <br /> 43 LPBH LONICERA PILEATA BOXLEAF HONEYSUCKLE 3GAL ,'-0' <br /> 7 ROSM ROSEMARINUS OFFICINAUS'SALEM' ROSEMARY 3 GAL 1'-0" <br /> i6 FORM SROSMARINUS ARCOCOCCA U CIFOLI'TUSCAN BLUE' TUSCAN BLUE ROSEMARY 3GAL 1'-0" GGLOz. <br /> 18 SRSB SARCOCOCCA RUSCIFOLIA SWEETBOX 5GAL 2'1" <br /> 11 VBSB VACCINIUM'BLUE SUNSHINE' BLUEBERRY 5GAL 2'-0" NOTES: <br /> \ 1. INSTALLATION INCLUDES REMOVAL <br /> STAKES ONE YEAR AFTER INSTALLATION <br /> 2. SHAPE SOIL SURFACE TO PROVIDE 3' <br /> DIAMETER WATERING RING 1301 First <br /> WA venue Suite 301 <br /> 3. PROVIDE(3)EQUALLY SPACED TREE <br /> 8101 <br /> ANCHORS AND CABLES,PER TREE <br /> ORNAMENTAL GRASSES,PERENNIALS AND GROUNDCOVERS hltp:/Aaww.gglo.com <br /> RUBBER TREE COLLAR,1 PER CABLE <br /> QTY TAG BOTANICAL NAME COMMON NAME SIZE OC SPACING REMARKS <br /> SET TOP OF ROOT CROWN 2"ABOVE <br /> 338 ERHE EPIMEDIUM X RUBRUM HYBRID EPIMEDIUM ,GAL 12" FINISH GRADE <br /> 49 JECR JUNCUS EFFUSUS COMMON RUSH ,GAL 12" Nm 2"-3"MULCH DEPTH(TAPERED AT • <br /> 56 LAHB LAVANDULA ANGUSTIFOUA'HIDCOTE BLUE' HIDCOTE BLUE ENGLISH LAVENDER 1 GAL 18" 20 TRUNK) <br /> 70 LMLT LIRIOPE MUSCARI'BIG BLUE LILYTURF IGAL 18" REMOVE ALL WIRE&STRING,AND <br /> 48 LSSD LIRIOPE SPICATA'SILVER DRAGON' SILVER DRAGON LILYtURF IGAL 18" REMOVE ALL BURLAP FROM TOP 2/3 <br /> 10 PTJP PACHYSANDRA TERMINALS JAPANESE PACHYSANDRA 1 GAL 18" OF FOOTBALL <br /> 147 PAFG PENNISETUM ALOPECUROIDES'HAMELN' FOUNTAIN GRASS t GAL 12" <br /> 535 FALB PENNISETUM ALOPECUROIDES'LITTLE BUNNY LITTLE BUNNY DWARF FOUNTAIN GRASS 1 GAL 12" <br /> 71 PMSF POLYSTICHUM MUNITUM SWORD FERN ,GAL 1. <br /> 1/16"GALVANIZED TREE CABLE <br /> 191 SOPS SALVIA OFFICINALIS'PURPURESCENS' PURPLE SAGE ,GAL 18" <br /> VINES SEE NOTE 2 TREE ANCHOR,INSTALL PER <br /> MANUFACTURER RECCOMENDATIONS <br /> QTY. TAG BOTANICAL NAME COMMON NAME SIZE MIN.HT REMARKS PROJECT IDENTIFICATION: D <br /> 6 AQCV AKEBIAQUINATA CHOCOLATE VINE 1GAL 3'-0" <br /> 7 RRCB RUBUS ROLFEI CREEPING TAIWAN BRAMBLE 1 GAL Tl" III III I I I III <br /> 4 WZG ZINFANDEL GRAPE VITIS VINIFERA TINFANDEL' 1 GAL 3'-0" H O P E W O R KS <br /> - 11-1 1-1 1 -III I MI I <br /> II III III III PHASE 2 <br /> 11 <br /> III I III II FOR <br /> —11 -11 MI 111 —I <br /> I I III II 111 III Hopeworks & <br /> 1111 IIIIII^ 35GG [r 1 III II111 Housing Hope <br /> 1111111 CHP i 111-11 LIGHTWEIGHT SOIL AT <br /> = I BACKFILL MOUND,COMPACTED TO95% 3315 Broadway <br /> 11 - Everett, WA <br /> WATERPROOFING ASSEMBLY CONFORMED SET <br /> FLOORING ASSEMBLY <br /> 05/14/2018 <br /> TREE ON-STRUCTURE <br /> C J 3/4" <br /> This drawing is: <br /> C <br /> 1.Copyright 2017 Dykeman,Inc. <br /> 2.The Architect's Instrument of Professional Service. <br /> 3.For use on this project only.Obtain Architect's <br /> written permission for any other use or reproduction. <br /> PROJECT <br /> 2016033.00 <br /> NOTES: <br /> 1, INSTALLATION INCLUDES REMOVAL OF <br /> STAKES ONE YEAR AFTER INSTALLATION • <br /> 2. SHAPE SOIL SURFACE TO PROVIDE 3' <br /> DIAMETER WATERING RING MARK DATE DESCRIPTION <br /> 3. TREE CLEARANCES SHALL BE PER EVERETT <br /> STANDARDS. 02/08/2018 Bid Set <br /> 4. SEE EVERETT STANDARDS FOR TREE PIT ADD 1 02/22/2018 Addendum#1 <br /> DETAIL ADD 2 03/01/2018 Addendum#2 <br /> \ I STAKE TREE WITH(2)TREATED 2"DIAMETER <br /> LODGEPOLE PINE DOWELED TREE STAKES <br /> (8'4"LENGTH)LOOP EACH TIE AROUND HALF <br /> TREE LOOSELY TO PROVIDE V SLACK FOR <br /> TRUNK GROWTH <br /> "CHAINLOCK"OR EQUAL TREE TIE <br /> MATERIAL(V WIDTH)NAIL OR STAPLE <br /> 2'-0"MIN 3'-6"MII TREE TIE MATERIAL TO STAKE TO <br /> HOLD VERTICALLY.LOOP EACH TIE <br /> AROUND HALF TREE LOOSELY TO <br /> \�\�CL� PROVIDE 1"SLACK FOR TRUNK <br /> I GROWTH <br /> B SET TOP OF ROOT CROWN 2"ABOVE B <br /> SEE NOTE 1 ADJACENT CURB AND SIDEWALK GRADE --• <br /> PRINCIPAL IN CHARGE:I M.SINDELL <br /> 74'MULCH DEPTH(TAPERED AT PROJECT MANAGER: I P.BENENATI <br /> TRUNK) PROJECT ARCHITECT: P.BENENATI <br /> JOB CAPTAIN: D.JEON <br /> MULCH TREE PIT MIN 64"LENGTH X <br /> FULL PLANTING STRIP WIDTH BETWEEN <br /> CURB AND SIDEWALK(FOR PLANTING <br /> STRIPS LESS THAN 6-0"WIDE.)PROVIDE <br /> V-17,SEE 6-0"MULCH RING FOR PLANTING <br /> STRIPS WIDER THAN Vl" <br /> NOTE2 REMOVE ALL WIRE&STRING,AND <br /> REMOVE ALL BURLAP FROM TOP 213 <br /> SIDEWALK OF FOOTBALL <br /> B&BOR <br /> CONTAINERIZED - <br /> SHRUB <br /> ROUGHEN SIDES OF PLANTING HOLE <br /> ALL SHRUB AND GREEN SCREEN OR PERIMETER <br /> SET ALL PLANTS AT NURSERY MAXIMIZE EXCAVATED AREA WITHOUT <br /> GROUNDCOVER SPACING FENCE OR CONCRETE WALL LEVEL UNDERMINING ADJACENT PAVING/CURB <br /> TO BE EQUILATERAL PER PLANS \ rqJ "TREE PIT DEPTH=ROOTBALL DEPTH <br /> TRIANGLES TYP. I 3"MULCH MEASURE BEFORE DIGGING TO AVOID <br /> ( III , ..:. � �. ( <br /> TRAIN VINE AGAINST ADJACENT <br /> TYPICAL AT GROUND COVER - RE <br /> PLANTED AT NURSERY LEVEL SUPPORT,PROVIDE VINE TIE,TYP. SHRUB PLANTING PIT <br /> PLANT VINE AT THE SAME LEVEL AS PREPARATION=FOOTBALL DEPTH ^' III 18"DEEP ROOTBARRIERTYP. <br /> MIN.2"MULCH GROWN IN NURSERY &WIDTH PLUS 1'-0"ADDITIONAL 5.., _ WITHIN 10'OF PAVING <br /> —+ } } } ALL SIDES -:< DRAWING <br /> FINISH GRADE MULCH,TAPER TO AVOID CONTACT REMOVE CONTAINER OR III JJ <br /> ]VLWTO ROW SPACING WI STEM / REMOVE BURLAP FROM TOP 2/3 -DRIVE STAKES 6"T01'-0"INTO <br /> 60.0° D2D� REMOVE ALL BURLAP,WIRE, FINISH GRADE OF ROOTBALL.REMOVE ALL Eal1 I UNDISTURBED SOIL BELOW PLANTING <br /> A } + } + --_ STRING,AND CONTAINERS. FINISH GRADE WIRE AND STRING gl -- III—III III —III III FOOTBALL A <br /> -- SP ROOT BALL <br /> READ ROOTS III= = DETAILS & <br /> ADDITIONAL PLANTING AREA — <br /> D D PREPARATION PER DRAWINGS <br /> I _ T AMENDED TOPSOIL DRIVE STAKE AT FOOTBALL EDGE <br /> III �I <br /> PLANTING SOIL SCHEDULE <br /> i <br /> —+ } + FF qC/N -_ - '4 REMOVE ALL BINDINGS FROM NATIVE BACKFILL SOIL AMENDED MIN WIDTH OF TREE PIT=2TIMES FOOTBALL NATIVE BACKFILL SOIL AMENDMENT <br /> —L9yG GV TRUNK STEM PER SPECS WITH 25%(@1/3CUYD) <br /> S A <br /> DECOMPOSED ORGANIC MULCH <br /> — R c / <br /> - SCARIFIED SUBGRADE DIAMETER OR 5'-0'WHICHEVER IS GREATER ED E F PLANTED AREA - <br /> G 0 _ F—Ap <br /> NATIVE SOIL AND COMPACTED III _ _ _ _ _ _ I I �:.°::"'�`}f�`;;: . I <br /> — =F '�;;•V�:�;' �`,4•''�!";��;q-;:;��':'''',�`• UNDISTURBED SUBGRADE AMENDMENT FOR ENTIRE TREE PIT •- <br /> SPECIFIEDONPPLANS —III ��bp/�,G, = = SUBGRADE --- —"'— FOOTBALL WLMNOT SIN BASE K) MULCH AREA TO BE CLEAR OF GRASS,WEEDS, AREA X FOOTBALL DEPTH <br /> SCHEDULE IS —III—III—III—III—III—III— UNDISTURBED SUBGRADE(PROVIDES <br /> OR PLANT <br /> EQUAL TO SC ETC.TO REDUCE COMPETITION WITH TREE ROOTS FIRM BASE SO THAT FOOTBALL WILL <br /> NOT SINK) <br /> PLANT SPACING GROUND COVER PLANTING VINE DETAIL SHRUB PLANTING DECIDUOUS TREE IN PLANTER STRIP <br /> 0_71ANGIJLAR A5 3/4"=V-0" <br /> 1 2 3 4 5 6 <br />