Laserfiche WebLink
GeoTest Services, Inc. April 15, 2021 <br /> 3617 Upland Avenue, Everett,WA Project No. 21-0375 <br /> PURPOSE AND SCOPE OF SERVICES <br /> The purpose of this evaluation is to establish general subsurface conditions beneath the site from <br /> which conclusions and recommendations pertaining to project design can be formulated. Our <br /> scope of services includes the following tasks: <br /> • Explore soil and groundwater conditions underlying the site by advancing 4 test pit <br /> explorations via a track-mounted excavator subcontracted by GeoTest. <br /> • Perform laboratory testing on representative samples to classify and evaluate the <br /> engineering characteristics of the soils encountered and to assess on-site infiltration <br /> capability. <br /> • Provide a written report containing a description of subsurface conditions and exploration <br /> logs. The findings and recommendations in this report pertain to site preparation and <br /> earthwork, fill and compaction, seismic design, foundation recommendations, concrete <br /> slab-on-grade construction, foundation and site drainage, infiltration feasibility, <br /> temporary and permanent slopes, geotechnical consultation, and construction <br /> monitoring. <br /> • Assess Geologically Hazardous Areas (if present) per Everett Municipal Code (EMC). <br /> PROJECT DESCRIPTION <br /> The trapezoidal-shaped, approximately 19,600 square foot subject property is located on the <br /> northeast corner of Geyer Lane and Upland Avenue in Everett, WA. The project site contains an <br /> existing single-family residence with an attached garage. A driveway originating from Upland <br /> Avenue serves the existing garage. GeoTest understands that the subject property will be split <br /> into two single-family lots.The existing residence will occupy the new eastern lot and will remain <br /> as part of the new development. This residence will be renovated to include additional living <br /> space and a new detached garage. A new single-family residence will be constructed on the <br /> western lot. This residence will likely consist of a one- or two-story structure with a north-facing <br /> daylight basement. <br /> Due to the presence of a 10- to 15-foot-high steep slope that bisects the subject property, it is <br /> expected that some site grading will be required to establish a buildable lot adjacent (west) of <br /> the existing house. Preliminary information regarding infiltration or stormwater detention <br /> facilities was not developed at the time that this report was written. Any proposed facilities <br /> would likely be constructed on the northern portion of the new short plat. <br /> 1 <br />