Laserfiche WebLink
GENERAL NOTES <br /> 1. SEE SHEET D1.1 FOR PHOTO ORIENTATION AND LOCATION. <br /> REMOVE AND SALVAGE 2. THE INTENT OF THE DEMOLITION PHOTOS ARE TO SHOW <br /> STEEL FENCE AND GENERAL SCOPE OF ITEMS TO BE REMOVED/DEMOLISHED. <br /> 3= CAP SANITARY SEWER LINE DEMOLISH SANITARY DEMOLISH SELECT GATE, RETURN TO PORT THE PHOTOS ARE FOR REFERENCE ONLY AND TO <br /> E d AT NORTH EDGE OF SEWER, GAS, AND DIESEL UTILITIES IN PHASE 2, HIGHLIGHT ITEMS IN THE FOREGROUND TO BE <br /> MARGINAL FLOAT IN PHASE 2 LINES IN TRENCH, PROTECT-IN-PLACE FLOAT DEMOLISH SOUTHERN <br /> �a v REMOVED/DEMOLISHED. ITEMS IN THE BACKGROUND THAT <br /> n PROTECT-IN-PLACE FLOAT PORTION OF FLOAT A ARE NOT IDENTIFIED MAY REQUIRE DEMOLITION, SEE <br /> £ N DEMOLITION PLAN FOR EXTENTS OF WORK. THE <br /> a d CONTRACTOR SHALL VISIT THE SITE AND SURVEY THE <br /> SCOPE OF REMOVAL. <br /> 0 <br /> > N 3. ALL PILES THAT ARE IDENTIFIED TO BE DEMOLISHED ARE <br /> w H N TO BE FULLY EXTRACTED. <br /> «_ m 0 - 4. THE DEMOLITION BOUNDARY ILLUSTRATES APPROXIMATE <br /> Vrn EXTENTS OF DEMOLITION ABOVE THE WATER SURFACE AND <br /> Vr GROUND. ADDITIONAL DEMOLITION IS REQUIRED BELOW <br /> MIN GROUND AND WATER SURFACE. <br /> to$� s��.., ���������� •• •l� 5. UNLESS DEFINED ASECIOMPL TEFICALLY NDEMOLIITION, ROTED EMOVAL,DEMOLISH IS <br /> AND <br /> �` ♦_�, �,- _ -����� SATISFACTORY DISPOSAL OR RECYCLING. <br /> 7oar <br /> ♦ - ►an <br /> MIN 6. CONTRACTOR SHALL PROTECT—IN—PLACE ALL STRUCTURES, <br /> ♦ ------- UTILITIES AND OBJECTS NOT IDENTIFIED AS BEING <br /> ♦ ��• J�� DEMOLISHED ON THE PLANS. ANY DAMAGE TO ITEMS NOT <br /> ♦ ��,� � BEING DEMOLISHED SHALL BE REPAIRED OR REPLACED BY <br /> ♦ - THE CONTRACTOR AT THEIR EXPENSE. <br /> ♦ ♦' - PROTECT-IN-PLACE <br /> EX FUEL FLOAT AND <br /> �♦ / ` �� FLOAT A 7. PRIOR TO COMMENCING DEMOLITION ACTIVITIES, THE <br /> CONTRACTOR SHALL IMPLEMENT TEMPORARY EROSION AND <br /> SEDIMENTATION CONTROL (TESC). NO DEMOLITION MATERIAL <br /> OR DEBRIS SHALL BE ALLOWED TO ENTER THE WATER. <br /> o (SEE SHEET G3.1-G4.2) <br /> P1 PHOTO P2 PHOTO P3 PHOTO <br /> o PHASE 2 TRENCH LINE DEMOLITION PHASE 2 SURFACE FEATURE DEMOLITION FLOAT A TRANSITION DEMOLITION <br /> 0 <br /> N <br /> NDEMOLISH FX PROTECT—IN—PLACE DEMOLISH EX LEGEND <br /> o FLOAT A EX FUEL FUEL LINE <br /> sl FLOAT ALONG GANGWAY <br /> o DEMOLITION BOUNDARY PHASE 1 (SEE NOTE 4) <br /> Now <br /> 73 <br /> ��� <br /> g ����=- UTILITY OR STRUCTURE SALVAGE BOUNDARY <br /> �► I mmmmmmm DEMOLITION BOUNDARY PHASE 2 <br /> o - <br /> 0 <br /> o ■ ~ DEMOLISH SOUTHERN PORTION <br /> _ ■ OF FLOAT A IN PHASE 1 <br /> �i ■ ■ <br /> WE PHASE 2EWER PUMP OUT <br /> I, <br /> 0 0. <br /> E o <br /> of�2. DEMOLISH FX <br /> o DEMOLISH EX FUEL LINE ALONG <br /> o FLOAT A GANGWAY DEMOLISH GAS AND DIESEL <br /> P4 PHOTO FINGERS P5 PHOTO P6 PHOTO FUEL LINES IN TRENCH IN <br /> = PHASE 2 <br /> FLOAT A DEMOLITION PHASE 2 FUEL LINE DEMOLITION FLOAT A DEMOLITION AND PHASE 2 UTILITY DEMOLITON <br /> Ea <br /> E IF SHEET IS LESS THAN 22x34 <br /> v REDUCE SCALE ACCORDINGLY <br /> I o RN. WATSONENGINEER: SCALE: PORT OF EVERETT °W N D2 1 w <br /> - ���o>:*ess�gl N. W AS SHOWN <br /> ti DESIGNED BY: DATE: <br /> Port of =g'~� �'� ES PETERsoN DATE 2023 CENTRAL MARINA FUEL DOCK CP NO. <br /> EVERETT1Tff 2-0-073-01 <br /> DRAWN BY: CHECKED BY: C <br /> 16016th Avenue,Suite 1300 �slm�a��o ati B. MACHUS S. STAINER PROJECT c <br /> DEMOLITION PHOTOS N W <br /> N P.O. BOX 538 Seattle,Washington 98101 ® 04/11/2023 SS ISSUED FOR PERMIT REVIEW �a1P11 APPROVED BY: MR-GM-2023-°1 <br /> EVERETT, WA 98206 <br /> (206)382-0600 Fax(206)382-0500 AA <br /> o/ (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION SHEET NO. 12 OF <br /> a <br />