My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
610 14TH ST 2023 Plans 2025-03-28
>
Address Records
>
14TH ST
>
610
>
Plans
>
610 14TH ST 2023 Plans 2025-03-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 9:32:29 AM
Creation date
3/28/2025 9:29:23 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
610
Permit
PW2305-004
Year
2023
Notes
REPLACE EXTG FUEL DOCK WITH NEW, ADD ON-DOCK KIOSK, RESTROOM
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SALVAGE EX ICE BOX, REMOVE _ _ GENERAL NOTES <br /> AND SUPPLY To PORT r a 1. SEE SHEET D1.1 FOR PHOTO ORIENTATION AND LOCATION. <br /> 2. THE INTENT OF THE DEMOLITION PHOTOS ARE TO SHOW <br /> 41" ��� GENERAL SCOPE OF ITEMS To BE REMOVED/DEMOLISHED. <br /> d DEMOLISH .1 THE PHOTOS ARE FOR REFERENCE ONLY AND TO <br /> d _._. SANISAILOR HIGHLIGHT ITEMS IN THE FOREGROUND TO BE <br /> a I ■ N PHASE 2 REMOVED/DEMOLISHED. ITEMS IN THE BACKGROUND THAT <br /> ■ eleal ■� `. a ARE NOT IDENTIFIED MAY REQUIRE DEMOLITION, SEE <br /> N - ■� �� DEMOLISH SANISAILOR DEMOLITION PLAN FOR EXTENTS OF WORK. THE <br /> d d ■ \uUllUid N PHASE 2 <br /> CONTRACTOR SHALL VISIT THE SITE AND SURVEY THE <br /> d co ■ ■ � SCOPE OF REMOVAL. <br /> is <br /> > I "" � � DEMOLISH SANITARY • 3. ALL PILES THAT ARE IDENTIFIED To BE DEMOLISHED ARE <br /> N <br /> w n N ■ ■ ��� SEWER LINES IN TO BE FULLY EXTRACTED. <br /> c ° m PROTECT-IN-PLACE S l TRENCH IN PHASE 2, <br /> «_ '6 EX FLOAT IDENTIFY LINE COMING 4. THE DEMOLITION BOUNDARY ILLUSTRATES APPROXIMATE <br /> V rn I I ` ♦ FROM SANISAILORS EXTENTS OF DEMOLITION ABOVE THE WATER SURFACE AND <br /> ,;,o ■ � '� GROUND. ADDITIONAL DEMOLITION IS REQUIRED BELOW <br /> �J W ' I ■ GROUND AND WATER SURFACE. <br /> • -/ - : PROTECT-IN-PLACE 5. UNLESS SPECIFICALLY NOTED OTHERWISE, DEMOLISH IS; <br /> 11. , EX FLOAT DEFINED AS COMPLETE DEMOLITION, REMOVAL, AND <br /> ■-■�■ SATISFACTORY DISPOSAL OR RECYCLING. <br /> 6. CONTRACTOR SHALL PROTECT-IN-PLACE ALL STRUCTURES, <br /> UTILITIES AND OBJECTS NOT IDENTIFIED AS BEING <br /> •� DEMOLISHED ON THE PLANS. ANY DAMAGE TO ITEMS NOT <br /> BEING DEMOLISHED SHALL BE REPAIRED OR REPLACED BY <br /> THE CONTRACTOR AT THEIR EXPENSE. <br /> 7. PRIOR TO COMMENCING DEMOLITION ACTIVITIES, THE <br /> CONTRACTOR SHALL IMPLEMENT TEMPORARY EROSION AND <br /> a SEDIMENTATION CONTROL (TESC). NO DEMOLITION MATERIAL <br /> P7 PHOTO P8 PHOTO P9 PHOTO <br /> OR DEBRIS SHALL BE ALLOWED To ENTER THE WATER <br /> SEE SHEET G3.1-G4.2 <br /> SALVAGE ICE BOX DEMOLISH SEWER EQUIPMENT ( ) <br /> � DEMOLISH SEWER EQUIPMENT <br /> 0 8. DEMOLITION OF SEWER PUMP OUT AND SEWER LINES <br /> SHALL NOT OCCUR UNTIL PROPOSED FUEL FLOAT SEWER <br /> PUMP OUT IS CONSTRUCTED AND OPERATIONAL. <br /> 0 <br /> LEGEND <br /> SALVAGE AND SUPPLY i��■� �r �' <br /> SALVAGE EX SHED, REMOVE FLAGS TO PORT 1 <br /> o AND SUPPLY TO PORT ■ I �`. DEMOLITION BOUNDARY PHASE 1 (SEE NOTE 4) <br /> I <br /> ■mmiiiiiiiiia- I ■ ` moony' �m� UTILITY OR STRUCTURE SALVAGE BOUNDARY <br /> ■ I <br /> s PROTECT-IN-PLACE ■ ■ ,��� <br /> EX AT - mmmmmm■ DEMOLITION BOUNDARY PHASE 2 <br /> v SHACK <br /> ( DEMOLISH SANITARY <br /> SEWER LINES IN <br /> TRENCH IN PHASE 2, saY aiox � <br /> ter- IDENTIFY LINE COMING <br /> p FROM SANISAILORS <br /> DEMOLISH SANISAILORS <br /> ■ +IF'�'�"'f' „� ■ - IN PHASE 2 <br /> -- - <br /> OWN <br /> _- <br /> N _ I- PROTECT-IN-PLACE <br /> > {� 1 <br /> o PROTECT-IN-PLACE a ■ EX FLOAT <br /> EX FLOAT <br /> o � - <br /> o <br /> a v <br /> 0 3 <br /> E o <br /> m� <br /> cV j <br /> 0� <br /> �0 <br /> O_ <br /> 0 <br /> P10 PHOTO P11 PHOTO P12 PHOTO <br /> - SALVAGE SPILL CONTAINMENT SHED DEMOLISH ATTENDANT SHACK AND SALVAGE FLAGS DEMOLISH SEWER EQUIPMENT <br /> Ea <br /> E IF SHEET IS LESS THAN 22x34 <br /> REDUCE SCALE ACCORDINGLY <br /> c� 0 PROJECT ENGINEER: SCALE: PORT OF EVERETT DWG. NO. D2 2 r <br /> - ���o>:*ess�gl N. WATSON AS SHOWN ■ W <br /> ti DESIGNED BY: DATE: <br /> Port of =g'~� �'� ES PETERsoN DATE 2023 CENTRAL MARINA FUEL DOCK CP NO. <br /> 1TffEVERETT 2-0-073-01 <br /> DRAWN BY: CHECKED BY: C <br /> 16015thAvenue,Suite1300 �slm�a��o ati B. MACHUS S. STAINER PROJECT c <br /> DEMOLITION PHOTOS N W <br /> N P.O. BOX 538 Seattle,Washington 98101 ® 04/11/2023 SS ISSUED FOR PERMIT REVIEW �a1P11�'' APPROVED BY: MR—CM-2023-01 <br /> EVERETT, WA 98206 <br /> (206)382-0600 Fax(206)382-0500 AA <br /> o/ (425) 259-3164 PROJECT NO.1600120 NO. DATE BY REVISION NO. DATE BY REVISION SHEET NO. 13 OF <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.