Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Public Works <br /> WASHINGTON <br /> Supplemental Guidance and Project Forms for <br /> Minimum Requirements #1-9 <br /> The following information provides supplemental guidance and a general outline for Minimum <br /> Requirement (MR) #1-9 Stormwater Site Plans (SSP). This document is not exhaustive, and it is the <br /> applicant's responsibility to meet the requirements of Ecology's Stormwater Manual for Western <br /> Washington, current edition (herein, Manual),the Everett Municipal Code, and the City of Everett <br /> Design and Construction Standards and Specifications for Development (DCSS). Required forms <br /> are attached to the end of this guidance document. <br /> (Note: See the Small Project Site Plan/Repor for MR #1-5 projects.) <br /> STORMWATER SITE PLAN COVER bHtET <br /> • Project Name <br /> • Project Location <br /> • Owner and Applicant Contact Information <br /> • Date Prepared <br /> • Professional Engineer Certification and Stamp <br /> • Leave sufficient blank space for City stamping and signature. <br /> EXECUTIVE SUMMARY <br /> • Provide a brief overview of the project. <br /> • Summarize the applicable Minimum Requirements and Best Management Practices <br /> (BMPs) applied to the project. <br /> 0 APPLICABILITY OF MINIMUM REQUIREMENTS <br /> • Provide a narrative description for the determination of Minimum Requirement <br /> applicability and the factors considered to reach the determination. <br /> • Include a copy of the appropriate Flow Chart for Determining Requirements for New <br /> or Redevelopment from the Manual, and identify the decision path for determining <br /> the requirements. <br /> Minimum Requirement #1-9 Supplemental Guidance City of Everett <br /> Page 11 Aug 2022 <br />