My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 35TH AVE NE 2025-04-07
>
Address Records
>
35TH AVE NE
>
2801
>
2801 35TH AVE NE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:43:47 PM
Creation date
3/31/2025 10:04:09 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH AVE NE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Provide the TESC plans and include site-specific details for Construction <br /> Stormwater BMPs. All Construction Stormwater BMPs shall be shown on the TESC <br /> plans. <br /> • If project detention vaults or similar are used as temporary sediment ponds during <br /> construction, indicate on the TESC plans that the vault shall be cleaned prior to <br /> being brought into regular operation, which shall be followed by inspection and <br /> approval by the City. Include information on the TESC plans indicating how the vault <br /> will be dewatered during construction. <br /> Note: If the project requires an Ecology Construction Stormwater General Permit, <br /> the CSWPP prepared for the Ecology permit may be submitted to the City for <br /> review. However, it must meet all Manual and City requirements. <br /> MINIMUM REQUIREMENT #3 <br /> • All known, available, and reasonable Source Control BMPs shall be applied to <br /> projects. Source Control BMPs shall be selected, designed, and maintained in <br /> accordance with the requirements in the Manual and DCSS. <br /> • Complete the Source Control BMPs form, and attach it to the SSP. <br /> • Describe all anticipated activities that will occur on the site, even if those activities <br /> will be conducted by a tenant or other parties. <br /> • Describe any Structural BMPs and show them on the civil plans where appropriate. <br /> Note: MR #3 BMPs are not to be confused with Construction Stormwater BMPs. <br /> Any construction-related BMPs should only be included with the CSWPPP for <br /> MR #2. <br /> If a project requires an Ecology Industrial Stormwater Permit,the applicant <br /> may submit source control information associated with that permit. <br /> However, all Manual and City requirements must be addressed in the <br /> provided materials. <br /> 0 MINIMUM REQUIREMENT #4 <br /> Describe the existing natural drainage patterns and if the project will cause any <br /> changes. All discharges from the Project Site shall occur at the natural location to <br /> the maximum extent practicable. <br /> • Project runoff shall not adversely impact downstream receiving waters or <br /> downgradient properties. Provide a discussion on this. <br /> Minimum Requirement #1-9 Supplemental Guidance City of Everett <br /> Page 14 Aug 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.