My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 35TH AVE NE 2025-04-07
>
Address Records
>
35TH AVE NE
>
2801
>
2801 35TH AVE NE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:43:47 PM
Creation date
3/31/2025 10:04:09 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH AVE NE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- Assess potential off-site water quality, erosion, slope stability, and drainage <br /> impacts associated with the project, and describe the proposed mitigation <br /> measures. <br /> Off-Site Anal-` <br /> • Describe whether any upstream runoff will flow to the site and how it will be <br /> addressed in the design. Flow through from upstream properties, wetlands, or <br /> streams shall not be blocked by the project. The project shall not adversely impact <br /> downgradient properties. <br /> • Evaluate and mitigate any conveyance system capacity problems, localized <br /> flooding, erosion, slope stability, or similar issues. The City of Everett Stormwater <br /> Comprehensive Plan may have information on identified capacity issues near the <br /> project site. <br /> Developed Condition: <br /> • Describe the project's developed conditions. <br /> • Briefly describe how the Minimum Requirements will be met. <br /> • Describe how any site issues will be addressed (e.g., steep slopes, capacity issues, <br /> etc.) <br /> • Provide a drainage map showing the project's developed conditions with TDA <br /> boundaries and sub-basins. Label surface types and total areas in each TDA and <br /> sub-basin. <br /> Note: If there are multiple TDAs in a project, the TDA boundaries may be shifted, <br /> but the total runoff areas in each TDA must be maintained. <br /> MINIMUM REQUIREMENT #2 <br /> • The Construction Stormwater Pollution Prevention Plan (SWPPP) shall include a <br /> narrative to explain and justify the pollution prevention decisions made for the <br /> project and indicate all applicable Construction Stormwater BMPs that will be used <br /> to meet the requirements of the 13 Construction SWPPP Elements. <br /> • Submit the Construction SWPPP as a stand-alone document. Include a cover page <br /> with sufficient blank space for City stamping and signature. Complete and attach <br /> the Construction Stormwater Pollution Prevention Plan (SWPPP) form. Each of the <br /> 13 Elements must be considered and included in the SWPPP, unless site conditions <br /> render the Element unnecessary. <br /> • Attach sizing calculations for Construction Stormwater BMPs to the SWPPP. Verify <br /> that the correct method (e.g., the Rational Method or single event hydrograph <br /> method) per Manual BMP guidance is used to size TESC ponds. Refer to the DCSS <br /> for the total precipitation depths to be used in Everett. <br /> Minimum Requirement #1-9 Supplemental Guidance City of Everett <br /> Page 13 Aug 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.