My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 35TH AVE NE 2025-04-07
>
Address Records
>
35TH AVE NE
>
2801
>
2801 35TH AVE NE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:43:47 PM
Creation date
3/31/2025 10:04:09 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH AVE NE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUIRED FORM: Submittal Checklist <br /> The following information shall be included with the SSP to be considered a complete application. <br /> Otherwise, the project may be denied for drainage review. Review of the following may generate <br /> City comments that must be addressed prior to permit approval. <br /> Stormwater Site Plan <br /> pq Include a copy of the appropriate Flow Chart for Determining Requirements for New or <br /> Redevelopment identifying the decision path for determining the requirements. <br /> 0 Complete the Project Totals form and Source Control BMP form. Attach these forms to the <br /> SSP. <br /> 0 Describe how the project meets all Minimum Requirements. Provide conveyance and <br /> backwater analyses, as required. Attach all supporting information: modeling, calculations, <br /> GULD letters, etc. <br /> 0 Include both an existing and a developed basin map. Indicate TDA boundaries. Identify <br /> project sub-basins. Label surface types and total areas in each project TDA and sub-basin. <br /> 0 Attach a copy of the signed geotechnical report. <br /> ❑ Attach a copy of related permit approval letters, if applicable (e.g., Ecology General <br /> Construction Stormwater Permit, JARPA, HPA). Indicate if the project has other regulatory <br /> requirements such as Ecology industrial stormwater permits or MTCA. <br /> 0 Not applicable <br /> ❑ Does the application involve an Underground Injection Control (UIC) well? If so, the Public <br /> Works Permit will not be issued until registration with the Washington State Department of <br /> Ecology is provided along with associated documents. For further information, refer to <br /> Ecology's Online UIC Injection Well Registration website. <br /> 0 Not applicable <br /> ❑ Attach a copy of related studies (e.g., wetland studies), if applicable. <br /> F] Not applicable <br /> Additional Submittals <br /> 0 Provide separate civil plans showing site grading, the stormwater system layout, <br /> maintenance access, and site-specific BMP details. Show stormwater-related tracts, <br /> easements, and setbacks. <br /> 0 Provide the Construction Stormwater Pollution Prevention Plan form as a stand-alone <br /> document, and attach applicable BMP sizing calculations. Provide associated TESC plans. <br /> Minimum Requirement #1-9 Project Forms City of Everett <br /> Submittal Checklist 11 Aug 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.