My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 35TH AVE NE 2025-04-07
>
Address Records
>
35TH AVE NE
>
2801
>
2801 35TH AVE NE 2025-04-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:43:47 PM
Creation date
3/31/2025 10:04:09 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH AVE NE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUIRED FORM: Construction Stormwater <br /> Pollution Prevention Plan (SWPPP) <br /> Include this form with the project's Construction SWPPP. The Construction SWPPP shall include a <br /> cover page, supporting narrative, related calculations, and TESC Plans in addition to this form. The <br /> Construction SWPPP is required to be kept by the contractor performing the work at the job site for <br /> reference, and the SWPPP shall be updated as needed throughout the duration of construction. <br /> Project - . <br /> Project Name: 28TH PLACE INDUSTRIAL SOUTHWEST STORAGE YARD <br /> Project Address: 28TH PL NE & 35TH AVE NE Permit Number: PW2306-015 <br /> LContact ., <br /> Prepared by: DAVID HARMSEN Date: 08-22-2023 <br /> Primary contact name: JAMES POWER Primary contact phone: 425-837-9720 <br /> Primary contact email: jpower@seaconllc.com <br /> 0 Task 1: Describe the project during construction. <br /> Nature and purpose of the construction project: <br /> Gravel storage yard for the storage of construction materials. <br /> Adjacent areas, including streams, lakes, wetlands, residential areas, and roads <br /> that might be affected by the construction project: <br /> None. <br /> How upstream drainage areas may affect the site: <br /> No upstream drainage contributes to the site. <br /> Minimum Requirement #1-9 Project Forms City of Everett <br /> Construction Stormwater Pollution Prevention Plan (SWPPP) 11 Aug 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.